Loading...
HomeMy WebLinkAboutACHD Commentss ~~~~S '~ CHD ~ November 19, 2007 To: Bob Runyun Seagle Three, LLC 5999 W. State Street, Suite A Boise, Idaho 83703 Subject: Settlers Square Subdivision (MPP-07-024, MAZ-07-018) 870 W. Ustick Road NOV 19 2007 City Of Meridian City Clerk Office On 16 November 2007, the Ada County Highway District planning review staff acted on your application for the above referenced project. The attached report lists site-specific requirements, conditions of approval and street improvements, which are required. If you have any questions, please feel free to contact me at (208) 387-6187. Sincerely, Matt Edmond Planner II Right-of-Way & Development Services Ada County Highway District CC: Project file City of Meridian Treasure Valley Engineering, Inc. John S. Franden, President Rebecca W. Arnold, Vice President Sherry R. Huber, Commissioner Dave Bivens, Commissioner Carol A. McKee, Commissioner RECEI~TE~ Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us Right-of--Way & Development Services Department t y~~~~ ~ CHD ~ ProjectlFile: Settlers Square Subdivision (MPP-07-024, MAZ-07-018) This application is for preliminary plat annexation, and rezone of 10 acres for development as a mixed office-retail commercial subdivision. Lead Agency: Meridian City Site address: 870 W. Ustick Road Staff Approval: November 16, 2007 Applicant: Seagle Three, LLC --~ _ _ _ 5999 W. State Street, Suite A - Boise, Idaho 83703 Staff Contact: Matt Edmond i ~ ~ `~J C Phone: 387-6187 m E-mail: medmond(a~achd.ada.id.us ~- - ,a Tech Review: November 16, 2007 '~« ~ _oo, i ~~ ~ ~, >> ~, .~ - Application Information: ~i ~ ~ ` Acreage: 9.764 acres - ~' ~ ~~ ~ " ; '~~~ ,L ti,r.>- L-,-"~ i Current Zoning: RUT Ic'~--- ""'" ""-'" A. Findings of Fact i~' . ~_ a;; E ~~ ° ~~ ~~ _ Existing Conditions ~~'~' ~ 1. Site Information: The site currently has one single-family dwelling and outbuildings. 2. Descri tion of Adjacent Surroundin Area: Direction Land Use Zoning North Sin le-famil residential R-8 South Sin le-famil residential R-8 East Gas station, commercial C-N West Single-family residential RUT 3. Existing Roadway Improvements and Right-of-Way Adjacent To and Near the Site • Ustick Road is currently improved to 3 lanes with no curb, gutter, or sidewalk inside 50-feet of right-of-way abutting the site. Ustick Road received an overlay abutting the site in March of 2007. Venable Lane is currently improved to 31-feet of pavement inside 58-feet of right-of-way with vertical curb, gutter, and 7-foot attached sidewalk opposite the site and a drainage swale abutting the site • Buckstone Avenue is currently improved as a 34-foot street section with rolled curb, gutter, and 4-foot wide detached sidewalk inside 56-feet of right-of-way. Buckstone Avenue intersects the north property line of the site approximately 200-feet east of the site's northwest corner. 4. Existing Access: The site currently has one defined access point to Ustick Road, approximately 100-feet west of where Venable Lane intersects with Ustick Road. 1 Settlers Square Subdivision 5. Site History: The District has not previously reviewed any applications involving this property. 6. Adjacent Development: To the north, Woodburn Subdivision (47 buildable lots on 10 acres) is nearing completion. To the south, Crossfield Subdivision (246 buildable lots on 60 acres) is under construction. To the east, Cedar Springs Professional Center is nearing completion. Development Impacts 7.. Trip Generation: This development is estimated to generate 3,990 vehicle trips per day (245 vehicles per hour during PM peak hour traffic) based on the submitted traffic impact study. 8. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 9. Traffic Impact Study: A traffic impact study was required with this application. 10. Impacted Roadways: Roadway Frontage Functional Classification Traffic Count Level of Service* Speed Limit ' Principal 10,262 west of Better than 40 MPH Ustick Road 635 Arterial Meridian 4/7/2005 "C" ' Residential 2,339 north of Better than 25 MPH Venable Street 640 Collector Ustick 9/2007 "C" e B t 58' Local/Stub No data N/A 20 MPH ue Aven Tom. *Acceptable level of service for 2-lane minor artenai roadways is u ~ i4,uuu v ~ u~. 11. Capital Improvements Plan/Five Year Work Plan Ustick Road is currently scheduled in the Capital Improvements Plan to be widened to a 5-lane arterial between Linder and Meridian Roads in 11 to 20 years. The intersection of Ustick and Meridian Roads has gone into preliminary development for construction as a 6-lane (Ustick) by 4- lane (Meridian) signalized intersection in 2008. The intersection of Ustick and Linder Roads is currently scheduled in the Five Year Work Plan to be signalized in 2010. B. Findings for Consideration Traffic Impact Study Summary of Findings: • At full buildout the site will produce a total driveway volume of 3,990 vehicles per day with a PM peak hour loading of 245 vehicles per hour. • The proposed site access plan includes 1all-movement access onto Ustick Road plus a connection with Venable Lane, amid-section collector. • The Ustick intersection with Meridian Road now operates with moderate traffic congestion. The Ustick/Linder AWSC intersection is over capacity with LOS "F" conditions. This intersection is included in the ACRD CIP for reconstruction in 2008. • The proposed site access will conform to acceptable traffic capacity standards. The average queue for vehicles exiting the site will be less