Loading...
HomeMy WebLinkAboutACHD~t MERIDIAN PLANNING & ZONING MEETING: Mav 9. 2000 APPLICANT: G.L. VOIGT ITEM NUMBER: 1-6 REQUEST: RESOLUTION BUSINESS PARK-ALL SIX PROJECTS AGENCY AG~,.p Corrtrr-er~ COMMENTS CITY CLERK: CITY ENGINEER: CITY PLANNING & ZONING DEPT. CITY ATTORNEY: CITY POLICE DEPT: CITY FIRE DEPT: CITY BUILDING DEPT: CITY WASTE WATER DEPT: CITY WATER DEPT: MERIDIAN SCHOOL DISTRICT: MERIDIAN POST OFFICE: ADA COUNTY HIGHWAY DISTRICT: ADA COUNTY STREET NAME COMMITTEE: CENTRAL DISTRICT HEALTH: NAMPA MERIDIAN IRRIGATION: SETTLERS IRRIGATION: IDAHO POWER: US WEST: BUREAU OF RECLAMATION: INTERMOUNTAIN GAS: SANITARY SERVICE: OTHER: All Materials presented at public meetings shall become property of the City of Meridian. ~ 1409 MAY 09, 2000 TEL N0~ (208) 387-6391 ADA COUNTY HIGHWAY DISTRICT Planning and Development Division Development Application Report Preliminary Plat -Resolution Business Park / Locust Grove Rd/Overland Road MAZ00-004/1V1CUP00-015/MCUP00-016/ MCUP00-017 An application for a preliminary plat has been submitted to the City of Meridian fora 17-lot residential and commercial subdivision on 107.06-acres. The applicant is also requesting conditional use and rezone approval. The City has forwarded the application to ACHD for review and comment. The site is located at the southeast corner of Overland Road and Locust Grove Road. This development is estimated to generate 9,430 additional vehicle trips per day based on the submitted traffic study. Roads impacted by this development: Locust Grove Road Overland Road ACHD Commission Date -May 3, 2000 - 12:00 p.m. Resolution Subdivision Page 1 ~ 1409 MAY 09, 2000 Facts and Findings: A. General Information TEL N0~ (208) 387-6391 Owner - G.I. Voigt Applicant -Same R-4, RT -Existing zoning L-O, C-G -Requested zoning 107.06 -Acres • 17 -Proposed lots 200 -Proposed multi-family dwelling units 346,000 - Squaze feet of proposed building 125,000-square feet of Office building 145,000-squaze feet of Retail building 57,000-square feet of an Ice Rink 19,000-square feet of Day Care Center Meridian High School 2,300 -Total lineal feet of proposed public streets 286 -Traffic Analysis Zone (TAZ) West Ada -Impact Fee Service Area Meridian -Impact Fee Assessment District Locust Grove Road Minor arterial with bike lane designation Traffic count 3,552 on 7-16-99 A-Existing Level of Service C-Existing plus project build-out Level of Service 950-feet of frontage 50 to 70-feet existing right-of-way (25-feet from centerline) 96-feet required right-of-way (48-feet from centerline) Locust Grove Road is improved with two lanes with no curb, gutter or sidewalk. The segment of Locust Grove Road abutting the site is not listed in the current Five Year Work Program for reconstruction. Overland Road Minor arterial with bike lane designation Traffic count 11 on 11-30-99 (west of Eagle Road) Traffic count 9,916 on 11-23-99 (west of Locust Grove Road) D-Existing Level of Service E-Existing plus project build-out Level of Service 2,640-feet of frontage 50 to 70-feet existing right-of-way (25-feet from centerline) 96-feet required right-of-way (48-feet from centerline) Resolution Subdivision Page 2 t 14 10 MAY 09, 2000 B. C. D E F TEL N0~ (208) 387-6391 Overland Rod is improved with two lanes with no curb, gutter or sidewalk. The segment of Overland Road abutting the site is listed in the current Five-Year Work Program for reconstruction to 5-lane in FY (2004). Blue Tick Street/Brandys Jewel Street Local streets with no bike lane designation No traffic count available 50-feet of frontage 50-feet existing right-of--way (25-feet from centerline) 50-feet required right-of-way for their extensions Blue Tick Street and Brandys Jewel Street are improved as 37-foot street section with curb, gutter and sidewalk. ' On March 27, 2000, the District Planning and Development staff inspected this site and evaluated the transportation system in the vicinity. On March 31, 2000, the staff met as the District's Technical Review Committee and reviewed the impacts of this proposed development on the Districts transportation system. The results of that analysis constitute the following Facts and Findings and recommended Site Specific Requirements. Locust Grove Road has 3,522 existing vehicle trips per day, which is a Level of Service A (LOS A). An acceptable Level of Service for this segment of roadway is D (LOS D) or 14,000 vehicle trips per day. The proposed application will add approximately 3,000 vehicle trips per day on Locust Grove Road. Current traffic counts indicate that Overland Road carries 11,422 vehicle trips per day (VTD). The planning threshold for Overland Road is 14, 000 VDT with its current configuration. When Overland Road is rebuilt to five lanes, the planning threshold for Overland Road will be 33,000 VTD. The proposed application will add approximately 6,000 vehicl~esholdrof Over and rRoad Road, therefore the existing, plus project traffic exceeds the planning with its current configuration. When Overaand from thisebtelt to five-lanes, the roadway will be adequate to accommodate the traffic gen The Eagle Road/Overland Road intersection operates at a Level of Service E/F threshold, and is listed as one of 100 critical intersections in Ada