RE: Chalet Marseilles Subdivision -Conditions of Approval
Members of the Commission:
We are in receipt of the staff report for the January 17, 2008 hearing from Bill Parsons to the
Planning and Zoning Commission regarding the above-noted project. Thus far, we have
worked with staff and agencies to make this project even better from where we started and
we feet that all issues and concerns have been thoroughly addressed. We are comfortable
with the staff analysis of the project and the proposed conditions of approval. ;owever,
there are a few conditions that we would like to address:
Condition 1.4.1 It 1.4.16 requiring 65-feet between garages for 75% of the u
maximum of 35-feet between garages for buildings that do not have 65-feet
garages
We feel that reducing the space between garages would not be desirable or ber
residents and there is not enough room to add an additional 15 feet between th
have provided 50 feet between the faces of the garages, which provides adequ~
park a vehicle in front of each garage on both sides, and it leaves approximate)
back up space. Instead of providing an additional 15 feet between the garages
length between garages to a maximum of 35 feet as recommended by staff, we
to provide additional driveway space at the terminus of each driveway to provic
back-up space. This option would be a minimal impact to the site layout, it wo
purpose of the condition and it would make for a more functional design. Pleas
example. We respectfully request that the Commission modify this condition a~
Condition 1.4.3 requiring no more than two buildings in a row (side by side)
same elevation.
We believe the intent of this recommendation is to avoid having the same elev
throughout the entire project with no noticeable variation, like some of the ex
developments around the valley. We are requesting to provide clusters of buil~
different elevation styles rather than every two buildings Because the change i
style will be more noticeable and attractive in a clustered configuration. Part
F:\ProjectManagers\JEC\t0-07-057 RC Meridian\staff rpt response ltr.doc
J-U-B ENGINEERS, Inc.
ENGINEERS • SURVEYORS • PLANNERS
Regional Office
250 South Beechwood Avenue, Suite 201
Boise, ID 83709-0944
and a
~ficial to the
garages. We
:e space to
10-'12 feet for
~r reducing the
'tre proposing
additional
ld address the
r see attached
stated.
have the
nng
ngs to be
elevation
the
•~
~. ~.
/~
~~-u-s~
Staff Report Response
Engineers Surveyors Planners Chalet Marseilles Subdivision
January 15, 2008
Page 2
ambiance of this condo project is the continuity of the unique styling.
Condition 1.2.4. The following revisions will be made to the Landscape/site plan prior to
City Council to include the following items as recommended by staff:
• Trees and groundcover for the internal pathway system for recreational use.
• 5-foot perimeter landscape buffer along the shared driveway south of N. Chardin
Avenue improved with trees and groundcover.
• Fencing: A decorative concrete wall will be constructed along the perimeter of the
northwest parcel and along the northern perimeter of the southeast parcel (along E.
Monet St
• Centralized mailbox locations w/directory and site reap located at the entrance.
• 3-foot wide landscaped areas along all foundations with street-facing elevations.
Condition 7.1.6 requiring a public turnaround at the south terminus of Chardin Ave.
We wilt provide a public turnaround easement as required.
Summary
We respectfully request that the Planning and Zoning Commission make a recommendation to
the council contingent upon the addressed changes.
We believe that we have designed a high quality project that will be an asset to the city and
complies with both the spirit and intent of the Meridian Comprehensive Plan and Zoning
Ordinance.
We will gladly revise the landscape plan and preliminary plat to reflect staff's conditions prior
to City Council.
Sincerely,
J-U-B ENGINEERS, INC.
Lisa Bachman
Land Planner
F:\ProjectManagers\JEC\10.07-057 RC Meridian\staff rpt response ltr.doc
~•