Loading...
HomeMy WebLinkAbout2000ADA COUNTY DEVELOPMENT SERVICES _ PHONE: (208) 364-2277 650 MAIN STREET, BOISE, IDAHO 83702 9 FAX: (208) 3642406 BUILDING ENGINEERING PLANNING ZONING January 3, 2000 Becky Bowcutt Briggs Engineering Inc 1800 W Overland Road Boise ID 83705-3142 RE: Subdivision Name Reservation - RESOLUTION SUBDIVISION Dear Becky: At your request I will reserve the name "RESOLUTION SUBDIVISION" for you to use for your project. I can honor this reservation only as long as your project is in the approval process. Final approval can only take place when the final plat is recorded. Sincerely, i John E. Priester, P.E.L.S. County Engineer JP/jp 0 M SUBDIVISION EVALUATION SHEET Proposed Development Name Resolution Subdivision File #, Date Reviewed 1/11/00 Preliminary Stage XX Final Engineer/Developer Brigas Engineering, Becky Bowcut The Street name comments listed below are made by the members of the ADA COUNTY STREET NAME COMMITTEE (under direction of the Ada County Engineer) regarding this development in accordance with the Boise City Street Name Ordinance. The following streets are existing and the names shall appear on the plat: "OVERLAND RD." and "S. LOCUST GROVE RD." The following street names are approved for this development and shall be placed on the reserved list: "S. MILLENNIUM WAY" "S. CELEBRATION AVE." "E. GALA ST." "E. Y2K LANE" and " S. RESOLUTION LANE" The above street name comments have been read and approved by the following agency representatives of the ADA COUNTY STREET NAME COMMITTEE. ALL of the signatures must be secured by the representative or his designee in order for the street names to be officially approved. ADA COUNT i STREET NAME COMMITTEEAGENGY REPRESENTATIVES OR DESiGWEES Ada County Engineer John Priestef Community Planning Assoc. Sue Hansen City of Meridian Cheryl Sable Meridian Fire District Representati, Date /-/3— e761 Date / -/3- od Date 1-13-o6 DateI—fq-00 NOTE: A copy of this evaluation sheet must be presented to the Ada County Engineer at the time of signing the "final plat", otherwise the plat will not be signed 1111 Subindex Street Index Section NUMBERING OF LOTS AND BLOCKS DIS,L� 1/310 -- TR%SUBS%SM CITY.FRM 0 0 AFFIDAVIT OF ACCURACY STATE OF IDAHO ) COUNTY OF ADA ) I, Beck Bowcutt Briggs Engineering Inc 1800 W Overland Road (name) (address) Boise Idaho , being first duly sworn upon (city) (state) oath, depose and say: That I prepared the attached applications and the information contained is true and correct. (Preliminary Plat, Annexation, Re -zone, Conditional Use and Planned Unit Development) Dated this day of ��� ��" 2000 ki 67ZOO' (Signature) SUBSCRIBED AND SWORN to before me the day and year first above written. �... A WI - •.. °TART. % pUBL1G 0 10 1 \affid-accuracy of ry Public for Idaho Residing at My Commission Expires: -7-,Z-5 0 AFFIDAVIT OF POSTING STATE OF IDAHO ) ss COUNTY OF ADA ) L] I, Donna Wilson Briaas Engineering, Inc. 1800 W. Overland Rd. (name) (address) Boise ID being first duly sworn upon (city) (state) oath, depose and say: I will personally post the subject property with the hearing notice sign one week prior to the public hearing for the (annexation, rezone, conditional use, and preliminary plat of Resolution Subdivision). Dated this I day of 0kU_!A=&�t- SUBSCRIBED AND SWORN to before me the day and year first above written. Volt M 00 'el A it r � G PUS 0 re o4°e 0 10 1\affid-posting J'Al) 'LNM)_' - Notary Pu Ic for Idaho t� Residing at -It l l �l My Commission Expires: -1-21) • iE_ A. -)#,TED EARTH SCIENCES INC BIOLOGY • GEOLOGY • ENGINEERING • SOIL SURVEYS • SOIL AND WATER QUALITY • RESOURCE PLANNING AND SITE INVESTIGATIONS 4696 Overland Rd.. Suite 516 Boise. Idaho 93705 208) 336-8661 December 17, 1999 Attn: Vern Wartman G. L. Voigt Development Co. 1900 E. Jennie Lee Idaho Falls, ID 83403 Dear Vern: A soil investigation was made on the Millennium Subdivision located in the NWNW of Section 29, T.3N., R.IE., B.M., Ada County, Idaho. The purpose of the investigation was to determine soil physical properties and soil internal drainage conditions in areas where storm drainage facilities may be installed. Three backhoe test pits were excavated and described in the areas of potential storm drains. Soil texture, soil colors (as indicators of internal soil drainage), permeability of identified layers, restrictive soil layers (cemented hardpan, clay content, compacted layers), plant rooting depth, and presence or absence of free water (water table) were all considered