County. The subject site's additional traffic will exacerbate the traffic problems at the intersection. The District has akeady initiated a project (to be started within the next few months) to provide additional turn lanes and make other capacity enhancements to improve the intersections' operating characteristics. The improvement plans have not been finalized but the anticipation is for a substantial increase in capacity. The Meridian Road/Overland Road intersection operates at a Level of Service F (LOS F), and is listed as one of 100 critical intersections in Ada County. The subject site's additional traffic will exacerbate the traffic problems at the intersection. G. A traffic study was submitted for the Resolution Subdivision site development plan. The key findings of the traffic study include the following: Resolution Subdivision Page 3 1 14 10 MAY 09, 2000 TEL N0~ (208) 387-6391 • The proposed development is expected to generate 12,495 total daily vehicle trips. An estimated 3,045 trips are pass-by trips, leaving 9,430. new daily vehicle trips added to the adjacent roadway system. • The Meridian Road/Overland Road intersection currently operates at Level of Service (LOS) F. Because Meridian Road is a principal arterial, LOS E is acceptable under current District policy. The intersection exceeds the allowable Level of Service. • Under "existing plus project" traffic volumes (Yeaz 2005), the Meridian Road/Overland Road intersection is expected to operate at Level of Service (LOS) F. The District has currently programmed a project to upgrade Overland Road to create additional capacity. The design and magnitude of the improvements have not yet been determined. Because Meridian Road is a principal arterial, LOS E is acceptable under current District policy. • The Locust Grove Road/Overland Road intersection currently operates at an overall Level of Service (LOS) A. The intersection is STOP controlled only on the two Locust Grove Road approaches. Left turns from northbound Locust Grove on to westbound Overland Road operate at an LOS F condition. If a traffic signal were constructed with the existing traffic volumes and roadway geometry, the intersection would operate at an overall LOS B. • Under the existing traffic volumes, Locust Grove Road operates at an arterial LOS of A with volume-to-capacity ratios of less than 0.35 during peak hour conditions. • The Yeaz 2020 traffic forecast of 18,000 vehicles per day for Overland Road indicates the need to widen the roadway -from two to five lanes. The widening is desirable from an operational and safety standpoint and is required within 500 feet of the Eagle Road intersection. • The Yeaz 2020 traffic forecast of 8,700 vehicles per day for Locust Grove Road does not indicate the need to add capacity. • The forecast traffic volumes at the Locust Grove Road intersection with Overland Road justify a traffic signal under existing plus project traffic volumes. The applicant should be required to provide 25-percent of the cost for the traffic signal, which is $37,500.00. The District will construct the traffic signal when it is warranted. • The site driveways on Overland Road are expected to have traffic volumes low enough that traffic signals aze not needed. • The new public street intersection on Overland Road is expected to have traffic volumes that warrant a traffic signal. The applicant should be required to provide 75-percent of the cost to construct the traffic signal, which is $112,500.00 (total cost is $150,000). The District will construct the traffic signal when it is warranted. The site driveway intersections on Locust Grove Road are expected to have traffic '~/ volumes low enough that traffic signals are not needed, however, all fl,P intersections on Locust Grove Road will re uire the ~ e• • All the intersections on Overland Road will require the construction of a center turn lane. Due to the locations of the intersections and the taper lengths required for the turn lanes, the applicant would be required to add another traffic lane on Overland Road abutting the entire site. • The consultant was not awaze of ACHD's project to widen the Overland Road/Eagle Road intersection when the TIS was performed. The Eagle Road/Overland Road intersection was identified to operate at Level of Service (LOS) F under existing and build out conditions. The District is adding turn-lanes at the intersection this fiscal year, Resolution Subdivision Page 4 ~14~11 MAY 09, 2000 TEL N0~ (208) 387-6391 which will improve the operations of the intersection to an adequate Level of Service D (LOS D). Overland Road is scheduled for reconstruction from two to five lanes in FY 2004. When the roadway is reconstructed to five lanes, the intersection will operate at an adequate Level of Service C (LOS C). H. The applicant is proposing a stub street to the south property line located 1,000-feet west of the east property line. District Staff supports the location of the stub street. The applicant should provide a paved temporary turnazound at the end of the stub street with a temporary easement provided to the District. The applicant should be required to install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FLTTLIRE" • Coordinate the sign plan for the stub street, and the design of the turnazound with District staff. I. The applicant is proposing a stub street to the east property line located 400-feet south of Overland Road. District Staff supports the location of the stub street. The applicant should provide a paved temporary turnazound at the end of the stub street with a temporary easement provided to the District. The applicant should be required to install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". Coordinate the sign plan for the stub street, and the design of the turnaround with District staff. J. The improvement of Overland Road abutting this development is included in the District's current Five Yeaz Work Program. District policy requires the applicant to provide a $52,800.00 deposit to the Public Rights-of--Way Trust Fund for the cost of constructing a 5-foot wide concrete sidewalk on Overland Road abutting the pazcel (approximately 2,640-feet) prior to District approval of a final plat, whichever occurs first. K. The improvement of Locust Grove Road abutting this development is not included in the District's current Five Yeaz Work Program. District policy requires the applicant to construct a 5-foot wide concrete sidewalk on Locust Grove Road abutting the pazcel prior to District approval of a final plat. The sidewalk should be located two feet within the new right-of-way of Locust Grove Road. Coordinate the location and elevation of the sidewalk with District staff. L. The applicant is proposing two driveways on Locust Grove Road. The driveways are located as follows: • The northern driveway is proposed to be located 440-feet south of Overland Road. • The southern driveway is proposed to be located 690-feet south of Overland Road. Peacock Street intersects Locust Grove Road from the west approximately 550-feet south of Overland Road and Labrador Street approximately 1,100-feet south of Overland Road. District policy requires the applicant to locate driveways on Locust Grove Road a minimum of 440-feet south of Overland Road and 220-feet from the streets on the west side of Locust Grove Road. The applicant's proposed driveways do not meet the required offset from Peacock Street on the west side of Locust Grove Road. The applicant should be required to locate the northern driveway to align with Peacock Street to west, and the southern driveway should be located 75- feet north of the south property line. The driveways should be constructed 30 to 35-foot wide with 15-foot radii pavement tapers abutting the roadway. The applicant should be required to Resolution Subdivision Page 5 14 11 MAY 09, 2000 TEL N0~ (208) 387-6391 • provide 100-feet of stacking for both the inbound and out-bound travel lanes for the driveway. Coordinate the design of the driveways with District staff. M. The applicant is proposing three driveways on Overland Road. The driveways are located as follows: • 480-feet east of Locust Grove Road:' based on the submitted traffic study the applicant should be required to provide a minimum of 50-feet of stacking for this driveway. • 930-feet east of Locust Grove Road: based on the submitted traffic study the applicant should be required to provide a minimum of 50-feet of stacking for this driveway. • 1,280-feet east of Locust Grove Road: based on the submitted traffic study the applicant should be required to provide a minimum of 100-feet of stacking for this driveway. All the driveways align with existing driveways on the north side of the road, which meets District policy. The driveways should be constructed 30 to 35-feet wide with 15-foot radii pavement tapers abutting the existing roadway edge. N. The applicant is proposing to construct two public roads off Overland Road. The roads are proposed to be located: • 320-feet west of the east property line: based on the, submitted traffic study the applicant should be required to locate driveways off this public street a minimum of 100-feet south of Overland Road. The roadway should be constructed as a 40- foot street section with curbs gutters and 5-foot wide concrete sidewalks within 58-feet of right-of-way. • 850-feet west of the east property line: based on the submitted traffic study this roadway should be signalized and driveways on this roadway should be located a minimum of 175-feet south of Overland Road and consecutive driveways should be required to align or offset a minimum of 150-feet. The roadway should be constructed as a 46-foot street section with curbs, gutters, and a 5-foot wide concrete sidewalk within 64-feet of right-of-way. This road should be signalized. The applicant should be required to construct a signal for the new intersection. Coordinate the design of the signalized intersection with District staff. The District should provide 25-percent of the cost of the signal. • The applicant is proposing aneast/west road located 400-feet south of Overland Road: the applicant should be required to locate driveways on the new roadway a minimum of 50-feet from a public street intersection. The applicant is proposing a traffic circles within the roadway. The street section around the traffic circle should be constructed 29-feet wide. A YIELD sign should be installed at all approaches into the islands and directional islands should be constructed in the street approaches to the traffic circles to guide motorists in the proper direction. The pedestrian crossings shall be located at the intersection to improve pedestrian/vehiculaz recognition and safety. Coordinate the traffic control plan and location of the pedestrian crossings with District staff. Resolution Subdivision Page 6 14 12 MAY 09, 2000 TEL N0~ (208) 387-6391 In order to provide safe turning movements into the driveways and streets on Overland Road and avoid a continuous meandering travel path a continuous turning lane is required from Locust Grove Road to the east property line. The design will provide turning movement at all driveways and streets through and including Locust Grove and new east-west street. O. ACHD's Pazk & Ride Division Staff have indicated the need for a pazk and ride location at the applicant's site. The District requests that applicant grant the District an easement fora 10 to 12- space Pazk & Ride azea at this site. Commuteride staff will contact the applicant to coordinate the location of the Park & Ride area. P. In order to reduce trips to and from this development~it is recommended that Tenants occupying the proposed building be required to provide an Alternative Transportation Program for employees and provide an annual report to ACHD on employee participation. Commuteride staff will coordinate the Alternative Transportation Program with the applicant. For more information contact Pat Nelson at 387-6160. Q. In order to reduce trips to and from this development, it is recommended that the tenants occupying the proposed building(s) be required to participate in any Transportation Management Association (TMA) or Transportation Management Organization (TMO) that is formed with a boundary that includes this site or is adjacent to this development. R. A Transportation Management Association (TMA) or Transportation Management Organization (TMO) is formed with a coordinator that works as a liaison between businesses and private and public transportation providers to increase the use of alternative transportation and other trip reduction measures (shuttle buses, bus pass programs, vanpools, carpools, bicycle and walking enhancements). An annual survey will be required of the TMA/TMO to monitor participation in alternative transportation programs and forwarded to the ACHD Commuteride Office. S. District policy states that direct access to arterials and collectors is normally restricted and that the developer shall try to use combined access points. In accordance with District policy the applicant should be required to provide a recorded cross access easement among the lots within the proposed subdivision for use to access the public streets prior to issuance of a building permit (or other required permits). T. The applicant should be required to construct a center turn lane on Locust Grove Road abutting the entire site. Coordinate the design of the turn lane with District staff. U. The applicant should be required to construct a center turn lane on Overland Road abutting the entire site. Coordinate the design of the turn lane with District staff. V. Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with past action by the District the applicant should be required to pave all driveways their full width and at least 30-feet into the site beyond the edge of pavement of Overland Road and Locust Grove Road and install pavement tapers with 15-foot radii abutting the existing roadway edge. W. In accordance with District policy, stub streets to the undeveloped pazcels abutting this site may be required upon review of a future application for this site. Resolution Subdivision Page 7 1413 MRY 09, 2000 TEL N0~ (208) 387-6391 #2601 PAGE 9113 r X. As required by District policy, restrictions on the width, number and locations of driveways, may be placed on future development of this pazcel. Y. In accordance with District policy, stub streets to the school pazcel abutting this site should be extended upon review of a future application for this site. z. Based on development patterns in this area and the resulting traffic generation, staff anticipates that the transportation system will require improvement in order to accommodate the additional traffic generated by this proposed development. The Overland Road/Meridian Road intersection currently operates at deficient Level of Service F (LOS F), and is listed as one of the 100 critical intersections in Ada County. The reconstruction of the intersection by the District is not listed in ACHD's Five year Work Program. The following Site Specific Requirements and Standard Requirements must be met or provided for prior to ACHD approval of the final plat: Special Recommendation to City of Meridian: In order to reduce trips to and from this development it is recommended that tenants occupying the proposed building be required to provide an Alternative Transportation Program for employees and provide an annual report to ACHD on employee participation. Commuteride staff will coordinate the Alternative Transportation Program with the applicant. For more information contact Ms Pat Nelson at 387-6160. 