Loading...
HomeMy WebLinkAboutBrown Construction for Unforseen Soil Conditions Import additional CY N. Black Cat TrunkRECE~VF,~ MAR 1 g 2"~ City Of Meridian City Clerk Office Memo To: Jaycee Holman; Tara Green , From: Clint Dolsby, P.E., Assistant City Engineer CC: Thomas Barry, Public Works Director Date: 03/19/2008 Re: Proposed Agenda Items for March 25, 2008 City Council Meeting The Public Works Department respectfully requests the following item be placed on the March 25 Ciry Council agenda, under consent agenda, for Council's consideration: Change Orders No. 4 and 5 for the North Black Cat Trunk Sewer. Additional work is required for the North Black Cat Trunk Sewer. This change order consists of the following work. This makes the total changes from Change Order No. 1, 2, 3, 4 and 5 equal to 1.19% of the original contract amount • Due to unforeseen conditions Brown Construction imported an additional 5,680 cubic yards in January and 6,976 cubic yards in February. Brown Construction, Inc. has submitted cost estimates for these change orders as summarized below: Change Order No. 4 $11,360.00 Change Order No. 5 $13,952.00 Summary of Change Orders 4 and 5 $25,312.00 Recommended Council Action: The Public Works Department recommends that City Council approves Change Orders No. 4 and 5 for the North Black Cat Trunk Sewer with Brown Construction, Inc. for $25,312.00 and authorize the Mayor to sign them. Task Order No. 0750 -Sewer Main Extension at Powers Residence. Civil Survey Consultants, Inc. has submitted a task order, scope of work, and budget for the engineering services. They propose to complete the work for $7,490. This is an extension of the miscellaneous wastewater services agreement approved by City Council on the 12~' of December, 2006 for the Engineering Services for Miscellaneous Wastewater Projects. This project provides engineering services to construct approximately 200 feet of sanitary sewer from the sewer trunk to S. Mustang Street. • Page 1 CHANGE ORDER 4 PROJECT: North Black Cat Trunk Sewer DATE OF ISSUANCE: 2/12/08 EFFECTIVE DATE: OWNER: Primeland Development Co. LLP CONTRACTOR: Brown Construction, Inc. ENGINEER: JUB Engineers Page I of 2 You are directed to make the following changes in the Contract Documents. Attachments: Explanation of additional costs. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT T[MES: Original Contract Price Original Contract Times $ 1,717,487.31 Substantial Completion: .168 Dam - Mav I, 2008 R f Fi l P 213 D J I S 2008 une or na ayment: ays - , eady days or dales Nct Changes from previous Change Orders No. I to No. 3 Nel Changes from previous Change Orders No. t to No. 2 $ (4 978 00) z.s , . Drays Contract Price prior to this Change Order Contract Times prior to this Change order Substantial Completion: Ib8.5 Davs - May 1.2008 $ 1,712,509.31 Ready for Final Payment:: 213.5 Days -June 15.2008 days or dales Net Increase (decrease of this Change Order) Net Increase (decrease of this Change Order) $ 11 360 00 0 , . days Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: Days - 170.5 $ 1,723,869.31 Ready for final payment: Davs - 2.15.5 days or dales RECOMMENDED BY OWNER: By: Date: 2/ 12/08 APPROVED BY OWNER: ACCEPTED BY C NTRACTOR: I~ By: Date: Z` .. ~ ~ ~g Tammy de Weerd, Mayor Date Date: Attest:• .,City Clerk Tay c to ~ rrb... Date: Approved by City Council: Page2of2 North Black Cat Trunk Sewer Change Order 4 Due too unforeseen soil conditions, Brown Construction was required to import an additiona15,680 CY of imported trench backfill above and beyond the 4,271 CY as identified in the bid schedule for the project. In accordance with page 17, Part 4.1.D.1 of. the Project Manual this additional material will be billed at the unit rate of $2.00/CY as specified in the accepted bid. Brown Construction, Inc. 6881 Bennett Road Nampa, ID 83686 Phone: (208) 465-0274 Fax: (208) 465-3532 Primeland Development 3.120 W. Belltower Drive Suite 100 Meridian, ID 83646 Attn: Glenn Fitch PAY REQUEST #1: ITEM: IMPORTED TRENCH BACKFILL QTY: 740 CY PAY REQUEST #2: ITEM: IMPORTED TRENCH BACKFILL QTY: 9,211 CY CALCULATION BREAKDOWN: LINEAR FEET OF SEWER TRENCH= 1357 AVERAGE DEPTH OF SEWER TRENCH= 28.20 FT SUBTRACT 3 FT =PIPE ZONE (PIPE AND BEDDING) SUBTRACT 3 FT= ROAD BASE (PIT RUN SECTION, ~;" ROAD MIX, ASPHALT ) TOTAL = 22 FT AVERAGE DEPTH OF IMPORTED TRENCH BACKFILL (22 FT x 9 FT WIDE x 1357 LF)/ 27 = 9,951 CY TOTAL OF IMPORTED TRENCH BACKFILL: REQUEST #1 + REQUEST #2 = 9,951 CY 740 CY + 9,211 CY = 9,951 CY