in this study. Detailed field notes and a map showing approximate location of test holes are attached. Monitorinv wells (perforated 4" PVC pipes) were installed in each test hole to monitor the seasonal groundwater depths during the 2000 irrigation season. The groundwater depths, if any occurs, should be measured and recorded every 10 days from about April 1, 2000 – August 31, 2000. If no ground water appears in the wells by July 1, 2000, monitoring could be discontinued. All three test holes were dry at the time of excavation and there were no mottles or gleyed colors (oxidation and/or reduction colors caused by fluctuating groundwater). I don't anticipate high groundwater in the test hole areas, but monitoring the wells will confirm it. See the attached field notes for detail on soil physical properties. If you have any questions about this report, please call me at (208) 672-9213. Sincerely, ,S� / Y , i !4—. Glen H. Logan Certified Professional Soil Scientist cc: Attn: Becky Bowcutt cc: Vern Wartman Briggs Engineering, Inc. 2450 S. Five Mile 1800 W. Overland Road Boise, ID 83709 Boise, ID 83705 1 a II L r ="i'= — — — 13 Wool °Ib ils� ---------------------- -------------------------------------------- _ I I I g RESOU=N I Islip III , ■■ IL R i < i F r , � � r •• • � • 1 � / �` _. --------------- _ a Ww aur II L 13 Wool °Ib ils� I I I g RESOU=N I Islip III , INTERSTATE 84 I -L MERIDIAN CITY JMITS BOUNDARY C -G R1 500 0 500 g s� 8 1 1 BLOCK 4 BLOCK 3 GALA STREET ?-)BLOCK2 8 3 2 5 4 SITE 1 BLOCK N C -G 1000 Feet Ilion■ ; ;■■■■■� loonsBRIGGS ENGINEERING, INC. RESOLUTION SUBDIVISION REVISION � ��■■■■■� ��■� 1� �■���►_�i�1. tri BRIGGS _ PORTION MERIDIAN,,. COUNTY, IDAHO MC SHEET I OF 1 (208) 344-9700 1800 W. OVERLAND ROAD DATE DWG. NO. BOISE, IDAHO 83705 02101/00 0101 ®® DESCRIPTION FOR RESOLUTION SUBDIVISION January 6, 2000 A parcel of land lying in the NW 1/4 of Section 20, Township 3 North, Range 1 East, Boise Meridian, Ada County, Idaho, more particularly described as follows: Commencing at the northwest comer of Section 20, T. 3N., R. 1 E., B. M., thence S 0034'14" W 25.00 feet along the west line of the NW % of said Section 20 to a point; Thence S 89°52'19" E 25.00 feet to the intersection of the south right-of-way line of Overland Road and the east right-of-way line of Locust Grove Road, the REAL POINT OF BEGINNING of this description; Thence S 89°52'19" E 2,631.43 feet along the south right-of-way line of Overland Road to a point on the east line of said NW %; Thence S 0°24'16" W 2,309.44 feet along the east line of said NW 1/4 to a point; Thence S 89°55'58" W 562.00 feet to a point; Thence S 0°24'16" W 311.00 feet to a point on the south line of said NW 1/4; Thence S 89055'58" W 384.95 feet along the south line of said NW '/4 to a point on the centerline of the Hunter Lateral; Along said centerline the following: Thence N 38029'36" W 241.86 feet to a point; Thence N 06006'40" W 42.59 feet to a point; Thence N 11 °33'07" W 554.27 feet to a point; Thence along a curve to the left 33.20 feet, said curve having a radius of 72.06 feet, a central angle of 26°24'06", a tangent of 16.90 feet and a chord of 32.91 feet which bears N 40°58'34" W to a point; Thence N 54010'37" W 543.31 feet to a point; Thence N 15036'19" W 215.00 feet to a point; Thence N 16°10'37" W 98.91 feet to a point; 0101\Subd legal.des 0 Thence N 08°33'19" W 217.21 feet to a point; Thence N 05°27'17" W 47.92 feet to a point; Leaving said centerline: Thence S 89°59'19" W 824.95 to a point on the east right-of-way line of Locust Grove Road; Thence N 0°34'14" E 945.47 feet along said east right-of-way line to the REAL POINT OF BEGINNING of this description; Said parcel of land contains 107.06 acres more or less. Michael E. Marks, PLS - No. 4998 0101\Subd legal.des J i z -00180® J m 1 L LL �i O o a S A M gOO N W 3AV an 46 O W Z . O h1 Z O lb O O MO EH Q o C A N ' "} A �o. $ w° WE n w ►� 0O w � 1-4 `J A It Z i, 1-4 H 14 w H O z � o � w O o a a/ w y (r 5vra�H""�P O a a � o adoa 3noao lsnoo-i U Z .Wxlo*PL z O w U) 8c -- w.0 z (� g g ---- ----- w m 9 3 Olt q C7 w � w 0 m _ Ott 3Aatl9 Lsnool MAR -22-2000 12:22 B T GS ENGINEERING, INC. 12083452950 P.02 Voice (208) 344-9700 Fax (208) 345-2950 E-mail briggs@micron.net March 22, 2000 Mr. Brad Hawkins -Clark Mr. Bruce Freckleton City of Meridian 200 E. Carlton, Suite 201 Meridian, Idaho 83642 Re: Resolution Plaza (Annexation, Rezone, Preliminary Plat, PUD & Conditional Use Applications) Dear Brad and Bruce: This letter is in response to staff comments dated March 20, 2000 General Comments: 1. We are in agreement. 