2. In order to reduce trips to and from this development, the tenants occupying the proposed building(s) should be required to participate in any Transportation Management Association (TMA) or Transportation Management Organization (TMO) that is formed with a boundary that includes this site or is adjacent to this development. ACHD's Park & Ride Division Staff have indicated the need for a park and ride location at the applicant's site. The District requests that applicant grant the District an easement fora 10 to 12-space Park & Ride area at this site. Commuteride staff will contact the applicant to coordinate the location of the Park & Ride azea. 4. The transportation system will require improvement in order to accommodate the additional traffic generated by additional development. The Overland Road/Meridian Road intersection currently operates at a deficient Level of Service F (LOS F), and is listed as one of 100 critical intersections in Ada County. Additional traffic will exacerbate the traffic problems at the intersection. The reconstruction of the Overland Road/Meridian Road Street intersection is not currently listed in ACHD's Five year Work Program. Resolution Subdivision Page 8 . 14 13 MAY 09, 2000 TEL N0: (208) 387-6391 Site Specific Requirements: Dedicate 48-feet ofright-of--way from the centerline of Overland Road abutting the parcel by means of recordation of a fmal subdivision plat or execution of a warranty deed prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will be compensated for all right-of-way dedicated as an addition to existing right-of-way from available impact fee revenues in this benefit zone, if the owner submits a letter of application to the impact fee administrator prior to breaking ground, in accordance with Section 1 ~ of ACHD Ordinance # 193. 2. Dedicate 48-feet of right-of-way from the centerline of Locust Grove Road abutting the parcel by means of recordation of a fmal subdivision plat or execution of a warranty deed prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will be compensated for all right-of--way dedicated as an addition to existing right-of-way from available impact fee revenues in this benefit zone, if the owner submits a letter of application. to the impact fee administrator prior to breaking ground, in accordance with Section 15 of ACHD Ordinance # 193. Provide a stub street to the south property line located 1,000-feet west of the east property line. Provide a paved temporary turnazound at the end of the stub with a temporary easement provided to the District. Install a sign at the terninus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". Coordinate the sign plan for the stub street, and the design of the turnazound with District staff. 4. Provide a stub street to the east property line located 400-feet south of Overland Road. Provide a paved temporary turnazound at the end of the stub with a temporary easement provided to the District. Install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FLJT'i1RE". Coordinate the sign plan for the stub street, and the design of the turnazound with District staff. 5. Provide a $112,500.00 deposit to the Public Rights-of--Way Trust Fund for 75-percent of the cost to construct a traffic signal on Overland Road for the new collector roadway. The District will construct the signal when it is warranted. 6. Provide a $37,500.00 deposit to the Public Rights-of--Way Trust Fund for 25-percent of the cost of constructing a traffic signal at the Overland Road/Locust Grove Road intersection. The District will construct the signal when it is warranted. ~~%~~"~"~ Provide a $52,800.00 deposit to the Public Rights-of--Way Trust Fund for the cost of constructing a 5-foot wide concrete sidewalk on Overland Road abutting the parcel (approximately 2,640-feet) prior to District approval of a final plat, whichever occurs first. 8. Construct a 5-foot wide concrete sidewalk on Locust Grove Road abutting the parcel prior to District approval of a final plat. Locate the sidewalk two feet within the new right-of-way of Locust Grove Road. Coordinate the location and elevation of the sidewalk with District staff. Resolution Subdivision Page 9 1414 MAY 09, 2000 9. Locate two driveways on Locust Grove Road as follows: • The northern driveway shall be located 550-feet south of Overland Road to align with Peacock Street to the west. ' • The southern driveway shall be located 75-feet north of the south property line. The driveways shall be constructed 30 to 35-foot wide with 15-foot radii pavement tapers abutting the roadway. Provide 100-feet of stacking for both the inbound and out-bound travel lanes for the driveways. Coordinate the design of the driveways, with District staff: 10. Locate three driveways on Overland Road as follows: • 480-feet east of Locust Grove Road: provide a minimum of 50-feet of stacking for this driveway. • 930-feet east of Locust Grove Road: provide a minimum of 50-feet of stacking for this driveway. • 1,280-feet east of Locust Grove Road: provide a minimum of 100-feet of stacking for this driveway. The driveways shall be constructed 30 to 35-feet wide with 15-foot radii pavement tapers abutting the existing roadway edge. 11. Locate two public roads as follows: • off Overland Road 320-feet west of the east property line: locate driveways off this public street a minimum of 100-feet south of Overland Road. The roadway shall be constructed as a 40-foot street section with curbs gutters and 5-foot wide concrete sidewalks within 58-feet ofright-of--way. • off Overland Road 850-feet west of the east property line: driveways off this roadway shall be located a minimum of 175-feet south of Overland Road and consecutive driveways are required to align or offset a minimum of 150-feet. The roadway shall be constructed as a 46-foot street section with curbs, gutters, and a 5-foot wide concrete sidewalk within 64-feet ofright-of-way. The applicant shall be required to construct a signal for the roadway/Overland Road intersection. Coordinate the design of the signalized intersection with District staff': . 12. Locate aneast/west road 400-feet south of Overland Road: locate driveways on the east/west roadway a minimum of 50-feet from a public street intersection. The traffic circle within the roadway shall be constructed to provide a minimum of 29-feet wide street section azound the traffic circle. A YIELD sign shall be installed at all approaches into the island and a directional island shall be constructed in the street approaches to the traffic circle to guide motorists in the proper direction. The pedestrian crossings shall be located at the intersection to improve pedestrian/vehiculaz recognition and safety. Coordinate the design of the buffer circle, the traffic control plan and location of the pedestrian crossings with District staff: 13. As required by District policy, restrictions on the width, number and locations of driveways, shall be placed on future development of this pazcel. Resolution Subdivision Page 10 ~ ~ 14~ Construct a center turn lane on Overland Road abutting the entire site. 15. In accordance with District policy, stub streets to the school parcel abutting this site should be extended upon review of a future application for this site. lb. Other than the access points specifically approved with this application, direct lot or pazcel access to Overland Road and Locust Grove Road is prohibited. Lot access restrictions, as required with this application, shall be stated on the final plat. Standard Requirements: A request for modification, variance or waiver of any requirement or policy outlined herein shall be made in writing to the ACHD Planning and Development Supervisor. The request shall specifically identify each requirement to be reconsidered and include a written explanation of why such a requirement would result in a substantial hardship or inequity. The written request shall be submitted to the District no later than 9:00 a.m. on the day scheduled for ACHD Commission action. Those items shall be rescheduled for discussion with the Commission on the next available meeting agenda. Requests submitted to the District after 9:00 a.m. on the day scheduled for Commission action do not provide sufficient time for District staff to remove the item from the consent agenda and report to the Commission regazding the requested modification, variance or waiver. Those items will be acted on by the Commission unless removed from the agenda by the Commission. 2. After ACHD Commission action, any request for reconsideration of the Commission's action shall be made in writing to the Planning and Development Supervisor within six days of the action and shall include a minimum fee of $110.00. The request for reconsideration shall specifically identify each requirement to be reconsidered and include written documentation of data that was not available to the Commission at the time of its orieinal decision. The request for reconsideration will be heazd by the District Commission at the next regular meeting of the Commission. If the Commission agrees to reconsider the action, the applicant will be notified of the date and time of the Commission meeting at which the reconsideration will be heard. 3. Payment of applicable road impact fees aze required prior to building construction in accordance with Ordinance # 193, also. known as Ada County Highway District Road Impact Fee Ordinance. 4. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standazds and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 6. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. Resolution Subdivision Page 11 14 15 f`1HY Oy, 2000 TEL N0~ (208) 387-6391 #2601 PAGE 13113 7. It is the responsibility of the applicant to verify all existing utilities within the right-of--way. Existing utilities damaged by the applicant shall be repaired by the applicant at no cost to ACHD. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACRD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 8. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confurnation of any change from the Ada County Highway District. 9. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless awaiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. Conclusion of Law: ACRD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the proposed development. Should you have any questions or comments, please contact the Planning and Development Division at 387-6170. Submitted bv: Commission Action: Planning and Development Staff May 3, 2000 Resolution Subdivision Page 12