4 August 2003
Mayor Robert D. Corrie
City of_Meridian
33 East Idaho
Meridian; Idaho 83642
Re: Meridian Municipal Center
Program Update
ZGA Job No. 0317
Dear Mayor Corrie,
- ..~„~.
~' ~~ ..
It was a pleasure to talk with you last week. The City has made a
great deal of progress in its planning efforts over the past few
years; you and the Council are to be commended for your diligence
and commitment.
The potential establishment of downtown development standards
and forward thinking planning policies continues to make Meridian
a leader in community development in the Treasure Valley.
As the demand for public service increases, now more than ever, it
is important that City Government has an understanding of the
current and future staff and facilities needs.
Proposed Scope of Work
As you requested, we are submitting the following proposal for up
dating the previously completed space needs analysis study dated
25 August 1998. We propose that the format and organization of
information exhibited in the initial study be followed in generating
an up-dated document. However, you and the Council may not
require that all information be reviewed and, therefor, may wish us
to proceed with some or all of the following activities.
I. Update Project History: ZGA will update project history
to include the various studies and activities that have
occurred during the recent past and which have provided
greater understanding of the potential for a municipal
center.
Established 1973
Mayor Robert Corrie
4 August 2003
Page 2
II. Update Findings/Existing Facilities: In the initial study,
the existing City Hall was assessed as to its general
physical condition and potential for expansion or alteration.
Should the City wish to include assessments of other
facilities currently occupied by various City departments,
ZGA would provide general opinions, based upon
observation, related to the suitability of structures and
building systems.
III. Review Current Needs: ZGA will review, with each
deparhnent director, the current and anticipated staff and
facilities needs. The results of these meetings would be
recorded and included in the final report. Previously
established departmental/facilities adjacency requirements
will be reviewed and revised as necessary, yielding a
current and projected relationship determination.
IV. Revise Survey Data: This effort would constitute the
review and revision of survey data sheets for each
individual program space. The magnitude of changes,
deletions, and/or additions to this section will be largely
dependent upon the results obtained under item III above.
ZGA would revise the previously generated survey data
information as necessary to support the current program
needs.
V. Appendix: The appendix would be updated to include
reduced reproductions of schematic and conceptual
drawings provided to the City in the course of exploring the
potential for the project. ZGA would organize and
incorporate this information into the report.
Compensation
Item I: $340.00 fixed fee.
Item II: $2,500.00 time and materials, not-to-exceed.
Item III: $3,400.00 time and materials, not-to-exceed.
Item IV: $4,300.00 time and materials, not-to-exceed.
Item V: Included in items I - IV above.
Our services are invoiced on a monthly basis with payment in full
required upon receipt. Any unpaid balance thirty (30) calendar
days following the invoice date shall bear interest from the date
payment is due at a rate of 1-1/2% per month (18% per annum).
• Late payments apply to interest first then principal.
Mayor Robert Corrie
4 August 2003
Page 3
Our hourly billing rates are listed on the attached Exhibit `A'. '
The purpose of this letter is to define our agreement with the City
of Meridian for services described above for the referenced project.
It this meets with your approval, please sign where indicated and
return one executed copy to ZGA. Keep the original for your file
and please contact me with any questions.
We look forward to continuing our work with the City of Meridian
Sincerely,
ZGA Architects and Planners, Chartered
City of Meridian
f~prvv~ec~ 6~ C'~~j Cvwtic.~.~ 8-26-03
\`I~IIIIii N lilll//~~~'''
,~ !~2 .
ayor Robe Come = $EAL
'~, 'yp ~Sr Est • ~,,.
,9 Q. ~~
MGS:ss ~~~
cc: Job File/Div.A
art,
Accepted/Approved
~1.'
EXF~BIT `A'
The following represents ZGA's compensation rates for services provided
on a time and expense basis for 2003:
Principal
Senior Project Manager
Project Architect
Intern Architect (CADD)
Administrative/Clerical
Consultants
$95-140 per hour
$85-90 per hour
$70 per hour
$50-65 per hour
$50-60 per hour
115% of invoice to ZGA
Cost
Reproduction Drawings (paper) $1.25/sheet
Reproduction 8% x 11 copies $0.15/sheet
Vehicle Mileage $0.375/mile
Miscellaneous Costs (not in-house) 115% of invoice to ZGA
Reimbursable Expenses