Loading...
HomeMy WebLinkAboutChange Order No. 2 with NW Electric for Water Division BuildingRECEIVED Memo To: Will Berg; Tara Green From: Max Jensen, Engineering Technician CC: Len Grady, P.E., City Engineer Clint Dolsby, P.E., Assistant City Engineer Kyle Radek, P.E., Assistant City Engineer Rick Clinton, Water Department Superintendent Date: 11 /27/2007 Re: Proposed Agenda Item for December 4, 2007 City Council Meeting NOV 2 7 2007 City Of Meridian City Clerk Office The Public Works Department respectfully requests the following item be placed on the December 4, 2007 City Council agenda, under Consent Agenda, for Council's consideration: Change Order No. 2 for the Water Division Building proiect (construction -Northwest Electrical). Additional electrical work is required for the completion of the new Water Division Building. This change order consists of the following work and amounts to 0.03% of the construction contract: followingwork pertaining to SCADA and electrical modifications made by to the buildings original responses to Request for Information from the design architects, BRS • Provide additional labor and materials to install raceways and rough-in for SCADA equipment. • Provide additional labor and materials for electrical modifications by BRS (Design Architects). Kreizenbeck Constructors (The City of Meridians' project construction managers) prepared and submitted the change order. Recommended Council Action: The Public Works Department recommends that City Council approves Change Order No. 2 for the Water Division Building project (construction -Northwest Electrical) for $9,349.00 and authorize the Mayor to sign it. Thank you for your consideration. Please contact me if you have any questions regarding this item. From the desk of... Max Jensen Engineering Technician Meridian Public Works Department 660 E. Watertower, Suite 200 Meridian, Idaho 83642 Phone: (208) 898-5500 Fax: (208) 898-9551 jensenm@meridianciry.org • Page 1 CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 2 PROJECT NO. 0607a DATE: 11 /27107 EFFECTIVE DATE: CONTRACTOR: .Northwest Electrical PROJECT: Water Division Buildin Plans. Description: 1) Provide all labor and materials to install raceways and rough-in for SCADA antennas per ASI #10 as prepared by BRS. (Add $1,725:00) 2) Provide all labor and materials to relocate fire bell to the location required per the Fire Marshall. (Add $1,750.00) 3) Provide all labor and materials to install electrical connection to CU #8, which was relocated per BRS Architects response to RFI #59. (Add $1,393.00) 4) Provide all labor and materials to install additional raceways and rough-in for SCADA antennas per BRS Architects reponse to RFI #69B. (Add $3,761.000) 5) Provide all labor and materials to replace existing receptacles with TVSS receptacles in Room 119 as per BRS Architects reponse to RFI #72. (Add $720.000) Reason for Change Order: Construction progress. Attachments: AIA Document G701/CMa - 1992 Change Order -Construction Manager-Advisor Edition Submitted by Kreizenbeck Constructors CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ 173,824.00 .Original Contract Times: Completion .Net changes from previous Change Orders Net changes form previous Change Orders No._0_ to _1_ No._ to _ (calendar days) $5,458.00 None .Contract Price Prior to this Change Order: Contract Times prior to this Change Order: (calendar days or date) $179,282.00 Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days or date) $9,349.00 Completion by Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) .$188,631.00 RECOMMENDED: (CONSTRUCTION MANAGER) ACCEPTED: (CONTRACTOR) See provided AIA signed change order See provided AIA signed change order By: By: Date: Date: APPROVED: (CITY PURCHASING AGENT) COUNCIL APPROVAL By: Keith Watts .Date: Date: APPROVED: (CITY) - ATTEST: By: Mayor Tammy de Weerd By: City Clerk, Will Berg Jr. Date: Date: