October 25, 2007
To: Kastera Development -Wayne Forrey
15711 State HWY 55
Boise, I D 83714
Subject: Cavanaugh Subdivision
M RZ-07-014/M C U P-07-017/M P P-07-015
s/e/c of State Highway 69 & East Victory Road
John S. Franden, President
Rebecca W. Amold, Vice President
Sherry R. Huber, Commissioner
Dave Bivens, Commissioner
Carol A. McKee, Commissioner
OC' 2 6 X007
i' can ,e~t:~Il.;~i,;e;
,`~r'pES'~q~SfS,.
On October 24, 2007, the Ada County Highway District Commission acted on your application for
the above referenced project. The attached report lists site-specific requirements, conditions of
approval and street improvements, which are required.
If you have any questions, please feel free to contact me at (208) 387-6178.
Sincerely,
Mindy Walla e
Planner III
Right-of-Way & Development Services
Ada County Highway District
CC: Project file, Utilities
The City of Meridian,
JUB Engineers
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us
~ ~
~~` ~~
liomrwv'~`uL'~o s'r~it^~GG
Project/File:
Lead Agency:
Site address:
Commission
Hearing:
Consent Agenda
Commission
Approval:
Applicant:
Representative:
Right-of-Way & Development Department
Cavanaugh Subdivision/MRZ-07-014/MCUP-07-017/MPP-07-015
City of Meridian
s/e/c of State Highway 69 & East Victory Road.
October 24, 2007 at 6:OOp.m.
October 24, 2007
Kastera Development -Wayne Forrey
15711 State HWY 55
Boise, ID 83714
Same as Above
Staff Contact: Mindy Wallace
Phone: 387-6178
E-mail: mwallaceCa~achd.ada.id.us
Tech Review: October 19, 2007
Application Information:
Acreage:
Current Zoning:
Proposed Zoning:
Residential Units:
Commercial lots:
School:
Civic/Social Hall:
Open Space:
177
TN-R, C-N, & R-8
C-N, TN-C, TN-R, R-8
548
13
1
1
31.48 acres
A. Findings of Fact
Existing Conditions
1. Site Information: There is an existing single-family residence on the site. The balance of the site
is utilized for agricultural purposes.
1 Cavanaugh Subdivision
2. Description of Adjacent Surrounding Area:
Direction Land Use Zonin
North Residential (Observation Point) &
Commercial Double D & Nurse C-G, R-4 &
RUT
South Undeveloped (Future Reflection Ridge 8~
ravel it RUT
East Residential R-8
West Residential R-6
3. Existing Roadway Improvements and Right-of-Way Adjacent To and Near the Site:
Victory Road currently has 2 traffic lanes, and no curb gutter or sidewalk
abutting the site. There are three lanes on Victory Road at its intersection
with Meridian Road (SH 69), and there is curb, gutter, and detached concrete
sidewalk abutting the Victory Greens Nursery site. There is approximately
75-feet of right-of--way existing for Victory Road.
Meridian Road (SH 69) currently has 4 traffic lanes, a center turn lane, and
no curb, gutter, or sidewalk abutting the site. Meridian Road is under the
jurisdiction of the Idaho Transportation Department.
4. .Existing Access: There is an existing access on Victory Road to serve the existing home.
5. Site History: ACRD previously reviewed this site as Tanana Valley Subdivision in April
2006.
Development Impacts
6. Trip Generation: This development is estimated to 12,975 additional vehicle trips per
day based on the submitted traffic impact study.
7. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any
building permits. The assessed impact fee will be based on the impact fee
ordinance that is in effect at that time.
8. Impacted Roadways:
Roadway Frontage Functional
Classification Traffic Count Level of
Service* Speed
Limit
Victory Road 3,203' Minor Arterial 6,495 east of Better than 45 MPH
Meridian on 4/24/07 "C"
Meridian Road 2,368' Principal Arterial 30,018 north of Better than 55 MPH
(SH 69) Victory on 6/1/07 "C"
*Acceptable level of service for atwo-lane minor arterial roadway is "D" (14,000 ADT).
*Acceptable level of service for afive-lane principal arterial roadway is "E" (37,000 ADT).
9. Capital Improvements Plan/Five Year Work Program
There are currently no roadways, bridges or intersections in the general vicinity of the project that
are currently in the Five Year Work Program or the Districts Capital Improvement Plan (CIP).
2 Cavanaugh Subdivision
B. Findings for Consideration
Traffic Impact Study
The applicant retained Thompson Engineers to prepare a traffic impact study. Below are the
principal findings, conclusions, and recommendations of that study.