than 1 vehicle and the queue back-up extending north from Ustick Road will not block the site access. • The site access will not generate sufficient turning traffic to warrant aright-turn deceleration lane on Ustick Road. • Ustick Road will exceed the capacity of the existing 2-lane road section by 2015, and a S- lane improvement will be needed to accommodate the regional traffic growth as identified in the COMPASS Long Range Transportation Plan. 2 Settlers Square Subdivision Recommendations: • A future traffic signal will be needed at the Venable/Ustick intersection if the land south of Ustick Road on 8~' Avenue develops to a similar density to Settlers Square. • Venable Lane should be widened to a 40-foot wide section to accommodate a southbound left-turn lane. Staff Comments: • The signalization of Ustick and Linder has moved in the Five Year Work Plan from 2008 to 2010.. • Specialty Retail Center (ITE code 814) does not represent a mixture of retail and office. Trip generation may range from as low as 10 VTD per 1,000sf to over 100 VTD per 1,000sf depending on the specific commercial use. • Any additional access granted onto Ustick Road should be located as far from the Venable Lane intersection as possible, and should provide future cross-access for parcels to the west. 2. Ustick Road Right-of-Way: District policy requires 96-feet of right-of-way on arterial roadways (Figure 72- F1 B). This right-of-way allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks and bike lanes. Access: District policy 7207.8 states that direct access to arterials and collectors is normally restricted. The developer shall try to use combined access points. If the developer can show that the use of a combined access point to a collector or arterial street is impractical, the District may consider direct access points. Access points for proposed developments at intersections should be located as far from the intersection as practical, and in no case closer than as illustrated on Figure 72-F4, unless a waiver for the access point has been approved by the District Commission. Cut Moratorium: Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Applicant Proposal: The applicant has proposed to dedicate 48-feet of right-of-way from centerline and construct 5-foot concrete sidewalks 41-feet from centerline along Ustick Road abutting the site. Additionally, the applicant has proposed to construct Buckstone Avenue to access Ustick Road approximately 330-feet west of Venable Lane (measured centerline-to- centerline). Staff Recommendation: Due to the fact that Venable Lane is located at the half-mile and its intersection with Ustick Road is a potential candidate for future signalization, District staff recommends that the applicant's proposal be approved with the stipulation that the District may restrict Buckstone Avenue to a right-in/right-out access at some time in the future. Additionally, due to the recent resurfacing of Ustick Road, the applicant must contact the District's Utility Coordinator at 387-6258 to seek approval for any utility cuts on this roadway. 3. Venable Lane Right-of-Way: District policy requires 54-feet of right-of-way on industrial/commercial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 3-lane roadway with curb, gutter and 5-foot wide concrete sidewalks. AccesslOffsets: District policy 7204.11.6, requires local roadways to align or offset a minimum of 125-feet from another local roadway (measured centerline to centerline). Applicant Proposal: The applicant has proposed to complete Venable Way as a 40-foot street section with vertical curb, gutter, and 5-foot attached sidewalk inside 58-feet of right-of-way abutting the site. Additionally, the applicant has proposed to construct Cooper Lane to access Venable Lane so that it aligns with the private drive in Cedar Springs Professional Center on the east side of Venable Lane. 3 Settlers Square Subdivision Staff Recommendations: The applicant's proposal regarding Venable Lane meets District policy and should be approved with this application. 4. Buckstone Avenue Right-of-Way: District policy requires 54-feet of right-of-way on industrial/commercial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 3-lane roadway with curb, gutter and 5-foot wide concrete sidewalks. Islands: District policy 7202.7 and 7207.5 require islands to be constructed a minimum of 4-feet wide with a minimum area of 100-square feet and designed to safely channel traffic. The roadway on either side of the traffic island should maintain a minimum of a 21-foot street section. Applicant Proposal: The applicant has proposed to construct Buckstone Avenue as a private drive aisle north of Cooper Lane and a divided public commercial street south of Cooper Lane. The private drive aisle will be a 25-foot street section aligning with the stub street in Woodburn Subidivision to the north and will provide an easement for public cross access. The public portion of Buckstone Avenue will consist of 22-foot street sections without parking and 30-foot street sections with parking divided by a 7-foot wide island.. Tree Planter Policy: The District's Tree Planter Width Interim Policy prohibits all trees in planters less than 6-feet in width. In addition to prohibiting trees in planters less than 6-feet in width., the policy requires a minimum planter width of 6-feet for class II tress with the installation of root barriers on both sides of the planter strip or a minimum planter width of 8-feet without the installation of a root barrier. The policy also requires Class I and Class III trees to provide a minimum planter width of 10-feet. Staff Recommendation: The applicant should construct the north portion of Buckstone Avenue as a public street rather than a private drive aisle. District staff recommends a modification of policy to allow a 29-foot street section (measured back-of-curb to back-of-curb) in 42-feet of right-of-way due to the fact that this street segment will provide connectivity between the commercial development and Woodburn residential subdivision, and no on-street parking will be allowed. In the event that lots 1-6 are consolidated on the final plat, District staff recommends rescinding this requirement in favor of across-access easement to and from Woodburn subdivision. The applicant's proposal regarding the south portion of Buckstone Avenue meets District policy and should be approved with this application. The applicant must install root barriers when planting trees in any island less than 8-feet in width. The applicant should take note that the District may restrict Buckstone Avenue to a right-in/right-out access on Ustick at some time in the future. 5. Cooper Lane Right-of-Way: District policy requires 54-feet of right-of-way on industrial/commercial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 3-lane roadway with curb, gutter and 5-foot wide concrete sidewalks. Stub Streets: District policy 7203.5.1 states that the street design in a proposed development shall cause no undue hardship to adjoining property. An adequate and convenient access to adjoining property for use in future development may be required. If a street ends at the development boundary, it shall meet the requirements of sub section 7205, "non-continuous streets." District policy 7205.5 states that stub streets will be required to provide intra- neighborhood circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7204.5, 7204.6 and 7204.7, except a temporary cul- de-sac will not be required if the stub street has a length no greater than 150-feet. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." Applicant Proposal: The applicant has proposed to construct Cooper Lane as a minimum 42- foot street section inside 68-feet of right-of-way, with 9-foot wide parking aisles where parking is 4 Settlers Square Subdivision allowed. The applicant has proposed to terminate Cooper Lane at the west property line to allow for future stub street connection. Staff Recommendation: The applicant should provide a public turnaround easement in the driveway nearest Cooper Lane's western terminus. The rest of the applicant's proposal regarding Cooper Lane meets District policy and should be approved with this application. 6. Access 8~ Driveways Access Policy: District policy 7207.8 states that direct access to arterials and collectors is normally restricted. The developer shall try to use combined access points. If the developer can show that the use of a combined access point to a collector or arterial street is impractical, the District may consider direct access points. Access points for proposed developments at intersections should be located as far from the intersection as practical, and in no case closer than as illustrated on Figure 72-F4, unless a waiver for the access point has been approved by the District Commission. Driveway Offsets: District policy 72-F4 (1) and 72-F4 (2), requires driveways located on commercial/ industrial roadways to offset a controlled and/or uncontrolled intersection a minimum of 50-feet (measured near edge to near edge). Driveway Widths.: District policy 7207.9..3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 36-feet. Most commercial driveways will be constructed as curb-cut type facilities if located on local streets. Curb return type driveways with 15-foot radii will be required for driveways accessing collector and arterial roadways. Applicant Proposal: The applicant has proposed 4 direct lot access points onto Cooper Lane and 2 direct lot access points onto Buckstone Avenue, all offset at least 50-feet from the nearest intersection with either Ustick Road or Venable Lane. All driveways will be no wider than 36- feet. Staff Comment: The applicant's proposal regarding access and driveways meets District standards and should be approved with this application. Direct lot access onto Ustick Road (arterial) Venable Lane (collector) is prohibited, and should be noted on the final plat. 7. Tree Planters Tree Planter Policy: The District's Tree Planter Width Interim Policy prohibits all trees in planters less than 6-feet in width. In addition to prohibiting trees in planters less than 6-feet in width, the policy requires a minimum planter width of 6-feet for class II tress with the installation of root barriers on both sides of the planter strip or a minimum planter width of 8-feet without the installation of a root barrier. The policy also requires Class I and Class III trees to provide a minimum planter width of 10-feet. C. Site Specific Conditions of Approval 1. Dedicate 48-feet of right-of-way from the centerline of Ustick Road abutting the parcel. The right-of-way purchase and sale agreement and deed must be completed and signed by the applicant prior to scheduling the final plat for signature by the ACHD Commission or prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The District will purchase the right-of-way which is in addition to existing right-of-way from available Corridor Preservation Funds. 2. Do not make utility street cuts in Ustick Road abutting the site without approval in writing by the District. This section of road was paved in March 2007 and is subject to the 5-year cut moratorium. 3. Construct 5-foot concrete sidewalk at least 41-feet from the centerline of Ustick Road abutting the site. 5 Settlers Square Subdivision 4. Complete Venable Lane as a 40-foot street section with vertical curb, gutter, and 5-foot attached concrete sidewalk abutting the site. Connect sidewalk with existing improvements to the north. 5. Construct the north portion of Buckstone Avenue as a 29-foot street section (measured back-of- curb to back-of-curb) with vertical curb, gutter, and 5-foot attached concrete sidewalks inside 42-feet of right-of-way. In the event that lots 1-6 are consolidated on the final plat, the applicant shall provide, in lieu of this public street section, a public cross-access easement to connect the south portion of Buckstone Avenue with the stub street in Woodburn Subdivision to the north. 6. Construct the south portion of Buckstone Avenue as proposed with drive aisles 21-feet wide (measured back-of-curb to back-of-curb) and islands at least 4-feet wide where it is divided, and vertical curb., gutter, and 5-foot attached concrete sidewalks along both sides. Where parking aisles are located, construct 30-foot wide divided street sections. Construct Buckstone Avenue with vertical curb, gutter, and 5-foot attached concrete sidewalks. Buckstone Avenue shall intersect with Ustick Road no closer than 330-feet from Venable Lane (measured centerline-to- centerline). The District may restrict Buckstone Avenue to right-in/right-out at some time in the future. 7. Construct traffic islands with trees at least 6-feet wide with root barriers or 8-feet wide without. 8. Construct Cooper Lane as a 42-foot street section (with 9-foot parking aisles as proposed) with vertical curb., gutter and sidewalk aligning with the private drive in Cedar Springs Professional Center to the east and terminating as a stub street to the west. Install a sign at the west terminus of Cooper Lane stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." 9. Provide a temporary public turnaround easement in the driveway nearest Cooper Lane's east terminus, to expire when Cooper Lane is extended to the west. 10. Construct all commercial driveways onto Buckstone Avenue and Cooper Lane as proposed. Driveways must be no wider than 36-feet and paved their full width at least 30-feet into each site. If constructing curb return type driveways, 15-foot radii will be required. 11. Comply with all Standard Conditions of Approval. D. Standard Conditions of Approval 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. Private sewer or water systems are prohibited from being located within any ACRD roadway or right-of-way. 3. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. Comply with the District's Tree Planter Width Interim Policy. 6. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 7. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACRD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. g Settlers Square Subdivision 8. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 9. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 10. Payment of applicable road impact fees is required prior to building construction. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 11. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACRD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 12. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 13. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless awaiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. E. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. Attachments 7 Settlers Square Subdivision 1. Vicinity Map 2. Site Plan 3. Utility Coordinating Council 4. Development Process Checklist 5 Request for Reconsideration Guidelines 4~ ' C~L~ ] _ ~~. ~.:y ~, a °~ ~Lo;l - - ---~.,~~,.~1 _ ~ ~ ,i ~~ Pese ,~~ ~~~ ~l ~, ..,. ~ ~, „ ~ ~ a ,, ,~~. W I~ (~ ~~ ~ ,I I,~PPL~ PINE i' II ~ i ~~ ,~ (~ ~; ~, r. {~i ~. ~ m DPINE ~ ,, a ,~ ~, ~ '' ~ ' i' ' ~, ~ ~ , i' iJ ~ ii 'i ~ { ~ ~ ~!, ~~ - cK~'1 ~.. C~ fl ~ ~~ ~(i-~~~, m o.~ .~ ~& ~~ ~~ , sm~ey ~j f, . F f~ {. ~` I '~~~ ~~~~ ~, ~..~.~, {. l ~ ` f k ~ °, I ._ ~~,~~o l ~- g Settlers Square Subdivision USTI~(N ROAD g Settlers Square Subdivision Ada County Utility Coordinating Council Developer/Local Improvement District Right of Way Improvements Guideline Request Purpose: To develop the necessary avenue for proper notification to utilities of local highway and road improvements, to help the utilities in budgeting and to clarify the already existing process. 1) Notification: Within five (5) working days upon notification of required right of way improvements by Highway entities, developers shall provide written notification to the affected utility owners and the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to, project limits, scope of roadway improvements/project, anticipated construction dates, and any portions critical to the right of way improvements and coordination of utilities. 