Loading...
HomeMy WebLinkAboutITD CommentsIDAHO TRANSPORTATION DEPARTMENT P.O. Box 8028 Boise, ID 83707-2028 (208) 334-8300 itd.idaho.gov August 28, 2006 City of Meridian Planning Department 660 E. Watertower Lane Suite 202 Meridian, Idaho 83642 FAX 888-6854 Re: Location: SEC of Meridian Rd & Victory Rd. Route: SFi 69 MP 8.212 .Name: Kastera Development, LL Case No. MI 07-011 Hearing Date: January 8, 2008 Dear Zoning Administrator, Thank you for the opportunity to comment on the referenced application. Direct access to Meridian Road (SH 69) will not be considered. Access to this subdivision will be from Victory Road and Rumple Lane. Any work done on the State Right of Way will require a permit. Permit applications are available from this office or the maintenance office in Cascade. Please have the applicant contact Matt Ward at 8150 Chinden Blvd. 83714 in Boise or call (208) 334-8341 to obtain a permit application. Noise abatement (berms, fences, etc) will be the responsibility of the developer and will be constructed off of the State Right of Way, see enclosed Noise Abatement Measures. Sincerely, ~J~.-.., nC; Phil Choate Senior Planner IDAHO TRANSPORTATION DEPARTMENT P.O. Box 8028 Boise, fD 83707-2028 (208) 334-8300 itd.idaho.gov Noise Abatement along State Highways Jurisdiction: _~~,.~~~, .Development: ~c ,~~~ GL L G~ R.vwrl~ ~/ ~ cJv~ Date: //-,30 - p ~ It appears this development will have residential frontage on a state highway. This letter serves as notice that the Idaho Transportation Department will not be providing future noise abatement for this development. Any and all traffic noise abatement should be provided by the developer. Per Federal Highway Administration guidelines, if noise abatement is not provided, we would recommend buyers receive full disclosure of anticipated noise levels from highway traffic. We recommend and request the local land use authority require the developer to construct the following noise abatement feature: Noise Abatement for Residential Development A. The applicant shall provide traffic noise abatement by constructing a berm or a berm and wall combination approximately parallel to the state highway and off the state right of way. B. Height: The top of the berm, or berm and wall in combination, shall be a minimum of ten feet higher than the elevation at the centerline of the state highway. C. Wall Materials: If a wall is proposed, the wall shall meet the following standards: ~. Wall materials shall be impervious concrete or stucco, unless otherwise approved by the Idaho Transportation Department as a sound attenuating material. 2. Intermittent breaks in the berm or berm and wall in combination will degrade the function and should not be allowed. D. Alternative noise abatement designs that meet Federal Highway Administration guidelines may be proposed by the developer. The applicant should contact Greg Vitley, Environmental Section Manager at 334-8300 if further information is desired. ITD District Three Planning