The site will generate 12,975 new trips per day. Of these, 658 trips will occur during the AM Peak
hour and 753 trips will occur during the PM Peak hour.
The intersection at Rumple Lane/Harris Street and Meridian Road will fail to operate at an
acceptable LOS under background PM peak hour traffic conditions. By expanding this
intersection to provide left turn lanes at the west bound and eastbound approaches, and
installing a traffic signal, this intersection can function at an acceptable LOS through the
total PM peak hour traffic conditions in 2012. Previous traffic studies have identified this
intersection as an intersection for mitigation by year 2011 due to other development. This
intersection meets signal warrants 1, 2, and 3 under background PM peak hour traffic
conditions.
• Based on ACRD turn warrant standards, a southbound right turn lane is warranted on
Meridian Road at the intersection with Harris Street under background PM peak hour traffic
conditions in 2012. If a traffic signal is installed at this intersection, turn warrants may
change.
• The intersection at Meridian Road and Victory Road is anticipated to operate near capacity
under total PM peak hour traffic conditions. By coordinating signals on Meridian Road, this
intersection will operate at LOS D through total PM peak hour traffic conditions in 2012.
The intersection at Victory Road and Standing Timber Avenue will require a traffic signal to
function at an acceptable LOS under total PM peak hour traffic conditions. By expanding
the intersection, constructing left turn lanes at every approach, and by installing a traffic
signal, this intersection will function at an acceptable LOS through total PM peak hour traffic
conditions in 2012. This intersection meets signal warrants 1, 2, and 3 undertotal PM peak
hour traffic conditions in 2012.
• The proposed access on Victory Road will require a center left turn lane on the Victory Road
to function at an acceptable LOS under total PM peak hour traffic conditions.
• A northbound right turn lane is warranted on Meridian Road at the intersection with Rumple
Lane under total PM peak hour conditions. If a traffic signal is installed at this intersection ,
turn warrants may change.
• Curb, gutter, and sidewalk are recommended along Victory Road and the internal streets
and stub roads of the development to accommodate pedestrian and school children traffic
and provide connectivity to future developments.
Staff Comment/Recommendations: Traffic impact study comments are provided by District
Traffic Services department.
• There are several streets within the subdivision that are quite long and could create
speeding issues.
3 Cavanaugh Subdivision
• The consultant has produced a trip capture percentage with no basis or documentation to
support it. The consultant will need to provide the appropriate documentation to support the
trip capture percentage or revise the TIS to reflect a new percentage of trip capture with
supporting documentation.
Staff is not in supportive of a traffic signal at the intersection of VictorylStanding
Timber at this time. The delay at the intersection is only slightly over LOS F (62.1
seconds). LOS F is 50 seconds. The distance from SH-69 intersection is 1900-feet. The
location could potentially increase cut through traffic from SH-69. Additionally, the TIS
included traffic counts taken while Overland Road was under construction. The District may
consider this location for a signal in the future.
2. Meridian Road (SH 69)
Meridian Road is under the jurisdiction of the Idaho Transportation Department. The City of
Meridian, the applicant and ITD should work together to determine if additional right-of-way or
improvements are necessary on Meridian Road (SH 69).
The applicant is proposing an access on Meridian Road at the half-mile in alignment with Harris
Street on the west side of the roadway.
3. Victory Road
Street Section and Right-of-Way Policy: District policy requires 96-feet of right-of-way on arterial
roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 5-lane roadway with
curb, gutter, 5-foot concrete detached sidewalks and bike lanes.
Sidewalk Policy: District policy requires 7-foot wide attached (or 5-foot detached) concrete
sidewalk on all collector roadways and arterial roadways (7204.7.2).
Staff CommenflRecommendation: The applicant will be required to dedicate a total of 48-feet of
right-of-way from the centerline of Victory Road (or 38-feet from centerline with the sidewalk in an
easement) abutting the parcel by means of a warranty deed. The right-of-way purchase and sale
agreement and deed must be completed and signed by the applicant prior to scheduling the final
plat for signature by the ACHD Commission or prior to issuance of a building permit (or other
required permits), whichever occurs first. Allow up to 30 business days to process the right-of--way
dedication after receipt of all requested material. The owner will be paid the fair market value of the
right-of--way dedicated which is an addition to existing ACRD right-of--way.
The applicant will be required to construct a 5-foot detached concrete sidewalk abutting the site on
Victory Road located a minimum of 41-feet from the centerline of the roadway.
