Change Order No. 1 with Ridgeway Industrial, Inc. for Water Division Building (2)
CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 1 PROJECT NO. 0607a DATE: 09/13/07 EFFECTIVE DATE: CONTRACTOR: Ridgeway Industrial, Inc. PROJECT: Water Division Building The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: 1) Provide all labor and materials to install (1) additional urinal and (1) additional water closet in the men's locker. 2) Provide all labor and materials to install a water cooled drinking fountain in lieu of specified. 3) Provide additional labor and materials to relocate hose bib as per BRS Architects response to RFI #27. 3) Provide and install (2) downspouts nozzles on roof drain piping as per BRS Architects RFI #14. Reason for Change Order: Construction progress. Attachments: AIA Document G701/CMa -1992 Change Order"- Construction Manager -Advisor Edition Submitted by Kreizenbeck Constructors CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ 67,000.00 Original Contract Times: Completion Net changes form previous Change Orders Net changes form previous Change Orders No.—O— to _0_ No._ to _ (calendar days) $0.00 None Contract Price Prior to this Change Order: Contract Times prior to this Change Order: (calendar days or date) $67,000.00 Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days or date) $5,541.00 Completion by Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $72,541.00 RECOMMENDED: (CONSTRUCTION MANAGER) ACCEPTED: (CONTRACTOR) See provided AIA signed change order See provided AIA signed change order By: By: Date: Date: APPROVE I URCHA$INZ AG T) `\15„I i i i Of A .O,,YNCIL APPROVAL Z By: Keith a Date: Dater N APPROVE (CITY) - _— ATTEST: 4J(�) /1 �', n �Jr By: Mayor Tamm de Weerd By: �C'tyf Clerk 'Will Berg Jr. UUU Date: T n Dom;/ 1 r7 z,-oi 7 Ti �e Document G701/CMa -1992 Change Order - Construction Manager Adviser Edition PROJECT (Name and address): CHANGE ORDER NUMBER: 001 Meridian Water Department Building 06- INITIATION DATE: August 03, 2007 021 2235 Northwest 8th Street Meridian, Idaho 83642 TO CONTRACTOR (Name and address): Ridgeway Industrial, Inc. 2251 East Lanark Street Meridian, Idaho 83642 THE CONTRACT IS CHANGED AS FOLLOWS: PROJECT NUMBERS: 06-021 / 15400 CONTRACT DATE: February 20, 2007 CONTRACT FOR: General Construction OWNER: CONSTRUCTION MANAGER: ARCHITECT: CONTRACTOR: FIELD: OTHER: ❑ 1) Provide all labor and materials to install (1) additional urinal and (1) additional water closet in the men's locker. Work includes: saw cutting, removal, and replacement of existing concrete, excavation and backfill for drain lines, waste and vent piping, domestic water piping, and insulation. All work to be completed as per the direction of The City of Meridian. $ 4,150.00 2) Provide all labor and materials to install a water cooled drinking fountain in lieu of specified as per the direction of The City of Meridian. $ 170.00 3) Provide additional labor and materials to relocate hose bib as per BRS Architects response to RFI #27. $ 577.00 4) Provide and install (2) downspout nozzles on roof drain piping as per BRS Architects response to RF1 #14. $ 644.00 The original Contract Sum was $ 67,000.00 Net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 67,000.00 The Contract Sum will be increased by this Change Order in the amount of $ 5,541.00 The new Contract Sum including this Change Order will be $ 72,541.00 The Contract Time will be unchanged by Zero ( 0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. NOT VALID UNTIL SIGNED BY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR. Kreizenbeck, LLC