Change Order No. 1 with Joslin Millwork, Inc. for Water Department Building (2)
CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 1 PROJECT NO. 06078 DATE: 09/13/07 EFFECTIVE DATE: CONTRACTOR: Joslin Millwork, Inc. ,PROJECT: Water Division Building The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: 1) Provide all labor and materials to install a laminate top at the pass through window. Reason for Change Order: Construction progress. Attachments: AIA Document G701/CMa - 1.992 Change Order -Construction Manager-Advisor Edition Submitted by Kreizenbeck Constructors CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ 25,950.00 Original Contract Times: Completion Net changes form previous Change Orders Net changes form previous Change Orders No._0_ to _0_ No._ to _ (calendar days) $0.00 None Contract Price Prior to this Change Order: Contract Times prior to this Change Order: (calendar days or date) $25,950.00 Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days or date) $368.00 Completion by Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $26,318.00 RECOMMENDED: (CONSTRUCTION MANAGER) ACCEPTED: (CONTRACTOR) See provided AlA signed change order See provided AlA signed change order By: By. Date: Date: APPROVED: ITY PU CHASING AGENT) ~~\\\\I~Illllltl ~ ~ h u COUNCIL APPROVAL /~~ , j " ~\ ,/ ' By: Keit tts `~~~ ~, Q~~ ~:`~' ~ ' ~~~ ~g • •~ ~ Date: /~ n •~ ~'~ tJ 7 ~ ~ ~t?O~ 1 '~, Dafe• .~, i~ ~~ ~~ APPROV (CITY) - ~ ATTE T: F -~i~ By: Mayor Tam y de Weerd = ~ ~"`~'-~-`~ By: Ci Clerk, Will Berg Jr. } Date: = G ~. c~,•~,~ ~ Die: ~~ D z~ ~ '11/1111 111111\\\ ~} __ ,, ~~ ® TN -_ Document G701/CMa -1992 Change Order -Construction Manager-Ad viser Edition PROJECT (Name and address): Meridian Water Depatttnent Building 06- 021 2235 Northwest 8th Street Meridian, Idaho 83642 TO CONTRACTOR (Name and address): Joslin Millwork, Inc. 6467 Supply Way Boise, Idaho 83716 ICR No. RCE-3248 Public Works License No.11192-B- 4(06200) CHANGE ORDER NUMBER: 001 INITIATION DATE: August 03, 2007 PROJECT NUMBERS: 06-021 /6400 CONTRACT DATE: February 20, 2007 CONTRACT FOR: General Construction OWNER: CONSTRUCTION MANAGER: ARCHITECT: CONTRACTOR: FIELD: OTHER: ^ THE CONTRACT IS CHANGED AS FOLLOWS: 1) Provide all labor and materials to install a laminate top at the pass through window. All work to be completed as per PR #1 as prepared by BRS Architects. $ 368.00 The original Contract Sum was E 25,950.00 Net change by previously authorized Change Orders b 0.00 The Contract Sum prior to this Change Order was E 25,950.00 The Contract Sum will be increased by this Change Order in the amount of S 368.00 The new Contract Sum including this Change Order will be E 26,318.00 The Contract Time will be unchanged by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. NOT VALID UNTIL SIGNED BY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR Kreizenbeck, LLC DBA Kreizenbeck Constructors CONSTRUCTION MANAGER (Firm name) 251 East Front Street, Suite 110, Boise, Idaho 83702 ADD BY (Signature) )~ E'1 Michael J. Berard 8~i1v3~Q~_ (Typed name) pATE:~ Joslin Millwork, Inc. CONTRACTOR (Firm name) 6467 Supply Way, Boise, Idaho 83716, ICR No. RCE-3248, Public Works License No.11192-B-4(06200) ADDRESS BY (Signature) [~ (Typed name) DATE: BRS Architects ARCHITECT (Firm name) 1010 S. Allante Street, Suite 100,.B~oise, ID 83709 ADD ~'Y~'-' ( rgnature) ~ ~ ~~ Clinton Yaka (Typed name) DATE: City of Meridian OWNER (Firm name) 660 East Watertower, Suite 200, Meridian, Idaho 83642 \~~~i~l~ a i~rr. C~(~u.-fl,6r C~ ~}-,,~ ~(,~ BY (Signature) mad-]bCatson (TYPed name) AIA Document G701/CMaTM -1882. Copyright ©1992 by The American Institute of Architects. All rights reserved. WARNIN~i) protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Documen may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This by AIA software at 18:17:47 on 08/06!2007 under Order No.1000280013_1 which expires on 1/17/2008, and is not for resale. User Notes: o ~i~ s . ~. `~'f~Zl'C~- n~ )o-t?~~' G~ ~ ss,.kd`O~ ~ y~ ~ ~~ it, ~+~~~.`~\\. trn n~~t as pr~uced ~~~~~ ~ ~rrrrrli nlli~~~~~ (405294579) n i ;~1-f~~)-t-p 6rC a~ ~~ v(~ ~` H.FrR-30-2007(h10FJ) 06; 17 Joslin 1~lillwork Inc. - -(FR:O2013 3.112 7772 P. 001/001 .- - _ - _ -• - . Custom Cahinet ~St MJllwrn~lc~ -:~_ . PFT (208) 342-SSSO - - -6~167 supply W;ty ~ _ -: 1.'AX (~bt;) :142-7772 , ...~ Foisc, TD 83716 ~ __ _ _ Ql..lOf~t101C1 - ~ ~ ~ - ~ ~ Dato 04/30/07 - To: Krelzenbeck Gonstrucrors, Inc. - 251 East Front Street, Suite 110 - - - -- - - Boise,- ID 83702 - - - PhOno (208) 336-9500 Fax (208) 336-7444 ~ _ ,. - Attention :Brandon l3yington ~ - Project Id #4188 Project Desc. Meridian'Water Department P.R.#1- =- ~ Ship Via :Our truck - Terms :Per Contract Documents P.O. Number n/a . Delivery Date : n!a - Salesperson : StevCt Joslin Idaho Contractor License # RGER-3248 - - - Public Works License #-11192-8-4(06200} ~ ~ - - We are pleased to quote the following Installed. - ~- - item ~ ~. Unit ` No Description ._ ~ ~ Qty Unit Price Prico - 1 Plastic Laminate Pass-Thru Counter -- 2 Standard Grade 3 x 8 1 ea. b8.80 62.33 ' 3 Wood Stock 3!4 4 x 8 Raw Straw Core 32 sq. ft. 1.19.. 40.36 _ ~ 4 _ 0'[. Admini5trativo _ - .5 hr. 65.80 ~ _ 32.90 5 02. Shop Drawings ~ _25 hr. 65.80 .16.45 6 03. Layout 8~ Measure .25 hr.. 65.80 16.45 ' - 7 04. Cut Out ~ .25 hr. ~ 47:36 11.84 8 07. Assembly ~ ' _5 hr. 47.38- 23.69 9 10. Plastic laminate & veneering - .5 hr. 47.38 23.fi9 10 Installation Per Hour- ~ 2.5 hr. 56.00 140.00 _ ~ TOTAL - - $3118.00 ~. Pleasa Nblf1- Pri S v f _ - G u r,Z~.$Xis . All material is guaranteed to be as specified. ~ . , All work to bo campleled in a workmanlike manner according to standard practlces_ - Labor and Materials are wan-anteed for ono yoar. _ . - / . ~ _ _ ~. - uOXi/ice Siyneluro