The District recommends that the applicant construct a 5-foot concrete sidewalk across the two out-
parcels along Victory Road on either side of the proposed school site. This sidewalk should either
be constructed within the existing right-of-way or within an easement provided by the property
owners.
The applicant will be required to construct an eastbound right turn lane and a westbound left turn
lane on Victory Road into the site at the intersection with Standing Timber Way. The applicant
should be required to dedicate the additional right-of-way necessary for the turn lanes without
compensation. The widening of Victory Road for the auxiliary turn lanes may necessitate the
widening of the bridge west of the proposed entrance road. If the bridge widening is necessary to
construct the pavement tapers required for the turn lanes the applicant shall be required to design
and construct the bridge widening at that time. Additionally, the applicant will be required to
construct a left turn lane on Victory Road at the commercial site entrance (S. Enter Way).
4 Cavanaugh Subdivision
Due to the required eastbound right-turn lane necessary to serve the development and the need to
accommodate drainage, the applicant may need to dedicate additional right-of-way and construct
additional street improvements abutting the right-turn lane. If the applicant is unable to fit a
minimum 8-foot wide barrow ditch and 3-foot wide gravel shoulder between the edge of pavement
and the face of sidewalk due to right-of-way constraints, then the applicant may need to construct
vertical curb, gutter, and sidewalk abutting the eastbound right turn lane. Or as an alternative, the
applicant may need to move the sidewalk back and dedicate additional right-of-way to allow for the
construction of a barrow ditch wide enough to accommodate the drainage. An easement will need
to be provided for any segment of the sidewalk located outside of the right-of-way. Coordinate the
design of the drainage facility with District Design Review staff.
4. Commercial Entry Roadways
Right-of-Way and Street Section Policy: District policy requires 54-feet of right-of-way on
industrial/commercial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a
3-lane roadway with curb, gutter and 5-foot wide concrete sidewalks.
Roundabout Policy: The roundabout should be designed with 21-foot street sections on either
side of the center island. The applicant will be required to dedicate sufficient right-of-way on either
side of an island. Coordinate the size and design of the roundabout with traffic services staff.
Applicant's Proposal: The applicant is proposing to construct one commercial entry road, S.
Enter Way, (intersecting Victory) as a 40-foot street section with vertical curb, gutter, and 5-foot
attached concrete sidewalk within 54-feet of right-of-way. S. Enter Way is proposed to be located
approximately 670-feet (measured property line to centerline) east of Meridian Road. The
applicant has proposed to construct roundabout a on each of the main commercial roadways. The
first roundabout, located on S. Enter Way, is proposed to be located approximately 250-feet south
of the north property line.
Staff Comment/Recommendation: The applicant's proposal for S. Enter Way meets District
policy. Coordinate the ultimate location and design of the roundabout with District Traffic Services
staff.
5. Internal Public Street (Commercial)
Commercial Street Section and Right-of-way Policy: District policy requires 54-feet of right-of-
way on industrial/commercial roadways (Figure 72-F1 B). This right-of-way allows for the
construction of a 3-lane roadway with curb, gutter and 5-foot wide concrete sidewalks.
Local Street Section and Right-of-way Policy: District policy 7204.4.2 states, "developments
with any buildable lot that is less that 1-acre in size will typically provide streets having a minimum
pavement width of 32-feet with curb, gutter and sidewalks. The total street width shall be 36-feet
from back-of-curb to back-of-curb. Variations of this width may be allowed, depending on traffic
volumes forecast to be generated by the development. Concrete sidewalks shall be a minimum of
5-feet in width unless they are separated from the curb 5-feet or more in which case the sidewalk
shall be a minimum of 4-feet in width.
Diagonal Parking policy: District policy 5104.3.5 requirements for consideration of diagonal on-
street parking is that the parking is common in the area, existing activities have not feasible
possibility of accommodating demand by obtaining adequate parking by off-street parking and a
parallel curb parking, a hold harmless agreement is prepared and executed by the proponent of the
parking and indicated that the diagonal parking may be required to be removed at the discretion of
the Ada County Highway District.
5 Cavanaugh Subdivision
Design Guidelines 45 Degree Parking
Minimum
Street Type Typical Buffer* Stall Dimension
Lane Dimension Centerline or
Width Lane Line to
Curb Face
Arterial 12' 15-20' 15' 42' - 47'
Collector 11' 10-15' 15' 36 - 41'
Local 10' 5-10' 15' 30 - 35'
*Distance based on speed, volume, and other general characteristics of street. Add additional 5-
feet to dimensions if bike lane is needed.