DBA Kreizenbeck Constructors CONSTRUCTION MANAGER (Firm name) 251 East Front Street, Suite 110, Boise, Idaho 83702 ADDR 00 BY (Signature) e Atr! Michael J. Berard (Typed name)DA : Ridaeway Industrial, Inc. CONTRACTOR (Firm name) 2251 East Lanark Street, Meridian, Idaho 83642 ADDRESS BY (Signa re) (Typed name) DATE: BRS Architects ARCHITECT (Firm name) 1010 S. Allante Street, Suite 100, Boise, IID 83709 ADDR Clinton(Signature) C7 ClYaka �.I (Tvned name) DATE. 660 East BY (Signature) (Typed name) .ri AIA Document G701/CMaTM —1992. Copyright ©1992 by The American Institute of Architects. All rights reserved. WAR"G.` Td1S� protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Docu*j'1t, 8cc�� may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Thlwd" by AIA software at 16:30:37 on 08/06/2007 under Order No.1000280013_1 which expires on 1/17/2008, and is not for resale. User Notes: s \.` \ (2961092845) ' 06-28-' 0 r 18;19 FFOI'9.=T350 208=887-8686 ". -" T-257. PDM'003 F-465 r -GEWAY:�,. 2 2 51 f.lanark t�end�an,14�83642 . 1,10 X209 8R 87 8608 �N RIA �fAXZ208 8818686 _ �R1dye.vQyIRdUSrnpl 'F _ -PLUMBING : ~ - - JOB .3145 J;urie 28, 2007 : _. . ��:rezenbeck,Constru:coon ' _ - _ . 251' l=ast Front St., Shite 110 - Boise, Il) 83702. - - ]?hon.e X36-9500 Fax, 336:7444 - J ATTi..',Br.andon Byingtota - .r SUBJECT- Meridian `dater facility- `Additional Water. Closet &.Urinal pricing ow0R_ A Fo�,LdWS: a Cut; break; remove & patch concrete -F xca�rate, backfill ,compact as needed Supply & install drain, .Wast& & vent piping install domestic grater piping a Insulate waster py1ng Supply & install (1)'water closet & (1) Urinal • Test: &;inspection .:.-Removal & replacement. of existing'�vaIls. .:wn NOTES: Wbrk,to be, done during normal business hou=rs ` m Quote: good for 30 days TOTAL .....:... ..... .................... $4,150.00 : Ken Norton T` dgeura�r Industrial, Th6. - _ : 05-17-'07 09;34 FROM-T350'- 208-887-8686 T-151 P002/002 F-273 2251 E. Land MetWiap, ID 83642 aa.eor.e�oo RHOUSTRI&LAnc_ �tKYoe.881.8686-=� wnw,aid�vmylndustric�com ' - 1"IZ.YJYMBING- _ 3085145 May 17,.2007 - kr- aeaenbeck Constructors -251 East Front St., Suite 110 l bse,1D 83702 �Phont: 336-9500 F 336-7444 ATYN: Brandon Byington - - SUB CT.- Meridian Water Facility l4os� Bibb Relocation Per RFI # 27 o Supply& install dOfinestic water piping &hangers t0 relocate hose Bibb _ + - _ Insulate additional water piping NOTES: - ® Work to be done during normal business hours - _ s Quote good for 30 days - 9 Includes permit . TOTAL.............................................................................................................$577.00 Thank you, - KC n Norton = Estimator Ridgeway Industrial, Inc. 05-17 '07 09:34 FROM-T350- ,�08-887-8686 T-151 P001/002 F-273 -- _ — _ _ 22511. Lanark — — rte• Meridian, IU 03642 " -M I WAIF Y08.@@7,6600 - H Ili�t�i .. + a � �' � � . _ FAX 209,881.0666 .e ® www.6idgemiyindustriol.tmn PLUMBING JOB 5145 May 17, 2®®7 Kriezenbeck Construct or$ - " - - 251 East Front St., SuAtt-110_ . _ Boise, ID 93702 = - Phone: 336-9500 Pax: 336-7444 - ATTN: Brandon ByiMgCQIa; _ - -S1UBJECT: Meridian Mater Facility Roof Brain Tenninations Per RTI # 14 WORK AS FOLLOWS: ®-Stapply & insull (2)'down spout nozzles on foof drain piping terminating 18" above grade ® Work to be done during normal business hours a Quote good for 30 days Includespermit Il'QTA�L ............................................................ ........::.::................:...............5644.60 Thank you, - Ken Norton Estimator _ Ridgeway Industrial, Inc.