2) Plan Review: The developer shall provide the highway entities and all utility owners with preliminary project plans and schedule a plan review conference. Depending on the scale of utility improvements, a plan review conference may not be necessary, as determined by the utility owners. Conference notification shall also be sent to the UCC. During the review meeting the developer shall notify utilities of the status of right of way/easement acquisition necessary for their project. At the plan review conference each company shall have the right to appeal, adjust and/or negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter of review indicating the costs and time required for relocation of its facilities. Said letter of review is to be provided within thirty calendar days after the date of the plan review conference. 3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary plans. Utilities may request an updated plan review meeting if revisions are made in the preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days after receiving the revisions to review and comment thereon. 4) Final Notification: The developer will provide highway entities, utility owners and the UCC with final notification of its intent to proceed with right of way improvements and include the anticipated date work will commence. This notification shall indicate that the work to be performed shall be pursuant to final approved plans by the highway entity. The developer shall schedule a preconstruction meeting prior to right of way improvements. Utility relocation activity shall be completed within the times established during the preconstruction meeting, unless otherwise agreed upon. Notification to the Ada County UCC can be sent to: 50 S. Cole Rd. Boise 83707, or Visit iducc.com for a-mail notification information. 10 Settlers Square Subdivision Development Process Checklist Submit a development application to a Ciry or to the County The City or the County will transmit the development application to ACRD ®The ACRD Planning Review Division will receive the development application to review ®The Planning Review Division will do one of the following: ^Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time. ^Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ^Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ^For ALL development applications, including those receiving a "No Review" or "Comply With" letter: The applicant should submit two (2) sets of engineered plans directly to ACRD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACRD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. ^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) ^ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ^ Working in the ACRD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application' to ACRD Construction -Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ^ Sediment & Erosion Submittal • At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction -Subdivision to be reviewed and approved by the ACHD Drainage Division. ^ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ^ Final Approval from Development Services ACHD Construction -Subdivision must have received approval from Development Services prior to scheduling aPre-Con. 11 Settlers Square Subdivision Request for Reconsideration of Commission Action Request for Reconsideration of Commission Action: A Commissioner, a member of ACRD staff or any other person objecting to any final action taken by the Commission may request reconsideration of that action, provided the request is not for a reconsideration of an action previously requested to be reconsidered, an action whose provisions have been partly and materially carried out, or an action that has created a contractual relationship with third parties. a. Only a Commission member who voted with the prevailing side can move for reconsideration, but the motion may be seconded by any Commissioner and is voted on by all Commissioners present. If a motion to reconsider is made and seconded it is subject to a motion to postpone to a certain time. b. The request must be in writing and delivered to the Secretary of the Highway District no later than 3:00 p.m. on the day prior to the Commission's next scheduled regular meeting following the meeting at which the action to be reconsidered was taken. Upon receipt of the request, the Secretary shall cause the same to be placed on the agenda for that next scheduled regular Commission meeting. c. The request for reconsideration must be supported by written documentation setting forth new facts and information not presented at the earlier meeting, or a changed situation that has developed since the taking of the earlier vote, or information establishing an error of fact or law in the earlier action. The request may also be supported by oral testimony at the meeting. d. If a motion to reconsider passes, the effect is the original matter is in the exact position it occupied the moment before it was voted on originally. It will normally be returned to ACHD staff for further review. The Commission may set the date of the meeting at which the matter is to be returned. The Commission shall only take action on the original matter at a meeting where the agenda notice so provides. e. At the meeting where the original matter is again on the agenda for Commission action, interested persons and ACRD staff may present such written and oral testimony as the President of the Commission determines to be appropriate, and the Commission may take any action the majority of the Commission deems advisable. f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover administrative costs, as established by the Commission. 12 Settlers Square Subdivision