Applicant's Proposal: The applicant has proposed to construct the internal commercial roadway
as follows:
• S. Entry Way, E. View Water St, and S. Thisa Way, and E. Boardwalk Row between Thisa
Way and Standing Timber Way are proposed to be constructed as a 46-foot street section
with vertical curb, gutter, and 5-foot attached sidewalk within 54-feet of right-of-way.
• E. Summer Walk Way, is proposed to be constructed a 36-foot street section with vertical
curb, gutter, and 5-foot attached sidewalk within 50-feet of right-of-way.
• E. Boardwalk Row from S. Enter Way east approximately 250-feet is proposed to be
constructed with 11.5-foot travel lanes, 19-foot diagonal parking lanes, vertical curb, gutter
and concrete sidewalk within 75-feet of right-of--way.
• E. Boardwalk Row from S. Thisa Way west approximately 180-feet is proposed to be
construct with 11.5-foot travel lanes, 19-foot diagonal parking lanes, vertical curb, gutter,
and concrete sidewalk within 75-feet of right-of-way.
• The remainder of E. Boardwalk Row is proposed to be constructed with 13-foot travel lanes,
20-foot perpendicular parking, vertical curb, gutter, and 5-foot concrete sidewalk within 119-
feet of right-of-way.
Staff Comment/Recommendation: The applicant's proposals meet District policy with the
exception of the proposed street section on E. Boardwalk Row, which includes the perpendicular
parking. Staff is not supportive of the perpendicular parking in this location. The applicant can
either construct this segment of E. Boardwalk Row with diagonal parking similar to what has been
proposed on the remainder of the roadway, or eliminate the on street parking in that location. The
diagonal parking will need to meet the District's 45 Degree parking requirements.
6. Driveways
Access Policy: District policy 7207.8 states that direct access to arterials and collectors is
normally restricted. The developer shall try to use combined access points. If the developer can
show that the use of a combined access point to a collector or arterial street is impractical, the
District may consider direct access points. Access points for proposed developments at
intersections should be located as far from the intersection as practical, and in no case closer than
as illustrated on Figure 72-F4, unless a waiver for the access point has been approved by the
District Commission.
6 Cavanaugh Subdivision
Driveway Location Policy: District policy 72-F4 (1) and 72-F4 (2), requires driveways located on
commercial/industrial roadways to offset a controlled and/or uncontrolled intersection a minimum of
50-feet (measured near edge to near edge).
Driveway Paving Policy: Graveled driveways abutting public streets create maintenance
problems due to gravel being tracked onto the roadway. In accordance with District policy,
7207.9.1, the applicant should be required to pave the driveway its full width and at least 30-feet
into the site beyond the edge of pavement of the roadway and install pavement tapers with 15-foot
radii abutting the existing roadway edge.
Driveway Width Policy: District policy 7207.9.3 restricts commercial driveways with daily traffic
volumes over 1,000 vehicles to a maximum width of 36-feet. Most commercial driveways will be
constructed as curb-cut type facilities if located on local streets. Curb return type driveways with 15-
foot radii will be required for driveways accessing collector and arterial roadways.
Applicant's Proposal: The applicant has proposed to construct one right-in ONLY driveway to
intersect Victory Road, located approximately 1,250-feet (measured property line to near edge)
east of Meridian Road. This driveway will provide access to a commercial drive aisle. The
applicant has proposed several driveways located off the proposed internal commercial roadways
to serve the proposed commercial development. The first driveways are located off of S. Entry Way
and the commercial driveway are approximately 100-feet south of Victory Road.
Staff Comment/Recommendation: The applicant's proposal meets District Policy. The applicant
will be required to coordinate the exact location, design, and signage for the right-in ONLY driveway
with District Traffic Services staff. The applicant will be required to pave the driveways there full
width and at least 30-feet into the site beyond the edge of pavement of the roadway and install
pavement tapers with 15-foot radii abutting the existing roadway edge. Commercial driveways are
restricted to a maximum width of 36-feet.
7. Private Streets/Commercial Drive Aisles
Private Street Policy: District policy 7205.6, other jurisdictions in Ada County establish the
requirements for private streets. The District retains authority and will review the proposed
intersection of a private and public street for compliance with District intersection policies and
standards.
Applicant's proposal: The applicant has proposed one private street/commercial drive aisle
(originally Thisa Way) to be constructed within the development. The roadway would intersect
Victory Road as a right-in ONLY driveway located approximately 1,250-feet east of Meridian Road.
