HomeMy WebLinkAboutJanuary 17, 2008 P&Z MinutesMeridian Planning & Zoning
January 17, 2008
Page 13 of 39
Moe: It's been moved and seconded to close the Public Hearing on AZ 07-019. All
those in favor say aye. Opposed same sign? That motion carries.
MOTION CARRIED: ALL AYES.
Moe: Okay.
Rohm: Mr. Chairman?
Moe: Mr. Rohm.
Rohm: At this time I'd like to make a motion to move onto City Council recommending
approval of AZ 07-019, to include the staff report as written.
Newton-Huckabay: Second.
Moe: It has been moved and seconded to approve moving on to City Council approving
AZ 07-019. All those in favor say aye. Opposed same sign? That motion carries.
MOTION CARRIED: ALL AYES.
Item 8: Public Hearing: AZ 07-020 Request for Annexation and Zoning of 21.81
acres from RUT to R-15 zone for Chalet Marseilles by RC Meridian
Partners, LLC - NWC of E. Ustick Road and N. Locust Grove Road:
Item 9: Public Hearing: PP 07-027 Request for a Preliminary Plat approval with
3 residential building lots and 1 common lot in a proposed R-15 zone for
Chalet Marseilles by RC Meridian Partners, LLC -NWC of E. Ustick
Road and N. Locust Grove Road:
Item 10: Public Hearing: CUP 07-023 Request for Conditional Use Permit for 122
multi-family dwelling units in a proposed R-15 zone on approximately 21.8
acres for Chalet Marseilles by RC Meridian Partners, LLC -NWC of E.
Ustick Road and N. Locust Grove Road:
Moe: At this time I'd like to open the Public Hearings on AZ 07-020, PP 07-027, and
CUP 07-023 and go with the staff report, please.
Parsons: Thank you, Mr. Chairman, Members of the Commission. The applications
before you tonight are an annexation and zoning of 21.8 acres from RUT, Ada County,
to R-15, medium high density residential. A preliminary plat approval of three
residential lots and one common lot, Conditional Use Permit approval to construct a
multi-level development consisting of 122 condo units and a clubhouse. A private street
application for eight private streets within the proposed development and alternative
Meridian Planning 8 Zoning
January 17, 2008
Page 14 of 39
compliance to allow the construction of a 36 foot street section to accommodate eight
foot parking aisles along one side. The site is located on the northwest corner of Ustick
Road and Locust Grove Road.. The property is bordered on the north by Quenzer
Commons Subdivision and an LDS church -- Quenzer Commons and the LDS church
site -- a different church site. To the south is Howell Track Subdivision and Wanda's
Meadow, zoned R-8 and R-4. To the west is a single family residence in Wanda
Meadows, zoned RUT, Ada County, and R-4. And to the east is the Summerfield
Subdivision, zoned R-4 and RUT, Ada County. The site currently contains an existing
single family home with associated outbuildings. The submitted plans indicate all
existing buildings are to be removed to make way for the proposed multi-family
development. It's kind of hard to see, but there is an existing residential home on the
site right here in the corner. The applicant is requesting approval of four lots consisting
of three residential lots and one common lot. Primary access to the site will be via
North Locust Grove Road to and from East Monet Street. It is important to note that the
proposed alignment of said roadway is not adjacent to the roadway east of the site.
Staff has received written comments from ACHD supporting the alignment of the
proposed streets. Furthermore, there is an existing LDS church site directly to the
north. This site has a full access driveway approximately 30 feet north of the proposed
public street. If the church were to request annexation into the city, staff would probably
condition that the church -- church's full access driveway be vacated.. Therefore, staff is
supportive of the applicant's proposal to construct East Monet Street along the north
property line, this way the church can take access from Monet Street and not Locust
Grove Road in the future. So, here is where they are proposing access onto Locust
Grove. That existing public street is just a little bit northeast of it and, then, again, the
existing church driveway stub is right about in there. So, sometime in the future we are
expecting if this church site is to come in, that they would be able to stub somewhere
within this public street. In addition, North Heritage View Avenue will be extended from
the north to provide access and connectivity to the residential subdivision. North
Heritage Avenue and North Jardin Avenue, both public roadways, will be stubbed to the
southwest for future connectivity to adjacent properties. There is an existing eight foot
wide strip between Wanda's Meadows and the subject site. The applicant has stubbed
North Heritage View Avenue to the south in alignment with Yellow Peak Avenue, so the
properties will be interconnected when the Widson property develops in the future. The
applicant is proposing to construct anorth-south public street along the east side of the
Widson property, so it can effectively develop in the future. So, again, here is where
they are proposing to extend the public street into the Quenzer Commons Subdivision.
However, this south end of the street will be stubbed. This is the Widson parcel and
currently it goes -- it's a single family residence here. And., then, he also owns about an
eight foot strip of land in between the two roadway sections, which doesn't allow that
connection between that public street and North Yellow Peak Street here. Again, here
is -- the applicant is proposing this public -- north-south public street here. That's
Jardin. And that's going to be built as a forty 40 foot section and., then, that would allow
this -- whenever this parcel comes in for development, to build out the remainder ten
feet and, then, the applicant could possibly come in and develop that site and have
Meridian Planning 8 Zoning
January 17, 2008
Page 15 of 39
access onto Locust Grove, rather than Ustick. In conjunction with the public streets, the
applicant is proposing to construct eight private streets to the -- to provide access and
circulation within this development. The proposed private streets are all internal to the
development and are not to -- are to be constructed as a 36 foot street section that
includes a five foot wide sidewalk on one side, two foot rolled curbing, two ten foot wide
travel lanes, and an eight foot parking area and one foot ribbon curb. So, the private
streets are located here, here, here, east to west here. Located north, south, east, west
along here, here, and there. Again, each of them will have the five foot sidewalk on one
side and also eight foot of parking on the other and fire department has approved that
street section. What staff is also recommending is -- it's hard to see on the site plan or
the preliminary plat here, but there is a five foot sidewalk here. Staff would prefer that
sidewalk be located on the other side of the roadway south of that and that way
whenever this .connectivity happens, this parcel comes in and this roadway is able to
connect, there will be pedestrian connectivity along into that subdivision to the south.
Which is Wanda's Meadows. Before I go any further, it's important to note that staff has
not approved of this site plan. Or has not approved the site plan. Excuse me. The
applicant is proposing several different structures on the site. The site is expected to
develop with 40 buildings, including the clubhouse. The mix of buildings includes two
single detached buildings, 14 bi-unit buildings, and 23 quad unit buildings, totaling 122
units. The two building footprints for the subject site include a large floor plan totaling
66 units and the other, the small floor plan, which totals 56 units. The site is expected
to develop with the eight smaller bi-unit buildings and ten smaller quad unit buildings
located primarily internal to the development. The larger unit buildings are located
along the perimeter of the development and consist of two single unit buildings, six bi-
unit buildings, and 13 quad unit buildings. All of the units have attached two car
garages with a parking pad in front of each unit. So, the reddish units -- the reddish
color units are the larger floor plans and., then, these yellow colored are the smaller floor
plans, again, internal to the development, primarily, except for these three and, again,
this is along the perimeter. Staff is not supportive of the shared drive aisles and parking
pads for the units located along the perimeter of the project and the one quad unit
building located on Lot 1, Block 2. Staff believes that the parking pads in front of each --
in front of the garages should be 20 by 20 and provide a 20 foot drive aisle, 65 feet
length total, to accommodate vehicular maneuverability or shorten the parking pad to
five feet in length or less to discourage parking in front of the garages, 35 length total. If
the pads are constructed as proposed, being they are 50 foot between garage fronts,
then, cars will be tempted to park in front of the garages, thus, blocking the drive aisles.