2. The phasing information is correct. 3. The School District information is correct. 4. We would like more detailed information on transportation management plans. General Requirements: 1. Internal irrigation and drainage ditches will be piped. The Hunter Lateral adjoining the west boundary of the Voigt property will be piped. The section of the adjoining Hunter Lateral which abuts the Meridian School District property will be the responsibility of the District if piping is required for Lot 1, Block 1. 2. A septic system and two wells presently exist on the property. The septic system and residential well will be removed per City Ordinance. The second well was used .for agricultural purposes. We are exploring the possible use of the well as a secondary pressure irrigation source. 3. The applicant will comply. 4. The applicant will comply. 5. The applicant will provide a drainage plan. A drainage ditch traverses the subject property. The ditch receives run-off from the property. We may explore approval to discharge the pre - development flow. 6. The applicant will comply. 7. The applicant will comply. 8. The applicant will comply. 9. The applicant will comply. 0101\CityMer Hawkins -Clark Response.ltr MAR -22-2000--12 23 B GS ENGINEERING, INC. 12083452950 P.03 Annexation and Zoning Requirements: (Dile AZ -00-004) 1. Acceptable. 2. Stas recommendation for Neighborhood Commercial (CN) zoning is acceptable since the anticipated uses would be allowed within the CN designation. 3. We are in agreement. 4. The applicant will comply and enter into a development agreement. Rezone Requirements :(File R2-00-003) 1. We are in agreement. 2. We are in agreement. 3. We are in agreement. 4. The applicant will comply and enter into a development agreement. Preliminary Plat General Comments: (File PP -00-006) 1. The subdivision name Resolution Subdivision has been approved by the Ada County Engineer. The Street Name: Committee has reviewed the proposed street name and Ilas issued an evaluation and approval. 2. The applicant will comply. 3. The applicant will comply. Preliminary Plat Requirements: (File PP -00-006) 1. The applicant will comply. 2. The applicant will comply. 3. The applicant will comply. 4. The applicant will provide pressure irrigation to all lots with the exception of Lot 1, Block 1 (Meridian School District lot). We have contacted the School District concerning participation in a joint pump station. However, if the District believes financial participation is premature, since their irrigation needs are unknown at this time. We will proceed with an independent station. 5. The applicant intends to design and construct the pressure irrigation facilities to Nanlpa Meridian Irrigation District Standards. The system will be owned and maintained by Nampa Meridian Irrigation District with approval by the District Board. An agricultural well exists on the G. L. Voigt parcel. The well was historically used for a dairy. We intend to utilize the well as a secondary source if approval from Idaho Department of Water Resources can be obtained. 6. The applicant will delineate the NMID easement for the T Tunter Lateral on the plat. No other irrigation easements exist on the subject properties. 7. 'rhe applicant will comply. 8. The applicant intends to provide landscape easements along Locust Grove and Overland Roads. An association will be formed to govern perimeter landscaping. 9. The applicant will comply. 0 10 1 \CityMex Hawkins -Clark Response.ltr MAR-22-2000 12:23 GS ENGINEERING, INC. 12083452950 P.04 10. The developer of the apartment complex believes a fence along their western boundary is necessary as a buffer and for security purposes. Interconnection can be accomplished with pedestrian pathways and (1) vehicular connection as requested in Condition No. 11. The applicant will pipe the Hunter Lateral as requested by staff. 11. A vehicular connection between Site A & B could be accomplished from the driveway between building 7 & 8. If the daycare building size were reduced and the driveway angles north to intersect just above the traffic circle. 12. The applicant will comply. 13. The private road functions as a joint private access between Lot 8 & 6, Block 1 and Millennium Way. This access could be accomplished with an easement or cross access agreement for a driveway. The applicant did not intend the driveway to be constructed with curbs, gutter and sidewalk. CUP (PUD/Commercial) Requirements: (File CLIP -00-017) 1. The applicant understands. 