Tara,
Please include the attached file as part of the Meridian Town Center project. This is a response from
David Kleiner regarding the Kleiner DA provisions.
David will send you an a-mail to confirm that he did, indeed, want these included in the record.
Thanks, Tara,
Anna
From: David Kleiner [mailto:davidkleiner00@grnail.com]
Sent: Friday, January 04, 2008 3:14 PM
To: Anna Canning
Cc: Kleiner Karl
Subject: revised DA terms
Anna,
We are satisfied with your proposal. I have made a redline change to make clear that the pathway will
satisfy both the Pathways Plan requirement and the road pathway/sidewalk requirement.
Please let me know if you have any further concerns. Otherwise, we will go with the proposed language
as agreed in the attached clean version file. Would it be possible for you to forward this for Council
consideration or do we need to forward this ourselves?
David
1 /7/2008
Kleiner DA Terms Clarification and Request
Requested clarification:
1. Agricultural use, including production of crops, shall continue to be allowed after
annexation as an urban farm use, which is a principal permitted use under 11-4-3-28 and
11-2B-2.
See below for requested terms regarding pathway requirement. This is requested so that
Owner will construct two north-south pathways, instead of three north-south pathways
for the West Parcel. One pathway will be constructed along Eagle Road and a second
pathway between 1 /8 and '/ mile west of Eagle Road.
2. Pathway requirement for West Parcel:
Owner shall provide a second pathway running generally north-south from Fairview
Avenue to River Valley Road in addition to the 10' multi-use pathway along Eagle Road.
Owner shall not be required to construct a third north-south pathway for the West Parcel.
This second pathway shall serve as the multi-use pathway required by the Pathways Plan
and shall be generally situated in the western one half of the West Parcel, from the
general vicinity of the 1/8 mile line west of Eagle Road, with allowance made for the
final location of the 1/8 mile access on Fairview Avenue, to the west boundary at roughly
'/o mile from Eagle Road.. The pathway may run separate from or in connection with a
drive aisle or road; and will satisfy both the Pathways Plan requirement and the road
sidewalk/pathway requirement if it is run in connection with the road. The pathway may
be constructed as a detached 5' sidewalk with 5' landscape strip or as a 10' multi-use
pathway.