HomeMy WebLinkAboutACHD Comments,;
~ .,
December 19, 2007
~~~~`~~
CHD ~
~iosw.wG~`ea~~o Srirv+:c~
To: Joint School District No. 2
1303 E. Central Dr.
Meridian, ID 83642
Representative: Eng. Solutions -Becky McKay
1029 N. Rosario St, Ste. 100
Meridian, I'D 83642
Subject: Education Campus 2 /MPP-07-025 /MRZ-07-021
John S. Franden, President
Rebecca W. Arnold, Vice President
Sherry R. Huber, Commissioner
David Bivens, Commissioner
Carol A. Mckee, Commissioner
~~~~A~~~
DEC 2 6 200
City of ti9eridian
City CB~rk ®ffis~
This is a staff level approval of a preliminary plat for Education Campus 2 Subdivision. In 2002 this site
was platted within Education Campus Subdivision. Ada County Highway District has no site specific
requirements at this time due to the fact that all street improvements exist.
The applicant will be required to pay all applicable platting and review fees prior to final approval.
If you have any questions, please feel free to contact me at 208-387-6177.
Sincerely,
c~~~
Chelsee Kucera
Planning Intern
Right-of-way & Development Services
CC: Project file,
City of Meridian
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us
A
• vvv l YJVJ/ IU YJJ 1' 11U.J
1
~~~Y~
R..1
Rur
W
~C~
N
our
I,,,_
V
o
E
T
a
z
LEIGH MELD DR.
E.
C~.N ~ .
a
'
R.
0 o s~T~
R•0 g
RUT
C
U ~
R
~ ~' -e
Rur
USTICK ROAD
E 4
.
9C~ '~~-500 EItI"G
ows,ow7E lorosro~ MERIDIAN SCHOOL SITE "GIIVE
vaw.NO. emoo~ LOCATED IN SECTION 32, T.4N.~ R.1 E., B.M.
8NEE7 ~ of 1 MERIDIAN, ADA COUNTY, IDAHO OWTIONS uP
V I C I N VICINITY MAP 1070 N. RO8MI05T., ST@. 100
MERIDIAN, ICA110 87601
Pfbfq f=09)~10/B80 ie~l~)96007~1
1eclwolAPR 9KB
~$Ubmlt a development application to a City or to the County
®The City or the County will transmit the development application to ACHD
®The ACHD Planning Review Division will receive the development application to review
The Planning Review Division will do one of the following:
^Send a "No Review" letter to the applicant stating that there are no site specific requirements at this
time.
^Send a "Comply With" letter to the applicant stating that if the development is within a platted
subdivision or part of a previous development application and that the site specific requirements from the
previous development also apply to this development application.
Write a Staff Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
^Write a Commission Level report analyzing the impacts of the development on the transportation
system and
evaluating the proposal for its conformance to District Policy.
The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports.
^For ALL development applications, including those receiving a "No Review" or "Comply With" letter:
• The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the
Development Review Division for plan review and assessment of impact fees. (Note: if there are no
site improvements required by ACRD, then architectural plans may be submitted for purposes of impact
fee calculation.)
• The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-
way, including, but not limited to, driveway approaches, street improvements and utility cuts.
^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Zone)
^ Driveway or Property Approach(s)
• Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for
approval by Development Services & Traffic Services). There is a one week turnaround for this approval.
Working in the ACHD Right-of-Way
• Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit
Application" to ACHD Construction -Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50'
or you are placing >600 sf of concrete or asphalt.
Construction (Subdivisior-s)
^ Sediment 8~ Erosion Submittal
• At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a
Certified Plan Designer, must be turned into ACHD Construction -Subdivision to be reviewed and approved by
the ACHD Drainage Division.
^ Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con
being scheduled.
^ Final Approval from Development Services
ACHD Construction -Subdivision must have received approval from Development Services prior to scheduling aPre-
Con.
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us