2. The applicant understands the approval is conceptual and future uses will require site specific conditional use approval. The staff and commission must understand- the term conceptual. final development plans will most likely reflect minor deviations from the concept - 3. The applicant is in agreement. 4. The applicant will comply with the requirements of the Meridian Zoning Ordinance as follows: Sections 12-6-4, 12-6-6, 12-6-7 & 12-6-8-B. The applicant disagrees with the requirements of Section 12-6-8-A (l, 2 & 3). (1) The multi -family project applicant indicates the parking of any type of recreational vehicle will be prohibited. Any resident with RV's will need to store the vehicles at a public storage facility offsite. Therefore, there is no necessity to provide a storage area. (2) The applicant opposes the recommendation to provide one additional parking space for every three dwelling units in addition to the required 2 spaces per dweling unit. This section is not a mandate since it refers to the word "may" not shall or should. The applicant for the apartment complex has provided two (2) parking spaces per dwelling unit as specified in Section 11-13-15-B of the Meridian Ordinance. The standard of two spaces per unit is universal in most jurisdictions. The applicant has also provided attached garages which enhances the aesthetics of the project with less hard surface areas. Driveways (tandem parking) to the garages provides additional parking for.guests. (3) No maintenance building is proposed with the multi -family or commercial project. The applicants intend to contract with a landscape company for maintenance of common areas and landscaping. Therefore, this requirement should 0101\CityMer Hawkins -Clark Response.ltr MAR -22-2000 12:24 B�GGS ENGINEERING, INC. 12083452950 P.05 be deleted. 5. A colored site/landscape plan and multiple colored elevations of proposed structures was submitted with the applications. The applicants will need specifics concerning additional information required under Section 12-6-4. it is the applicant's belief that Section 12-6-4 has been satisfied. 6. The applicant is in agreement. 7. The applicant disagrees with the parking requirement of Site B (Apartment Complex). Staff: indicates a requirement of 2.3 spaces/dwelling unit. The Ordinance mandates (2) spaces/du. Staff has never required parking in excess of 2/unit on any previous applications processed by Briggs Engineering. I believe this recommendation is excessive and adds to'paved areas at the expense of landscaping/common areas. The Ordinance does not mandate anything beyond (2) spaces/unit. The parking required condition should be revised to reflect 11400". The Apartment Complex was designed with 401 parking spaces (garages and open parking) to meet the Ordinance requirement of 2 spaces/unit. The tandem parking (driveways in front of attached garages) was considered excess, yet was referenced on the site plan. Mr. McKeegan,. the architect for the Ice Arena believes the parking provided (278 spaces) will be under utilized most of the time. (See Mr. McKeegan's letter attached.) Customers of the rink will have the ability to park in adjoining lots during heavy peak hours for ishe rink. We believe a minor amount of over—flow parking is reasonable. Please refer to the letter from Patrick McKeegan dated March 21, 2000 for additional information on the Ice Arena's parking needs and hours of operation. The applicant will revise the site plan and remove the three rows of parking stalls which back directly into the access driveways on Site A. 8. The applicant will comply with landscaping requirements for parking lots. 9_ The applicant is in agreement and will delineate the necessary cross access easements on the final plat for lots which may share private access driveways. 10. The applicant will comply. 11. The applicant for the Apartment Complex will prohibit the parking of recreational vehicles within the complex. 12. The maintenance of common areas will be contracted with a lawn care company. Therefore, there is no practical need for a maintenance building for any of the proposed developments. 13. A site plan was sent to Meridian Sanitary Services for their review and comment. A meeting has been scheduled with Bill Gregory, Meridian Sanitary Services on March 22, 2000 to obtain recommendations for trash enclosure locations. The applicant will comply. 