HomeMy WebLinkAboutChange Order No. 1 with Civil Survey Consultants, Inc. for Black Cat Rd Water Main Extension Phase 2ktECEIF,7EEI1 MAR 0 4 2008 City Of Meridian City Clerk Office Memo To: Jaycee Holman; Tara Green From: Brent A. Blake, Engineering Technician 1 blakeb@meridiancity.org Meridian Public Works Department 660 E. Watertower, Suite 200 Phone: 898-5500 Fax: 898-9551 CC: Thomas Barry, Public Works Director Len Grady, P.E., City Engineer Clint Dolsby, P.E., Staff Engineer Date: 3/3/2008 Re: Proposed Agenda Item for 3/18/2008 City Council Meeting The Public Works Department respectfully requests the following item be placed on the 3/18/2008 City Council agenda, under Consent Agenda, for Council's consideration: Change Order No. 1 for Black Cat Road Water Main Extension Phase 2 (Design). Additional work is required for the completion of the Black Cat Road Water Main Extension Phase 2 Desi n This change order consists of the following work and amounts to 20% of the original design contract: • Additional Surveying, Design, and Consultation services due to additional water main added to the project. Recommended Council Action: The Public Works Department recommends that City Council approves Change Order No. 1 for the Black Cat Water Main Extension Phase 2 (Design) project with Civil Survey Consultants, Inc. for $3,000 and authorize the Mayor to sign it. Thank you for your consideration. Please contact me if you have any questions regarding this item. • Page 1 CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER Change Order No 1 Project Number: 725 Date: 3/3/2008 Effective Date: 313/2008 CONTRACTOR: Civil Survey Consultants PROJECT: Black Cat Road Water Main Extension Phase 2 The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Desciption: 1) Additional Surveying, Design and Consultation Services in association with added water mains to project. 2) 3) 4) 5) Reason for Change Order: There are additional water service stubs added to this project. Attachments: CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: $15,155.00 Original Contract Completion Date: Original Contract Completion Days: Net changes from previous C.O.'s.: Net Days change form previous C.O.'s: No. 0 to 0 No. 0 to 0 $0.00 ConVact Price Prior to this C.O.: Contract Completion Date before this C.O.: $15,155.00. Contract Completion Days before this C.0 0 Net Increase (decrease) of this C.O.: Net Days Increase (decrease) of this C.O.: $3,000.00 Contract Price with all Approved C.O.'s: Contract Completion Date with all Approved C.O 's: $18,155.00 Contract Completion Days with all Approve 0 GER) RECOMMENDED: (CONSTRUCTION MAN Accepted (Contractor) A /~ Date: 3 _ _ zo pg Date: ~ ~ y , na APPROVED: (CITY PURCHASING AGENT) COUNCIL APPROVAL By: i<eith Watts Date: Date: APPROVED: (CITY) - ATTEST: By: Mayor Tammy de Weerd By: City Clerk, Jaycee Holman. Date: Date: Glenn K. Bennett, P.L.S. President Timothy A. Burgess, P.E. Vice President Kyle Radek Staff Engineer City of Meridian 660 E. Watertower Meridian, ID 83642 Civil survey Consultants, Inc. 1400 E. Watertower Street Suite }-00 Meridian, Idaho 83642 Re: Black Cat Water Main Phase 2 -Additional Design Services Task Order No. 0725 Dear Kyle: (208)888-4312 Fax 888.0323 February 19, 2008 During the design and construction of this project we were asked to revise our construction plans to add water main stubs that were requested by land developers. Additional surveying, design services, and meetings with city staff and developer's engineer were required to complete these revisions. With the project billing sent to you February 4, 2008 we have now billed a total of $15,024.36. Our current contract has a total design budget of $15,155.00. I am now requesting a supplemental agreement in the amount of $3,000 to cover the additional design services on this project. Sincerely, CIVIL SURVEY CONSULTANTS, INC. ~ ,~ ~ , .;. ~~ ,~~~ ~n /^ L .il G' Corey Peacock, P.E.