All of the internal units comply with this parking and drive aisle back-up requirement.
Staff realizes that all of the units may not be able to comply with and suggests that the
applicant reconfigure the site plan to have at least 75 percent or 92 units comply with
the single family parking requirements. The other additional parking for the 30 units,
without parking pads, with the five feet in front of the garages, would be on the private
streets as proposed. So, to kind of explain this a little more -- a little further, I have kind
of created a diagram for you tonight. Here is a typical layout that we have. The
applicant -- here is your 20 foot shared driveway. From garage face to garage face it is
Meridian Planning 8~ Zoning
January 17, 2008
Page 16 of 39
50 feet. So, what I have done is kind of just scaled out -- there are -- I'd like to point out
there are 20-by-20 pads in here. However, the total length here is 50 feet. So, if an
applicant -- if someone were to say park eight cars within that and they were -- that
leaves -- and they are -- most of the average cars are 16 feet in length, that doesn't
leave you much in between here -- or much radius to turn these vehicles -- get these
vehicles out of here. So, that's why staff has kind of put that condition on the application
to revise the site plan, because we feel that is a significant change to where it would
probably change the layout of their -- their site plan quite a bit and that's why we had
requested them to bring a site plan --anew site plan before you this evening. So,
again, if you will, with the 20-by-20 pad, that leaves you a ten foot drive aisle,
essentially, between the four units there abutting each other. The landscaping buffer
proposed with the development complies with the UDC. However, the submitted
landscape plan does not show the foundation plantings, the five perimeter landscaping
along shared driveways and the landscaping for the proposed pathway as required by
the UDC. Staff has conditioned the above-mentioned items comply with the UDC
landscaping requirements. The applicant is required to provide amenities for the multi-
family development. The applicant provided amenities -- has provided amenities as
follows: A 5,240 square foot community clubhouse with fitness facilities, stadium
seating theater, a gathering area with commercial grade kitchen and swimming pool.
The entrance of the clubhouse will be accented with a courtyard and water feature.
Other amenities include a walking trail around the perimeter of the property, covered
pavilion with barbecues, tennis courts, putting green, a community rose garden, a plaza
area, and open grassy areas and an oval track. Staff believes the applicant has done a
great job providing amenities within the proposed development. So, if you look at the
submitted landscaping plan, this is where they have a walking path that goes with --
along the perimeter of the property as part of their amenities. Here is where the
clubhouse is going to be centrally located. Again, that's 5,240 square feet. The
swimming pool is located in that area. The plaza, the courtyard, and the water feature
to the entrance of the clubhouse is located here. This is another common area, a plaza
area. I believe the community rose garden is located here. And, then., within here is the
tennis court and some other amenities. The oval track is located on -- outside of that as
well. And, again, there is some parking stalls here, a guest parking and guest parking
there. And those two are -- meet code requirements also. The applicant has submitted
building elevations for all of the proposed buildings, including the clubhouse.. There are
four types of elevations proposed, two for each of the larger footprints and two for the
smaller footprint buildings.. Both product types are shown to be constructed of stucco
with substantial stone accidents, architectural -- architectural roofing shingles, covered
entrances, and tall entry doors. Some of the other accenting features include copper
metal roofing on the eaves of the proposed smaller units and the chimneys of both the
larger and smaller units, arched windows, board and batten and shake single siding,
accenting the front facades of the larger units. The clubhouse is proposed to be
constructed of board and batten and shake siding with the accented stone front facade
highlighted -- highlighted by an entryway rotunda. The majority of the windows are
arched and accented with shutters. Staff likes the appearance of the proposed
Meridian Planning & Zoning
January 17, 2008
Page 17 of 39
buildings and any future buildings shall substantially comply with the construction
materials and design elements shown in these elevations. Furthermore, staff believes
that no more than two buildings in a row should be -- should have the same elevation.
So, here is the smaller units that they are proposing, the small footprints. It's hard to
deviate, but these are two different -- this is the one elevation, the front and rear, and,
again, here is the type that they are proposing for the smaller unit. You can see the little
difference in the dormers located on each one of those. Again, these chimneys are to
have the copper accents. You can see the stone located on there. The arch or the
covered entryway, the tall eight foot doors, and, again, that famous character in the
larger units, this is the larger footprint. There is the board and batten. The shingle-type
shake siding accents on there. And, then, the clubhouse -- again, there is the rotunda,
entry rotunda. Again, this is -- has the arched glass ways located here and here, the
copper siding, metal roofing on the ends. And, then, again, accents here with the
shingles and, then, the rock that's carried along the front facade of that building. Staff
has also received a letter from John Widson requesting denial of the project and that
should be included in your packet as well. And staff also received comments from the
applicant's representative regarding several conditions of approval for the proposed
development and should be included in your packet as well. Staff -- again, staff is
recommending a revised site plan and continuance to review the new site plan prior to
recommendation onto City Council. This concludes my presentation. I'll stand for any
questions Commission may have.
Moe: Thank you very much. Any questions of staff at this time? Okay. Would the
applicant like to come forward?
Fluke: Mr. Chairman, Members of the Commission. Thank you very much. My name is
Darin Fluke, with JUB Engineers, 250 South Beachwood in Boise. We are representing
the applicant in this matter. Bill did a fine job explaining the application by the numbers
and I'm not going to go -- going to go back through those numbers. I think we are in
large part in agreement with the staff and where we are not, I'd like to just touch on
those things. First, though, Iwill -- I would like to just speak to sort of how we got to
where we are today and I have just got a few slides to go through for you. We started
this project back in June, meeting with staff. We met with staff no less than four times
on this project formally and informally many times over the phone and., again, at the
counter. We held two neighborhood meetings and we have gone through several
iterations of the site plan and we think we have come up with a plan that really works
well for the site and works well for my clients as well. What you see here on the first
slide is a color rendering of the clubhouse. That is in excess of 5,000 square feet and
does include those amenities as described by Bill. This is sort of a gathering point for
the community and it has been located internally and I'll talk about that a little bit more in
just a second... Do you have the next slide, Bill? You know where it's -- where we are
located there, at the northwest corner of Ustick and Locust Grove. The previous
application you saw was right here. It will be some nice amenities for this project, in
addition to the commercial properties that are already in the neighborhood. This is the
Meridian Planning 8 Zoning
January 17, 2008
Page 18 of 39
plat. You have seen this before. I'll just talk about a couple of things on this, as far as
the site design goes. Our initial layout had a connection to Ustick Road here and ran a
road up much like you have seen here. In talking with staff there was some preference
-- I should say at the neighborhood meeting there was a strong preference to not have
our connection to Ustick Road be our primary connection in this location and so we
changed it for that reason and that affected some other things in the layout and we
ended up with a layout that didn't include a road fronting this -- this large -- well, it's a
one acre parcel, more or less, here, with a single house and some out buildings right up
here near the front. The initial reason that we laid it out that way was to provide access
to this parcel for future development. We assume it will develop in the future and that
was the best way to do it, given the really skinny nature of that lot. When the neighbors
indicated a preference to not have us make the connection right there and rather make
it over here, we ended up with a layout that didn't include the road there and staff didn't
like that and so we went back and redesigned again for a third major redesign and this
is what we came up with. So, we do accommodate this lot. This will make it really easy
and convenient for this lot to develop in the future. All the utilities will be in that road.
Basically, they will add curb, gutter, and sidewalk on their side and they will be good to
go. The public road does connect here to Locust Grove. We worked extensively with
ACRD on that. We could have brought it further to the south to increase the offset from
this road to our east, but ACHD's preference was to get the connection as far away from
the intersection as we could and so that's why we shoved it all the way up here, with the
added benefit of providing access to the church site there at some future point, should
they desire. I'll stress again that is a public road and so they will have easy access to
the road if they want to redesign that site. The public road comes in and, then, extends
up this way. There is an existing stub here in Heritage Commons or Quenzer
Commons, I guess, is the name of that project. And, then, it will align with this stub
street here. And as was pointed out by staff, there is an eight foot strip of land that is all
the way along there and connected to that that we have no control over. So, at the
point that this develops in the future, our assumption is that that will be made to
connect, but we simply can't do a thing, that we don't own the land at this time. We like
this layout for a number of reasons, but we -- in particular, we like the clubhouse
centrally located here and, then, our open space amenity centrally located here. Those
are located away from the property lines. Those are activity centers within the project
and so located internally they will be buffered from adjoining land uses and from our
neighbors that are internal to the project. One thing that staff didn't mention and that
want to mention for you is this is intended as what's called an active adult community.
It's designed and will be marketed to empty nesters. Those people typically 55 years of
age and older, and that's enforced not through codes, covenants, or laws, but just
through the design of the project and the amenities within the project. The project is
such that it will be an upscale place to live. It won't be cheap to buy into this project
and, basically, it's not designed in a way that's conducive to having families or people
who are young and don't intend to spend time in the dwellings and so it will be marketed
that way, it will be built that way, and we intend to see this thing built in in a single
phase. We will go through and do it -- we will plat it all at one time and, then, go
Meridian Planning & Zoning
January 17, 2008
Page 19 of 39
through and build it bit by bit all in one phase. Bill talked a lot about the amenities, so
I'm not going to go back into those. I just want to talk a little bit about some of the
issues that were raised in the staff report. I'll call them issues, although they really just
need a little clarification. With regard to fencing, there will be -- here is the landscape
plan. Let's go ahead and go through all the slides, Bill. This is, again, a color rendering
of the large floor plan here, with the -- the garage unit and, then, the side unit there.
And, then, these are floor plans. This is for the smaller unit, which you can see has a
bedroom and a bit large master bath closet and, then, a study or den type area and the
kitchen here. This is the garage. And., then, this is the larger unit, which has two
bedrooms, plus the den, in addition to a little work area in the garage there and you can
-- there would be the option to add a bonus in the -- sort of a loft unit in the second story
of that building. They are single story buildings, but there is room to add a loft within
there, if a client were so inclined. With regard to fencing if we could just see the site
plan, Bill, or the plat. While we are finding that, let me talk about one other thing,
because I think my clock's ticking here. I did notice in the staff report that there was a
requirement for centralized mailbox locations, as well as a directory map. Those do
come from standards relating to the multi-family developments. We do intend to have
centralized mail box locations within the project, probably in two locations somewhere in
the front part here and probably over near the court -- clubhouse there. We would ask
to not -- not have the map, though. That is intended typically for projects where -- that
are more like apartments where you have unit .numbers and you don't have street
locations. All of these units will be addressed off of streets with distinct names and they
will be just as easy to find your way around in there as any residential project. With
regard to fencing, we do intend to have a masonry block wall around the project in that
location there and, then, along the church here. Again, that -- this will be public right of
way and so to fence this here, we will have a license agreement or an easement with
our neighbor to the north to do that and if they are inclined, that's the intent of my clients
on that. With regard to -- there is only, really, two things that we don't agree with staff
on. We are fine with the comments regarding landscaping. We do intend to landscape
around all the buildings and we will do a better job of showing on the landscape plan,
but that is all included. The two things we don't agree with -- I'll just take the minor one
first and this is a very minor issue, is the issue of moving the sidewalk on Monet from
right here down to here. We like the way we designed it, because the sidewalk benefits
the project a little more that way. When this road does connect, there is sidewalk on
both sides of the street and, then, the sidewalk here will connect with the sidewalk here
and provide connectivity out his way or you can just simply cross the street and have
connectivity this way. And so we don't -- I mean it's not a huge issue for us, but we
would ask that you allow us to just build that the way we had designed it. The bigger
issue for us is -- is the issue regarding parking. And, Bill, maybe we could see your
diagram on that. I want to point out to the Commission that -- that this is amulti-family
project and is subject to the requirements for multi-family projects within the City of
Meridian. We do comply with the parking standards for multi-family projects and I would
just respectfully disagree with the staff that by condominiumizing this project that we
would all of a sudden be a single family project. We would not, by definition, because
Meridian Planning & zoning
January 17, 2008
Page 20 of 39
these buildings contain three or more units and are on a common piece of land, they are
a multi-family project, not a single family project. So, that's the first thing. We comply
with the code as written. We comply with all the rules. The second thing is I just platted
a project very similar to this called Cedar Springs Townhomes just a mile or two to the
west where we did exactly the same thing., shared driveways -- those are single family
lots. Each one of those buildings sits on -- they share a common wall, but they all sit on
their own property and within that project we did exactly the same thing that we are
doing here, a 50 foot drive court, with a 20 foot shared drive throat, just like you see
here. What staff has shown you is, basically, you know, the worst case scenario that
you could ever expect, which would be 16 cars within that space, two in every garage
and, then, two out in front. In Cedar Springs the fire department had asked us to sign
this as no parking out in the driveway and that's, really, the way it's intended to function.
That's how it will be written in the declaration is that this area is not intended to be for
parking. It doesn't mean that you can't pull your car in there and wash it, but it does
mean that you can't just store cars here, because this area is meant for the
maneuvering of vehicles and in any scenario but the one that's been drawn here, these
work perfectly well. And there are numerous locations in the City of Meridian where
they have been approved and we would just respectfully ask the Commission to
approve what we have designed here, simply because we don't have the right room to
go and add an additional 15 feet to even 75 percent of the buildings that are drawn. If
we do that, by our calculation, we would lose at least four units and possibly more. We
didn't redesign the site, because we feel like we have been through enough iterations
and we have come up with a plan and a concept that works really well for this site and
really well for the target community that's going to be living here. I think that's all that
have for you. Again, we are in -- mostly in agreement with the staff report. I will just
quickly point out the conditions where I would like consideration from the Commission if
you're so inclined. The first is 1.4.1, which is the condition that would require us to
.redesign and resubmit a site plan. I'd just simply ask that you strike that condition and
approve the site plan as we have drawn it.
O'Brien: What page is that on, sir?
Fluke: That page is on -- it's on Exhibit B and the page is not numbered. But it's in the
conditions of approval Exhibit B. The last page that's numbered in front of that -- well,
it's the elevations that are right in front of that.
O'Brien: Okay.
Fluke: The exhibits aren't numbered, so 1 apologize.
O'Brien: Thank you.
Fluke: The next condition is 1.4.6, just one page later. That is the -- moving the five
foot sidewalk along Monet. Again, we think that the layout that we have works just fine
Meridian Planning & Zoning
January 17, 2008
Page 21 of 39
and we'd respectfully ask you to approve that the way that it's drawn. 1.4.16 would say
that if we -- when we bring a condominium in that we have to comply with the parking
standards that we just talked about. I would again ask you to just strike that condition.
1.4.17, asks for centralized mails box locations and a directory site map. I'd simply
request that you strike the directory site map. We are fine with the mail boxes. That's
all I had. I appreciate very much staff working with us on this. Again, we have been at
this for half a year or more. They have been great to work with. We are in agreement
with the conditions, with the exception of those that I pointed out and I think this is a
project that Meridian will be very proud of once it gets built. With that I'd stand for any
questions.
Moe: Thank you very much. Any questions? Yes, Tom.
O'Brien: Yes, Mr. Chairman. Is there any separators between the garage or the areas -
- the parking areas for excess parking? I see lines there, but is that a wall? Is there a
sidewalk or a curb or --
Fluke.: Mr. Chairman, Commissioner, that was simply for graphical purposes. There
would not be any sort of divider in there. That's all intended and will function as
common area and be indicated as such within the condominium declarations. So, that
area will be -- in fact, you know, what you see here outlined will be owned by the
condominium association and maintained by the association, not by the individual
homeowners.
O'Brien: Okay. Thank you.
Moe: Mr. Fluke, can you go back over your fencing one more time? Were you just
anticipating you're doing block walls on just two locations?
Fluke: You can anticipate it around here and we will submit to a condition to that effect.
And, then, we intend to have it along here as well, but, of course, we need -- because
this is public right of way here, don't want to end up with the same situation that we
have here where there is a small strip of land preventing access to the public right of
way. And so we will work with our neighbors to make it happen there. We intend to
have it there, but we are really sort of at their mercy as far as that goes.
Moe: Okay. What are you doing now, then, on the Locust Grove and --
Fluke: Those are -- would be landscape buffers along this area. There is a berm and
dense plantings.
Moe: Okay. And let's go back to the parking issue one more time. You discussed --
am assuming you'd have no problem, then, putting up no parking signs and whatnot
through there. In fact, that was what you needed done.
Meridian Planning & zoning
January 17, 2008
Page 22 of 39
Fluke: It's an esthetic concern for us, but if that made the Commission more
comfortable -- and, honestly, we anticipate that from the fire department anyway, so, no,
we don't -- we wouldn't object to that.
Moe: Okay. Any other questions?
Newton-Huckabay: Mr. Chair? Mr. Fluke, I'm curious about the -- is the block wall a
result of your neighborhood meetings? It seems odd to put a block wall between
residential backing up to residential.
Fluke: Mr. Chairman and Commissioner, it's not. That's always been the intent of my
clients. I think it's more of a buffering scenario where they are trying to sort of establish
a feel of exclusivity within the project.
Newton-Huckabay: How tall of a block wall are we talking?
Fluke: Mr. Chairman, six feet.
Newton-Huckabay: Six foot. And what kind of a block wall? Is it like the cottage stones
or --
Fluke: It would be the CMU block with probably the corrugated face to it. You know,
split faced CMU. And I apologize that we don't -- don't have a drawing of that for you.
Newton-Huckabay: Now, that wall is not sitting on top of a berm also, was it?
Fluke: No, ma'am.
Newton-Huckabay: Okay. I have no other questions right now.
Rohm: I want to go back to that parking again. Could you put your slide back up, Bill?
Do you have any additional pavement or pier so when this car backs out does it have
something to back into there?
Fluke: We can certainly add the pop outs and that was a discussion that we had with
staff when we saw the condition of approval. I would point out that in all the meetings
that we went through with staff we were informed that we had a 45 foot minimum
garage to garage in there and so when we designed it 50 feet, we thought we were
exceeding it and everybody would be happy. When we saw the condition we did offer
to do pop outs here and staff wasn't receptive to that, but, again, I would make the offer
to the Commission if you would feel more comfortable with the pop out there, we have
designed one and, Mr. Chairman, if I -- maybe the Commission could just pass this out
and., then, I'll leave it with staff, but this shows how it might work.
Meridian Planning & Zoning
January 17, 2008
Page 23 of 39
Rohm: Yeah.. My concern is if this person is backing out, only if this spot right here is
not -- there is nothing there at the moment, because they are going to have to back up
far enough that they can turn to head -- head out and Ijust -- I think that if you don't
have that availability here, there could be some issues for that end unit being able to
actually back out and head back out to the main roadway.
Fluke: Mr. Chairman, if I might just respond to that. I would agree with you if all we had
-- if the scenario was what you see right here, but we can show you that there is room to
come out and avoid that and come into anywhere within here, or even to back out if
need be. Having said that, we are fine adding the pop outs to those driveways. I mean
our preference would be to limit, you know, pavement the best that we can within the
project and, again., our -- the target market is such that -- and it's reflected in our traffic
study as well, that this population just doesn't drive as much as a typical subdivision and
so I think the activity levels that we will see in this project are -- are not what you would
see in a typical project, even next door to us. But, again, Mr. Chairman, we would be
just fine with that pop out.
Rohm: Okay. All right. Thank you.
Moe: Another question I have. I noted the staff, basically, that the two options were to
either make it wider or bring them in and why did you guys not consider bringing them a
little closer, basically, then, at that point discourage them even trying to do that, so --
Fluke: Mr. Chairman, we -- because we don't -- we don't anticipate a parking problem
within here and we would like to provide a little more maneuverability within the parking
areas. Again, it provides a little more margin for cars that are maneuvering in those
driveways to move around and we would just prefer to have it the way we have it
designed.
Moe: I guess that's where we can agree to disagree, then, simply because I would
anticipate if you move a little closer you're still going to have the availability of that free
movement, you're just -- you're just going to be, basically, one car less parking itself out
there., you know. But that's okay. Any other questions of the applicant at this time?
Okay. Thank you very much.
Fluke: Thank you.
Moe: Well, I'm not sure that you guys understood that there was asign-up sheet back
there, but no one has signed up on the -- for this, so at this time if there is anyone that
would like to speak to this, just raise your hand and I'll call you up at that point. Yes, sir.
Come forward.
Meridian Planning & Zoning
January 17, 2008
Page 24 of 39
Larsen: Thank you. I'm Jeff Larsen. 7427 Miriam Way in Salt Lake City, Utah. Partner
in this development. And just to -- if I may comment about that parking. Just -- you
mentioned that there was -- the staff suggested that we move them closer.
Moe: Yes.
Larsen: What their requirement was, the way I understood it, was that they said 70
percent -- I believe it was 70 percent they wanted to widen and, then, 30 percent they
would allow to be narrower. So, it really isn't a situation where they want all of the
parking narrower, they wanted 60 -- or 75 percent of the units at 65 feet and 30 -- or 25
percent at 35 feet. Does that make sense?
Moe: I understand. And we are going to talk to staff here in a minute about that.
Larsen: Okay. Great. Thank you.
Moe: Thank you. Bill, can you respond to that at the present time?
Parsons: Sure, Mr. Chairman, Members of the Commission. We had talked -- when
we met with the applicant we had spoke to them going either/or scenario. Darin kind of
spoke to it. We are in a conundrum here. We have amulti-family development, but
once they condo it we are going to look at it -- we are applying single family standards,
like we did with the Gramercy project. So, we tried to -- I tried to come up with -- staff
tried to come up with a compromise as to what could we do to try to get the best of both
worlds and they thought that the 75-25 was the fair way to go. Now, if you guys feel
there is something else, wanted 50-50 or all of them meet that 35 feet in between
garage to garage, staff would be -- I mean it's your ball. But that's kind of where I --
staff came up with that 75-25.
Moe: Thank you very much. Is there anyone else that would like to come forward?
Okay. Mr. Rohm, you look like you have another question.
Rohm: No. I just -- I keep looking at staffs drawing on the parking and, quite honestly,
appreciate the applicant's response to that. I think he's probably right that the -- all four
of those locations are not going to have a car in them at all times. They are going to
park in a garage and the -- that space is going to be open and even though it looks from
the staffs drawing that it's going to be congested, the congestion would only occur if, in
fact, all those 20 foot pads were occupied with a vehicle and I concur with the applicant
that that's probably not going to happen often and -- other than I would say that I think
that the applicant should extend that tip out for those units, so that they can back
around and head out without having to cross over to the adjacent unit to get that turning
radius.
Rohm: Thank you very much.
Meridian Planning & Zoning
January 17, 2008
Page 25 of 39
Newton-Huckabay: Mr. Chair?
Moe: Commissioner Newton-Huckabay.
Newton-Huckabay: May I ask a question? Are these the one -- these are the one
bedroom or the larger -- or the two bedroom units?
Moe: These are the large units.
Newton-Huckabay: Those are the two bedroom units?
Parsons: Yeah. Mr. Chairman, Commissioners, yeah, those -- that is the larger unit
there along that perimeter. So, those would be up to 2,000 square foot units.
Newton-Huckabay: Okay. And it's just the ones -- oh, it's on the north.
Parsons: I'd like to point out, too, that -- one thing I failed to mention, too, that they kind
of redesigned this southeast corner as well and that's -- that's what it's supposed to look
like. If -- if this goes forward, they are going to revise the site plan regardless for City
Council, obviously, hopefully, to show that at least. But it was not depicted on this site
plan either. But this is what it's going to look like in that corner with the units.
Newton-Huckabay: You're -- Mr. Chairman, Bill, you're whipping that thing around
there pretty fast. What are you circling there?
Parsons: Okay. This -- fire didn't like this shared driveway here, how they came in and
wrapped around to the rear of the building here.
Newton-Huckabay: Okay.
Parsons: So, the applicant revised that southeast corner and now they are proposing
this layout in the corner. So, that way you don't have that driveway coming up here and
accesses those.
Moe: Okay. Commissioner O'Brien, do you have some thoughts?
O'Brien: Yeah. I don't know where we are going with this thing, but I don't know what
the storage capacity inside the -- the buildings are and is there -- so, I guess the
question would be is there any space in the garage to have some kind of storage? I
know a lot of people they have storage units somewhere else, but the point is if they
have adequate storage where it would not cause a vehicle to be parked outside the
garage area and if there is -- has that been a problem in some of the other places --
projects in the past is that people were forced, so to speak, to park their vehicles
Meridian Planning & Zoning
January 17, 2008
Page 26 of 39
outside the garage, because they didn't have adequate storage and didn't have another
storage unit somewhere else for things. I know this is probably because my son and
daughter-in-law -- or my daughter and son-in-law park one of their vehicles outside,
because they don't have enough room.
Newton-Huckabay: Commissioner O'Brien, I would argue that's not a problem with
storage, maybe, it's a problem of pack rats.
O'Brien: Yeah. I understand. Yeah. Well, you know, not everybody's clean and sheen
and -- and I was just wondering I was just wondering if that's the question or if that's
been an issue with -- in projects where people would have to park. I know a certain
percentage I'm sure do, but don't know what that might be. Anybody --
Marshall: If they -- if they had made that a no parking area --
O'Brien: Yeah. That would be good.
Marshall: Yeah. I think that's --
O'Brien: No permanent parking or whatever.
Marshall: Yeah. If they displayed signs and made that apart -- a condition that -- that
there would be no parking in that area.
Hood: Mr. Chair, Members of the Commission. Excuse me. You know, the ultimate
situation for us would be the redesign, because I agree with the applicant that
esthetically having signs on the garage doors or on the fascia or something saying no
parking there is a little tacky. So, that's why we went with the redesign option.
Certainly, I believe that's the next best option, however, though, because -- if you can
go back, Bill. It certainly doesn't take all eight cars to be there. In fact if two cars are
parked there you certainly create asituation -- if this car is here and this car is here and
I'm backing out of my garage, it's nearly impossible for me to back up. I have to do
about a 15 point turn to turn around and get out of there. So, it's certainly not all eight
cars have to be there to have a problem, it can just be one across from you and trying to
back up and get out of there.. So, that's why staff brought this up and thought it was
important enough to bring it up as an issue. I understand from the applicant that in their
covenants they will prohibit them from storing things in their garages and that they have
to have car parks. I also understanding it's a 55 and older community, but, you know,
those people are still active, have friends, people come over, play cards, whatnot, and
you are going to have guests and they -- particularly on the end units aren't going to
want to park on the street over here in the middle of January to go over here. They are
going to be tempted to park in the driveways and I do see that -- that situation occurring.
And not to be stereotypical, but sometimes if it's dark at nighttime, you're getting in your
car backing up, I'm guilty of it, I don't look behind me, I see -- now, they are not major
Meridian Planning 8 Zoning
January 17, 2008
Page 27 of 39
accidents, but I see, you know, minor fender benders there, if you just don't look and
that's really why they have brought that situation up as an outstanding issue. So, I hope
answered your question. I know I went a little bit of an editorial spin there, too, but --
O'Brien: You did real well.
Marshall: I have got another question. Has condition 1.4.3, with the different building
elevations, have we come to some type of agreement there? It appears staff and the
applicant are at loggerheads there.
Newton-Huckabay: We haven't discussed it.
Moe: There has been no discussion, but, staff, if I remember Bill going through that,
just wanted to make sure that the -- there was no more than two of the same next to
each other, other than that, that they were -- they were okay with -- with the elevations.
Marshall: To clarify that, the purpose for having more than two buildings together with
the same elevation is --
Parsons: Mr. Chairman, Commissioner Marshall, when -- again, when we got the letter
from the applicant they were going to propose something different tonight, but, however,
speaking with the applicant they are okay with no more than two units in a row. If I can
go back to the site plan here. The reason being is these are going to be pretty large
buildings. Typically, you don't want to have a monotonous theme going on within the
development. We want variation in there and that was the purpose of that condition.
Marshall: So, the applicant has agreed to do no more than two in a row?
Parsons: That is correct.
Moe: Okay. Yeah. Sir, please come forward.
Krupa: I have never done this before, so --
Moe: Name and address and, then, you can go for it.
Krupa: Okay. Tim Krupa. I'm at 1662 East Summer Cove Court in Summerfield
Subdivision, and I guess I have a couple questions. The gentleman here had
discussion about neighborhood meetings and not being familiar with this, I don't know if
it included the surrounding area or -- because I don't think anybody in Summerfield that
I know received any notification of any meetings. That was my first point, I guess,
because, in fact, at Summerfield and the exit there where the LDS church is going to be
the main exit, I thought that would be a little bit pertinent to the subdivision there where
Meridian Planning & Zoning
January 17, 2008
Page 28 of 39
all the traffic is going to be coming out on Locust Grove there and might affect the
subdivision a little bit.
Moe: Well, the answer to your first question is, basically, public notice does go out to all
neighbors within a 300 foot radius.
Krupa: My neighbor across the street got one, so I must be 301 feet and beyond.
Moe: Yes. That was my guess.
Krupa: I thought that was correct. But I didn't know how that worked.
Moe: But at least you know your neighbor had one. There you go.
Krupa: That's exactly right, so --
Moe: Okay.
Krupa: And I didn't know if -- by the plat at the corner of Locust Grove and Ustick on the
-- where that old farm house is, is that going to be realigned to be five lanes or four
lanes, to make the street align that way?
Moe: I'd probably have to ask staff that, but I'm not sure that they'd even know that.
That's more on ACHD.
Krupa: Okay.
Moe: Bill, do you have any idea on that?
Parsons: Mr. Chairman, give me a moment, please, so I can --
Moe: I will.
Parsons: -- get the draft staff report here.
Krupa.: And was there any concern with probably three-quarters of the residents there
coming out on Locust Grove with their main entrance there, just having one entrance
out there, rather than going Through the subdivision where most of the traffic will come
out on Locust Grove, was that a traffic concern?
Newton-Huckabay: They opted for that, rather than Ustick.
Krupa: Okay.
Meridian Planning & Zoning
January 17, 2008
Page 29 of 39
Newton-Huckabay: Because Ustick is the more heavily traveled arterial.
Krupa: Okay.
Newton-Huckabay: So, fhat was the --
Krupa: Have you noticed the traffic since the overpass has been on, where everybody's
getting off Eagle and going up Locust Grove now. That was -- I guess I have seen a lot
of that since the overpass, people aren't using Eagle Road -- I mean they are pushing
back to Locust Grove now and using that quite a bit. That's why with 122 units you got
240 cars multiple times coming in and out of there and I didn't know how much of a
traffic issue that's going to be dumping out on Locust Grove just from that one
intersection there by the church.
Newton-Huckabay: Well, it certainly will increase your traffic. I think an adult
community is going to be less traffic than a 122 multi-family would, you know, but --
Krupa: All right.
Newton-Huckabay: -- it will increase traffic. ACRD didn't indicate that it would overload
the intersection.
Krupa: Okay. And I didn't know why they -- I mean they said they were trying to go
down on Ustick, but that was nixed, I guess. I'm not sure why they didn't put another
exit down there, just to have another entrance there, but -- okay.
Moe: Okay.
Parsons: Sorry, Mr. Chairman. Speaking with the applicant, he's -- and looking at the
ACRD report, it looks like some of those projects are out six to ten years on Ustick and
11 to 20 years on Locust Grove. But there are some provisions to do some -- the right
of way will be dedicated to ACRD for those future improvements.
Hood: And just to follow that up, I understand there is -- due to the existing
configuration I think they were going to patch in a little bit of that -- that corner there, so
it's -- the barricades will come down and you would have the -- a free right, essentially, if
you're heading west onto Ustick from Locust Grove. So, that will be cleaned up -- that
side of the road will be cleaned up, but it won't be widened to its ultimate street section
for -- as Bill mentioned, a longer time frame, six to ten years or 11 to 20 years on Locust
Grove.
Krupa: So, there is no plan for the developer to widen the whole section there, so that
it's smooth like that?
Meridian Planning & Zoning
January 17, 2008
Page 30 of 39
Moe: No.
Krupa: Okay. Is that -- I guess that's standard that they don't have to do that as part of
the he development process, to make the road easier that way for the traffic?
Moe: They didn't design it that way and they weren't requested to do it, so --
Krupa: Okay. Thanks.
Moe: Thank you.
Newton-Huckabay: Mr. Chair?
Moe: Yes.
Newton-Huckabay: I recommend we close the Public Hearing on AZ 07-020, PP 07-
027, and CUP 07-023.
Rohm: Second.
Hood: Mr. Chair? Before you do that you should probably let the applicant have the
last word.
Moe: I'm sorry. You're absolutely right.
Newton-Huckabay: Oh, my mistake.
Moe: Would the applicant like to come back up
Newton-Huckabay: Fire me.
Fluke: Thank you, Mr. Chairman. Darin Fluke, again, representing the applicant. I
don't have much to add, unless the Commission had questions. Just with regard to the
road issue here on Locust Grove and Ustick there, I think probably everybody who lives
out there recognizes the trouble with the intersection, just because the right of way --
ACRD was not able to obtain the right of way on -- on this corner right here, primarily
because of where the house is right now. I mean they were going to have a road right
in their bedroom if they did that and so that's why the road wasn't -- right of way wasn't
dedicated. However, with this application we will be dedicating the additional 23 feet,
which is going to give ACRD 96 feet of right of way on all legs and it's our understanding
that, then, the highway district will improve the intersection, just as Caleb described, so
-- so, that you don't have that choke point there right now, other than Locust Grove
won't be widened out at this time, but you will get the turn lane here added to -- I mean
Meridian Planning 8 Zoning
January 17, 2008
Page 31 of 39
Ustick won't be added., Locust Grove will have the turn lane added to it. So, unless the
Commission had questions, I didn't really have anything else to add.
Marshall: One last question.
Fluke: Yes.
Marshall: About your CMU fence along the -- on the southeast section on the north side
of that, against the church, you say it's a six foot CMU. How far are you proposing to
run that out? If the intention is for -- when the church comes into the city, will that
exclude access to the road there?
Fluke: Mr. Chairman -- and that's why we will have to work with them, because the
fence would have to go on their property. The right of way will be platted right up to the
property line and so we don't have any land left to put the fence on and if the fence gets
built it will be on the church's property. And so it will be on their terms, if the fence is
built along that section there. It's my client's intent to build it here, but, again, we have
to have a license agreement or an easement from the church to do that and, then, we
would still, obviously, have to comply with the fence regulations of the city.
Moe: Okay. Thank you very much. Want to do that again?
Newton-Huckabay: Mr. Chair?
Moe: Yes.
Newton-Huckabay: I recommend we close the Public Hearing on AZ 07-020, PP 07-
027, and CUP 07-023.
Rohm: Second.
Moe: It's been moved and seconded twice to close the Public Hearing on AZ 07-020,
PP 07-027, and CUP 07-023. All those in favor signify by saying aye. Opposed same
sign? That motion carries.
MOTION CARRIED: ALL AYES.
Moe: Any other comments from the Commission? Mr. Marshall, do you have any?
Marshall: My first thought is that this is an appropriate place -- looking at the future land
use map, is an appropriate place for amulti-family development. I worry that CMU walls
and even elevations tend to start to give an institutional look. I like the -- the elevations
on the clubhouse and the like, but all other elevations appear to be somewhat even and
across. I think it's an appropriate use of the land and the future tie in to Wanda's Place
Meridian Planning & Zoning
January 17, 2008
Page 32 of 39
providing an outlet to Ustick further down away from the intersection seems appropriate.
I do worry about the parking. I am concerned that -- that people will park in those
locations, even -- even marked, because in January it does get cold and you don't want
to walk across the street to get there and if the availability is there, it will be used and
even if it's just one car for half an hour, your neighbor's going to get pretty darn mad
when they can't get out of their garage, my first few thoughts. I guess that's all I have.