14. See letter from Patrick McKeegan concerning hours of operation for the Ice Arena. We agree that hours of operation are important in order to coexist with existing residential development and the proposed multi -family development. 15. An easement for a possible future bus stop could be provided on the plat. 0101\CityMer Hawkins -Clark Response.ln- -GeiGG 1�`�4 BRIGGS ENGINEERING, •+....aaa., �._�„ INC. 12083452950 P. oG —����w• ���V. IOUuyv uve _ --�� (ZUti) 344-9700 The inclusion of bicycle racks within the development is acceptable_ 16. The applicant is in agreement. 17. The applicant proposes the V2K Lane as a private driveway. The applicant does n intend to construct this as a public street with curb of ,gutter and sidewalk. SUP (A�artme„r r^*nnlex) Reauirement� (File CUP -00-017) I • The applicant agrees, with the exception of those conditions which we have documented our opposition. ned 2. The applicant disagrees with the limitation of the apartment complex to 30 units. it is economically feasible to construct the necessarynot sewer, water, roadways & parking) to accommodate infrastructure0nits. (See letter from West, LLC.) Desert, It is our desire to encourage ACHD to consider a private/public effort to improve Overland Road. 3. The applicant will comply with ADA requirements. CUP ("The Pond" Tei+ Arena) Reauirem= (pile CUP -00-015) 1 • The applicant agrees with the exception of those conditions which we have documented Opposition. 2. The applicant will comply. (See Patrick McKeegan's letter dated March 21. 2000.) Sincerely, BRI S 1:?N(i1NEERINGatAV, Oma• Becky L. Bowcutt Land Use Planner BLB:fc 01011CiryMer .Hawkins -Clark Response, hr MAR -22-2000 12:25 0 G ENGINEERING, INC. �=A Patrick WKeegan Architects 419 S. 81► Street, Suite e Boise, Idaho 83702-7157 208.424.8608 Fax 208.424.8609 www.mckeeganarch.com March 21, 2000 Becky Bowcutt Briggs Engineering 1800 W. Overland road - Boise, ID 83705 Re: Pond Ice Arena CUP Report Response Project No. 99052 Dear Becky, 0 12083452950 P.07 I have reviewed Meridian's comments and am pleased with the positive response. My response to their comments on the Ice Facility follows. For clarity I have indicated the City's page and paragraph number. Page 3, Item 4. Transportation Management Plan. We support the concept and would participate in a development wide plan. Page 3, Item 5: Drainage. Will there be a development wide drainage plan or will we be required to maintain all:drainage on our parcel? Our civil engineer has indicated that we can accommodate our drainage runoff on our parcel. Page 4, Item 2: C•N zoning. I assume that since staff has not stated the Ice Rink use is not allowed in the C -N zoning that it is. We have no problem with the designation for our use. Page 5, Item 4 and Page 0 Item 5: Pressurized irrigation system. Will this be a development wide system or will each parcel be responsible for its needs? Page 9, Item 9: Perimeter fencing. Will the fencing be installed by the development or are we responsible for the portion abutting our proposed lot? Page 7 Item 2: Conceptual approval only. It was Mr. Smith's understanding that our application was for CU approval of our project also. when is the earliest we could apply for our CU? Page 8, Item 5. Colored rendering. I thought we fumished one with our previous package to you. I have enclosed another for this submission- MAR-221-20111 ubmission_MAR 1-201111 15:45 208 424 s?6g9 P.01 LIAR -22-2000 12:25V 225I GS ENGINEERING INC. 12083452950 P.08 Is Page 9, Item T: Additional detail on operations. Mr. Smith has conducted focus groups to determine the feasibility for this facility and what the communities needs are for ice related recreation. He is also actively involved in the local recreational hockey leagues. Much of the information is proprietairy business information but I can summarized our plans as follows: There is a need in the area for additional ice facilities. ice World is currently running at full capacity and cannot support the current need or anticipated growth in hockey. y of the adult participants worknon-traditional hours because of the nature of the major employers (Micron, HP, etc.) running multiple shifts. There is a need for a facility that will provide around the clock ice facilities. Our facility will be open 24 hours but except for a few peak periods during the day will not require anywhere near the parking that is being requested. For example if both sheets were being used by four teams there would be approximately 64 persons on the