This private drive aisle continues south approximately 450-feet where it intersects a roundabout.
Thisa Way then continues south of the roundabout as a public commercial roadway.
Staff Comment/Recommendation: If the City of Meridian approves the private road, the applicant
shall be required to pave the private roadway a minimum of 20 to 24-feet wide and at least 30-feet
into the site beyond the edge of pavement of Victory Road and install pavement tapers with 15-foot
curb radii abutting the existing roadway edge.
Street name and stop signs are required for the private road. The signs may be ordered through
the District. Verification of the correct, approved name of the road is required.
ACHD does not make any assurances that the private road, which is a part of this application, will
be accepted as a public road if such a request is made in the future. Substantial redesign and
reconstruction costs may be necessary in order to qualify this road for public ownership and
maintenance.
7 Cavanaugh Subdivision
The following requirements must be met if the applicant wishes to dedicate the roadway to ACRD:
Dedicate a minimum of 50-feet of right-of--way for the road.
Construct the roadway to the minimum ACRD requirements.
Construct a stub street to the surrounding parcels.
s. Entry Roads (Residential Collector)
Street Section & Right-of-Way Policy: District policy 72-F1A, 7202.3.2 and 7202.3.5, requires
that residential collectors be constructed as 36-foot street sections with curb, gutter and 5-foot wide
concrete sidewalks with no front-on housing. The access restrictions for these street segments
should be stated on the final plat. Unless otherwise noted, parking should be prohibited on these
street segments. Coordinate the signage Program with District staff.
Island Policy: District policy 7202.7 and 7207.5 require islands to be constructed a minimum of 4-
feet wide with a minimum area of 100-square feet and designed to safely channel traffic. The
roadway on either side of the traffic island should maintain a minimum of a 21-foot street section.
The design should be reviewed and approved by ACHD's Development staff.
Applicant Proposal: The applicant is proposing to construct the entrance road, Standing Timber
Way (intersecting Victory) as a residential collector from its intersection with Victory through the site
to the south property line crossing the Ridenbaugh Canal. The street is proposed as a boulevard
style with a 27-foot wide island and 21-foot street sections on each side of the island within 75-feet
of right-of-way. The applicant has proposed 5-foot wide detached concrete sidewalks along the
residential collector located outside of the right-of-way.
The applicant is proposing the entrance road, Harris Street (intersecting Meridian Road), as
residential collector. The applicant is proposing the entrance road, Harris Street (intersecting
Meridian Road), as residential collector. This street is proposed to be a 33-foot street section with
no front-on housing.
Staff Comment/Recommendation: The applicant's proposal for Standing Timber Way meets
District policy. The applicant will be required to re-design the center island to not exceed 12-feet in
width at the intersection of Standing Timber Way & Victory and to allow for simultaneous left and
right turns (eastbound and westbound) on Standing Timber Way. Breaks in the center landscape
islands may be needed to allow left and right turns where additional access is needed. Adequate
site distance will need to be maintained at the breaks to allow safe turn movements.
Harris Street will be required to be constructed as a standard residential collector with a 36-foot
street section from its intersection with Meridian Road to its intersection with the stub street being
extended from Reflection Ridge (Standing Timber Way). The 36-foot street section would include
vertical curb, gutter, and sidewalk on the north side of the roadway and a gravel shoulder and
barrow ditch on the south. The 36-foot street section is needed at the intersection of Harris Street
and Meridian Road to allow simultaneous left and right turns out of the development. (See Finding
#13 and #14 below).
9. Internal Public Streets (Residential)
Street Sections and Right-of-Way Policy: District policy 72-F1A, allows local residential public
roads with a 33-foot street section with parking on both sides of the roadway, if the amount of
vehicle trips per day on the street does not exceed 1,000 and the appropriate fire department
reviews and approves the street section. The proposed density of development that will utilize the
internal local residential streets is anticipated to generate less than 1,000 vehicle trips per day.
8 Cavanaugh Subdivision
Applicant Proposal: The applicant is proposing to construct the internal local streets as 33-foot
street sections with rolled curb, gutter, 4-foot detached concrete sidewalks and 5-foot planter strips
within 50-feet of right-of-way.
Staff Comment/Recommendation: The applicant's proposal meets District policy with the
exception of the 4-foot sidewalks. The applicant will be required to construct 5-foot detached
sidewalks. The applicant will be required to receive written approval from the Meridian Fire
Department for the reduced street section. The applicant will not be required to construct Illuminate
Street, which is proposed to run in between Intelligence Street and Infinity Street. These roadways
will be adequately served by the extension of Mesa Way south of Victory Road.
