HomeMy WebLinkAboutResponse to Staff ReportNGINEERING
planning and engineering communities for the future
OLUT/ONS«P
January 16, 2008
~~~~~~~~
1AN 1(~' p008
Meridian Planning & Zoning Commission GIT~ OF MERIDIAN
City of Meridian CITY CLERK OFFICE
33 East Idaho Avenue
Meridian, ID 83642
Re: Education Campus Subdivision No. 2 -Rezone and Preliminary Plat
Files Nos. RZ-07-021 and PP-07-025
Dear Commissioners:
We have reviewed the staff comments for the public hearing date of January 17, 2008, and have
the following responses:
1. PLANNING DEPARTMENT
1.1 REZONE COMMENTS
1.1.1 Noted.
1.1.2. Noted.
1.2 PRELIMINARY PLAT -SITE SPECIFIC REQUIREMENTS
1.2.1 a. The applicant will comply. As 48 feet ofright-of--way was dedicated from
the centerline of N. Locust Grove Road with the recording of the Education Campus Subdivision
plat, it is believed the current sidewalk already exists within the right-of--way. This will be
verified.
b. Any needed cross-access easements will be provided.
c. The applicant will comply.
d. The applicant will comply.
1029 N. Rosario Street, Suite 100
Meridian, ID 83642
Phone: (208) 938-0980
Fax: (208) 938-0941
E-mail: es-beckym@gwest.net
C:\Documents and Settings\hillm\Local Settings\Temporary Internet Files\OLKI\RecsResponse.doc
Meridian Planning & Zoning Commission
January 16, 2008
Page 2
1.2.2 The applicant will complete the 10-foot-wide street buffer adjacent to E. Leigh
Field Drive, south of the Fire Department teaching facility. The 20-foot-wide landscape buffer
along the east property boundary has already been constructed and is planted with trees
and sod, along with a pathway. The buffer will be shown on the fmal plat; however, no
additional landscaping is proposed in this area at this time. A revised landscape plan will
be provided.
1.2.3 The applicant will submit a private street application for staff level review and
follow construction standards for conversion of an existing facility.
1.2.4 The applicant will submit an application for amendment of the Development
Agreement to allow uses other than school/educational type uses.
1.2.5 The applicant will comply.
1.2.6 The applicant will comply.
1.2.7 The applicant will comply.
1.2.8 The applicant will comply.
1.2.9 The applicant will comply.
2. PUBLIC WORKS DEPARTMENT
2.1 The applicant will comply.
2.2 The applicant will comply.
2.3 This condition is contradictory to condition 2.4 below. Easements will be
provided in Geu of common lots. Please delete this condition in its entirety.
2.4 The applicant will comply; however, we believe "DO NOT RECORD" should
be deleted, as the easement document will need to be recorded if it is to be referenced on
the plat.
2.5 The applicant will comply.
2.6 Existing structures are new and will not be removed from the property. We
respectfully request that this condition be stricken in its entirety.
2.7 The applicant will comply.
2.8 The applicant will comply.
C:\Documents and Settings\hillm\Local Settings\Temporary Internet Files\OLK1UtecsResponse:doc
Meridian Planning & Zoning Commission
January 16, 2008
Page 3
2.9 The applicant will comply.
2.10 The applicant will comply.
2.11 The applicant will comply.
2.12 The applicant will comply.
2.13 The applicant will comply.
2.14 The applicant will comply.
2.15 Mailbox locations will be determined during the building permit process.
2.16 The applicant will comply.
2.17 The applicant will comply.
2.18 The applicant will comply. (The last sentence of this condition does not
apply.)
2.19 The applicant will comply.
2.20 The. applicant will comply.
2.21 The applicant will comply.
3. FIRE DEPARTMENT
3.1 Noted.
3.2 The applicant will comply.
3.3 The applicant will comply.
3.4 The applicant will comply.
3.5 The applicant will comply.
3.6 The applicant will comply.
3.7 The applicant will comply.
4. POLICE DEPARTMENT
C:\Documents and Settings\hillm\Local Settings\Temporary Internet Files\OLK1UtecsResponse.doc
Meridian Planning & Zoning Commission
January 16, 2008
Page 4
4.1 It is noted that the Police Department did not submit comments.
5. PARKS DEPARTMENT
5.1 The applicant will comply.
6. SANITARY SERVICE COMPANY
6.1 It is noted that Sanitary Service Company did not submit comments.
7. ADA COUINTY HIGHWAY DISTRICT
7.1 Noted.
We appreciate staff's review of our proposed project. Please feel free to call if you have
additional comments or questions.
Sincerely,
Engineering Solutions, LLP
Becky McKay
Partner
BM:ss
cc: Joint School District No. 2
C:\Documents and Settings\hillm\Local Settings\Temporary Internet Files\OLKI\ItecsResponse.doc