ice. During open recreational skating there might be as many as 100 persons on one or both sheets. Open recreational skating will be scheduled after school and during the early evenings when the sheets are not scheduled for practice. The majority of the time the ice will be scheduled by teams (16 players plus coaches) for practice on a rotating basis. We anticipate once a month having tournaments or other events that would require the full parking count. These would usually occur during the weekend or evenings when the office parking would not be used. We believe the parking we have provided will be underutilized most of the time and that the shared use for the additional 6 seats is reasonable. We had hoped the City would allow more shared parking so the total development parking lots would not need to be so large. Page 10, Item 15: Bicycle racks. They will be provided at our facility. Page 11, Item 2: HC parking spaces. 5 additional HC parking spaces will be designated. If you have any questions, or need more information, please call. Sincerely, Patrick McKeegan Architects /Patrick ZVgan Principal Architect MAR -21-2000 15;46 208 424 8609 P•0;12 MAR -22-2000 12:25 BEGS ENGINEERING, INC. 0 12003452950 P.09 Desert Nest Properties, LLC 3/21/00 Plaaaing & Zoning Commission / Mayor & City Council City of Meridian 33 East Idaho Meridian, Idaho 83642 Re: Comments on the submittal review comments for the 200 unit Luxury Apartment Complex by Desert West Properties, LLC Dear, Commission and council With regard to conditions proposed in the March 20"' 2000 review of our application for a Conditional Use Permit (File CUP -00-015) We would like to address the items that pertain to the 200 Unit Luxury Apartment complex. Preliminary Plat Requirements (Pile PP -00-006) Item 10: It is the preference of the applicant to pipe the hunter lateral as well as construct the 6' fence. It is our opinion that the perimeter fence is necessary to maintain the level of security and cleanliness that our clientele will expect from a facility of this caliber. We ask- the City council to allow us to provide this important amenity. Thank you. Item 11: The applicant would be agreeable to this condition provided that we are able to limit the traffic into the complex to residents only, thereby protecting the project from drive threw traffic that would be detrimental to the peace and tranquility of our secured environment. CUP (PUD/Commercial) Requirements (File CUP -00-017) Item 7: The applicant believes that there has been an error in the calculation of the required parking. When the tandem parking spaces are deducted from the total of the proposed parking, 401 spaces remain. It is our understanding that there are 2 stalls required for each of the 200 units equaling 400 stalls. Item 8: It is our intent to comply with this request fully. Item 11: It is the intent of the applicant to restrict parking to automobiles and light duty trucks able to fit into one stall. Storage of boats, campers, motorhomes, trailers and vehicles that are inoperable or not used regularly will not be allowed and the owner will be required to secure suitable storage elsewhere. MAP -'tit -2000 08:35 202�A� , 93. P. 02 MAR -22-2000 12:26 1 GS ENGINEERING, INC: 12083452950 P.10 Item 12: The applicant will be subcontracting maintenance and grounds keeping to a qualified professional. Item 13: the applicant intends to conform to this request in full. CUP (Apartment Complex) requirements (Pile CUP -00-017) Item 2: The applicant has concluded that it is not economically feasible to limit the number of units that can be built in phase I, and requests that the council delete such a requirement, as it would -interfere with the ability of the business to be profitable. We are aware of the traffic problem on Overland road, however, it is our belief that by developing this site fully and paying the ACRID impact fees we will be closer to funding the expansion than if development is drawn out and funding is riot as available. In addition, the 1,170 trips per day estimated by Dobie Engineering is somewhat insignificant when compared to the traffic generated by the High school and other commercial enterprises. We appreciate responsibility that you bear and thank you for the service you render in behalf of this community. Sincerely, The Principles of Desert West Property LLC MAR -22-2000 0�1:35 Desen Wot Fmpvties. U.C. PO Box 1070 Meridian. Idaho $1642 (108) 6960800 Fax. (208) 69&9527 833 389527 93/*. P.03 Irn'rni (3 in