Moe: All right. Any other comments?
Rohm: Well, I think that before a motion is made we need to have some sort of
consensus on whether or not we are going to go with the staff recommendation that
they redesign it with the widen space between the units or if we are going to go with the
applicant's scenario and accept it as it's currently designed and it's of little value to start
a motion without having some feel for what the balance of the Commission feels on that
specific issue and my personal opinion is I think the applicant did a good job responding
to the staff report and I would be in support of leaving it as it's currently designed.
That's -- and I do think that they should put the tip out, so that they can turn back out
and have something to turn into if there is a parking -- if there is cars across the way,
preventing them from just backing straight into the -- across the way. So, with that tip
out I think that issue would be addressed for those end units. But that's my position on
this and I'd like to get a feel for what the balance of the Commission's opinion is.
Moe: I would agree there, Mr. Rohm. You guys have talked, so I'll talk a little bit and
we will see what you guys think. I -- as far as the overall project and whatnot, you
know, I do like the fact that there are some restrictions as far as how many units go side
by side and whatnot. I like the look of the buildings and whatnot and I think it will be a
nice facility. The block wall, I'm just not sure that that's really esthetically for the area
out there. I think those will be about the only areas that you go block walls surrounding
a facility out there, so that's going to be a little bit different look, but with split face block
and depending upon how it's done, it will look good,. As far as the sidewalk and whether
or not we put it on one side or the other, I have no problem putting it -- changing that --
that comment from staff and leaving it in and putting it on the other side of the street. I
don't know that they are gaining much either way on that. The directory and whatnot, I
can understand that we get rid of that as well. I don't have a real problem with that. But
I do have a problem with the parking area. I just got a -- I'm very concerned that that is -
- that's a tight area and just logically speaking I think you're going to end up with cars in
there all the time and I do believe it's going to be a problem. I think there was -- you
know, some real effort with staff to -- you know, they kind of agreed on a few things on
this project with the developer and whatnot and they have asked that that be revisited
and they'd rather not do that and that is a problem to me, because I do see that it's
going to be a problem and I am not sure I could move this thing forward based upon the
parking layout. Mr. O'Brien.
Meridian Planning & Zoning
January 17, 2008
Page 33 of 39
O'Brien: Yes. Thank you. Mr. Chairman, so I -- I'll start off with the sidewalk. I don't
have a problem with leaving it as designed from the applicant, since it is coordinated
with the one across the road and keeps it in line with that. I think that would be okay. I
do have a problem with the -- with the parking myself. I really think it should be
increased for some of the reasons I mentioned earlier, but that's not the do all to end all,
just think there is going to be a time, like the Chairman -- Mr. Chairman said, there is
going to be a conflict somehow and I just hate to see people have these fender benders
and it causes dissension between neighbors if those things happen. The mailbox I don't
have a problem with leaving that as designed by the applicant and it doesn't have to
include maps as they point out. I thought he did a good job of that. That's, basically, all
the issues that I have. The main one is the distance between the garages of 65 feet. I
think needs to be -- needs to be there. Thank you.
Moe: Thank you. Commissioner Newton-Huckabay, any other comments?
Newton-Huckabay: Well, I was doing okay until I read the ACRD -- I'm almost -- the
ACHD report. I cannot believe that they didn't put a requirement in there to finish the
remainder of that intersection on Ustick. That seems absolutely ridiculous to me. And I
-- I have just -- I mean I reamed through the report and they specifically say not to -- that
they will purchase the right of way, but they are not going to require it to -- I would have
hoped -- thought maybe the developer might have -- I don't know what the r
called, but try to get it moved into the five year work plan and move that up. That's just
a really awkward corner right there and you know, thanks to Mr. Krupa for bringing that
up, I didn't catch that earlier, and Ijust -- I have a real issue how that's going to -- I
mean is it going to be gravel, just -- is it going to be -- once they tear it down are we
going to have a temporary roadway?
Hood: Mr. Chair, Commissioner Newton-Huckabay, my understanding -- and I haven't
talked to ACHD, just from what the applicant told me here a few minutes ago -- is they
will purchase the right of way from the applicant, but they already have some funds set
aside to go ahead and patch that asphalt back in to make that lane -- finish out that
improvement. What they don't have the money for is for the full widening to seven b
seven intersection. It will still be, essentially, the same intersection, with this leg of t
being cleaned up, so --
Newton-Huckabay: Okay. So, they will put in a right turn lane onto Ustick from Locust
Grove and, then, take the road up to Mr. Widson's property?
Hood;: Yeah. Again, I'm not sure now that taper is going to work there, because you do
have an outparcel there that they don't have the right of way for --
Newton-Huckabay: Right.
Meridian Planning & Zoning
January 17, 2008
Page 34 of 39
Hood.: -- but, yeah, essentially where the barricades are I understand they are oin to
-- because they have already got the money set aside, they are just waitinggforghe
property to be given to them, so I don't know why they didn't require the applicant to do
that. Maybe it's because they already had this money earmarked and so --
Newton-Huckabay: Because I'm not getting it -- from reading their staff report I didn't
get that, that it was going to be improved to that extent even.
Hood: Mr. Fluke, am I correct in that -- okay.
Newton-Huckabay: Okay. All right. Well, that's -- okay. That's -- I would be oka wit
that, then, because that makes a usable corner. y h
Moe: All right.
Newton-Huckabay: I have another question. The residential -- or not the residential --
the commercial office there behind the church and just north of the church in Quenzer
Commons, does that have block wall running all along there as well already? I can't
remember. Bill, do you --
Parsons: Yeah. Chairman, Commissioner Newton-Huckabay, that is vinyl fencin
That's the Brockton Subdivision and I have done some site visits out there, so it is g-
they are vinyl fencing abutting that residential and along that -- the perimeter of that
commercial development -- office development.
Newton-.Huckabay: Uh-.huh. I don't see the need for a block wall. I think that that's
going to make it look rather more institutional than the larger buildings were. But it's not
a deal
killer forme and --
Moe: Any comments in regard to parking?
Newton-Huckabay: Yeah. I'm getting to that.
Moe: Oh. Didn't mean to rush you.. It just didn't look like you were getting there.
Newton-Huckabay: Well, I have never been a big. fan of the shared drivewa in an
development, so I -- I'll stand with the rest of the Commission on that. I'd like to see a
redesign. I don't mind the 75/25 split on that.
Moe:: Okay.
Newton-Huckabay: And I guess I'd also comment that if the block wall -- I mean no
having been a -- neighbors may not have requested it, because it was offered and I
Meridian Planning & Zoning
January 17, 2008
Page 35 of 39
would hate to remove it if they wanted it, but -- you know what I'm saying? So, I'm not
exactly sure how to address that, but --
Moe: Well., I guess you address it the fact that there was no public testimony from an
of the neighbors not wanting it, so, therefore, you know, they are spendin a y
money putting in a block wall than they are putting in a vinyl or any other type of fencirng
and so, you know, I commend them for that and so, therefore, I don't have a problem
with a block wall.
Newton-Huckabay: Okay. Then, just the letter from Mr. Widson, I just want to make
comment on that, that he was opposed, it appears, to the wall surrounding his property.
But he also wanted it to be single family as well. I have no further comment.
Moe: Let's see. Commissioner Marshall, I believe you're the -- do you have an other
comments? y
Marshall: Just clarify myself, I guess, a little. Again, the block wall, I'm not overt fond
of it, but I guess as has been said, it's not a deal breaker for me in any means. I m not
fond of the parking. I don't like the layout here. You know, I don't mind the sidewalk
going across the street the way they have that. I guess my one remaining issue is the
parking.
Moe: Well, all Commissioners have spoke on that. In those discussions I'll just kind of
summarize out what I heard, basically, is is that there is probably four Commissioners
that would like to see something done with the parking and one Commissioner has no
problem wifh the parking. So, having said that, I don't know who is planning to make
motions, but that's kind of where we at.
Rohm: Can I make one last comment?
Moe: Yes.
Rohm: I think that if it's the consensus of the Commission as a whole that the arkin
be addressed, I would like to, as opposed to forwarding this, I'd like to continue thi 9
because I want to see the layout with that parking being addressed, as opposed to 'ust
J
given a direction to it. If we are going to make that a requirement, I think it should come
back to this body, rather than forwarding it on --
Moe: I agree and we, basically, need to find out from the developer whether or not the
have an interest to do that before we worry about continuing anything. We have closed
the Public Hearing, but if we can just get a nod or something. The intent -- do you have
any -- if they'd be in favor of a continuance to review the site plan again? I am going to
need a motion to reopen the Public Hearing.
Meridian Planning & Zoning
January 17, 2008
Page 36 of 39
Newton-Huckabay: So moved.
Rohm: Mr. Chairman. Second.
Moe.: Okay.
Newton-Huckabay: I don't want to be accused of being indecisive and slow
Moe: Because I think I know what you wanted to do. It has been moved and seconded
to .reopen the public hearings on AZ 07-020, PP 07-027, and CUP 07-023. Mr. Fluke.
Fluke: Thank you, Mr. Chairman. Darin Fluke,
Commission's going, our preference would be to have6 imply a cond t otn p aced ontus
to that effect and to send it on. I would say two things In defense of that. One is you're
not going to see a large difference in the site plan. Basically it's going to eliminate units,
is what it's going to do. We are not going to totally redesign the site to accommodate
that condition. You know, if you look at this tier here, there is really nowhere else to go.
There is nothing else to do but eliminate units if we have to do that. And I haven't sat
down and played with the numbers yet to see -- you know, in the dimensions, but I can
tell you that we are going to try to lay it out without losing units and squeeze it where we
can, but fhere is really not many other options. And the second point on that would be I
would ask the Commission to consider looking at 60 feet, instead of 65. I mean a
typical drive aisle in a parking lot is 24 feet, so I'm not sure where the 25 came from, but
certainly 20 feet ought to be adequate, so we would have two parks at 20 and a drive
aisle at 20, which is the width of the driveway, 20 feet. And that would make it more
palatable for us and easier to -- to do the redesign.
Moe: Well, to answer your first -- your first point, in the past this Commission doesn't
like to go ahead and move things forward without seeing the changes done, so that we
can approve them prior to going to City Council. So, I will not speak for the
Commission, other than the fact that in -- like I said, in past we do not like sending
anything on until we have seen the changes. The second point I guess I would ask staff
what is their comment in regards to the -- the point of going to the 60 in lieu of the 65?
Parsons: Mr. Chairman, Members of the Commission,
the -- first of all, let me go back and answer where weh ame up w th the 25 foot drive
aisle. Typically, when we are looking at subdivisions or parking lot layout, we typically --
code requires a 25 foot drive aisle between adjacent -- you know, adjacent to two way
parking stalls and so that's why we felt that 24 was appropriate, but I had spoke with
Caleb on it and I think 20 could be sufficient there and we could go 60 feet, rather than
the 65 feet.
Newton-Huckabay: Mr. Chair, I think that's a fair compromise.
Meridian Planning & Zoning
January 17, 2008
Page 37 of 39
Moe: I happen to agree one hundred percent.
Fluke: And, Mr. Chairman, if I might, just to address o
you don't send things on with conditions, because ofte ur comment, I a
large impact. But, again, I would just reiterate in this c PPreciate why
different layout. The lots are going to be ~ ntlmes they -- they will have a
ase you're not going to see a
going to be tiered just the wa tlered -- they are not lots, but the units are
in there, you know, the dime sions to squ ze them ou
We are either going to find the land
all we do is lop off two units and end u
Alex, so that -- P with a duplex on the end, rafhe d h we don't,
an a four-
Moe: Any other questions? Okay.
Fluke: Thank you.
Moe: Thank you very much. Could I get a motion to clos
e the Public Hearing?
Rohm: Mr. Chairman, I move that we close all three of t
PP 07-027, and CUP 07-.023. he public hearings, AZ 07-020,
.Moe: Before there is -- well., before you have the motio
Fluke, can I ask you one more question just real uick n' I
want to get a time frame, number one. guess the applicant -- Mr.
want us to move this one, what kind of q °n the -- I'm just curious. I just
Understanding what you're speaking about, you
make these chan es? a time frame are you looking at to be able to
g I mean --
Fluke: We will make the changes next week and have t
the week, so that we can be on your next hearing, if that --
hem to the staff by the end of
Moe: That's what I wanted to make sure I understood.. Th
Rohm: Again, I move that we close the pub • ank you.
CUP 07-023. Ilc Hearing on AZ 07-020, PP 07-027, and
Marshall: Second.
Moe: It's been moved and seconded to close the Public
027, and CUP 02-023. All in favor sa Hearing on AZ 07-020, PP 07-
yaye. Opposed same sign? That motion carries.
MOTLON CARRFED: ALL AYES..
Moe: Basically, what I have heard, if we can go down t
little bit more room in the o the 60 wide and we can get a
that. However, again, I just bring~u think that's a great compromise and I could live w'
g p that I don't like moving things forward until they are
Meridian Planning & Zoning
January 17, 2008
Page 38 of 39
done before they go to City Council and., basically, it's makin
so -- g sure that they are done,
Rohm: With that being said, Mr. Chairman?
Moe: Yes, sir.
Rohm: I move that we continue the public hearings on AZ 07-
07-023, to the regularly scheduled meeting of February 7th, 2 020, PP 07-027' and CUP
8.
O'Brien: Second.
Newton-Huckabay: Second.
Nary: Mr. Chairman.
Moe: It's been moved and seconded to continue AZ 07 --
Nary: I'll wait until you're done. I'm sorry. I didn't mean to inter
Moe: To continue AZ 07-020, PP 07_p27 and C rupt You.
meeting of February the 7th. All those in favor say aye.2 Op ose regularly scheduled
motion carries to continue p d same si n?
g That
Nary: Mr. Chairman?
Moe: Mr. Nary.
Nary: Mr. Chairman, I just wanted to make it clear, both for the
and the Commission that your continuance -- m as
those specific items you have moved for redesi public and the applicant
Y sumption was was only to discuss
be taking other testimony on the remainder of the o ro ect t meetin
understand that correctly? g• So, You won't
p J ,just on those. Did I
Moe: Thank you very much.
Rohm: Mr. Chairman, I move we adjourn.
Moe: I need a second now.
Marshall: I'll second..
There would be one more motion.
Moe: Thank you. It's been moved and seconded to adjourn.
Opposed? All those in favor?