10. Alleys
Alley Policy: District policy 7204.10.1 requires the minimum right-of-way width for new alleys to be
16-feet if: the alley is abutted by residential uses and zoning on both sides; and building setbacks
required by the land use agency having jurisdiction provide sufficient space for the safe backing of
vehicles into the alley; and 20-feet in all other situations. Dedication of clear title to the right-of-way
and the improvement of the right-of-way, and acceptance of the improvement by the District as
meeting its construction standards, are required for all alleys contained in a proposed development.
Access Policy: Access is allowed to and from a fully improved alley (District policy 7204.10.2).
Parking shall be designed so the minimum clear distance from the back of the parking stall to the
opposite side of the alley is 22-feet for perpendicular parking. An access to an alley shall be located
a minimum of 25-feet from the nearest public street.
Intersection Policy: District Policy 7204.10.3 states a minimum of back-of-curb radius of 15-feet is
required at all alley intersections.
Design Policy: District policy 7202.6 states that alleys shall connect to a public street at each end
and shall not terminate in dead-ends. Alleys with curves are not allowed without specific District
approval taken on good cause shown. Curves shall have a minimum inside radius of 26-feet.
Applicant Proposal: The applicant is proposing to construct two 20-foot alleys between S. Koluna
Avenue and S. Kamivar Avenue in phase one of the development and two 16-foot alleys between
blocks 24 and 25 and blocks 26 and 27 in the commercial section of the development. All of the
alleys are straight and intersect a public street at both ends.
Staff Comment/Recommendation: The applicant's proposal meets District policy and should be
approved with this application.
11. Entry Road (Local Residential in alignment with Mesa Way)
Policy: District policy 7203.4.2 states "if a proposed development abuts an unpaved street or
streets the developer shall construct one-half of the full street improvements, including curb, gutter
and concrete sidewalk plus additional pavement widening beyond the centerline established for the
street to provide a minimum 24-feet wide paved surface. A 3-foot wide gravel shoulder and a
drainage swale sized to accommodate the roadway storm runoff shall be constructed on the
unimproved side. This street section shall be constructed within a minimum 40-foot right-of--way.
Applicant's Proposal: The applicant has proposed to construct a half street section in alignment
with Mesa Way on the south side of Victory Road. This half street will provide access to the school
site and additional access for residents of the development.
Staff Comment/Recommendation: The applicant's proposal meets District policy. The proposed
half street will provide adequate access to the school site while preserving the functionality and
9 Cavanaugh Subdivision
safety of the internal residential streets. This roadway will be required to be constructed as one-half
of a 36-foot street section with vertical curb, gutter, and 5-foot concrete sidewalk on the west side, a
minimum of 24-feet of pavement, and a 3-foot gravel shoulder and adequately sized barrow ditch
on the east side of the roadway. This road will be required to be within a minimum 40-foot of right-
of-way.
If the applicant cannot achieve an alignment with Mesa Way on the north side of the roadway, the
applicant should re-design this portion of the site to provide another local street access for the
school site. The street should meet District intersection offset policies. In addition, the half-street is
proposed to located adjacent to the Grange property, and District staff does not believe that the
parcel would need this type of local street for re-development and access purposes. The Grange
property already has a stub street from Tuscany Village and one stub street from this site.
12. Roadway Offsets
Access Policy: District policy 7207.8 states that direct access to arterials and collectors is
normally restricted. The developer shall try to use combined access points. If the developer can
show that the use of a combined access point to a collector or arterial street is impractical, the
District may consider direct access points. Access points for proposed developments at
intersections should be located as far from the intersection as practical, and in no case closer than
as illustrated on Figure 72-F4, unless a waiver for the access point has been approved by the
District Commission.
Access Policy: District policy 7207.8 states that direct access to arterials and collectors is
normally restricted. The developer shall try to use combined access points. If the developer can
show that the use of a combined access point to a collector or arterial street is impractical, the
District may consider direct access points. Access points for proposed developments at
intersections should be located as far from the intersection as practical, and in no case closer than
as illustrated on Figure 72-F4, unless a waiver for the access point has been approved by the
District Commission.
Offset Policy: District policy 7204.11.6, requires local roadways to align or offset a minimum of
300-feet from an arterial roadway (measured centerline to centerline).
District policy 7204.11.6, requires local roadways to align or offset a minimum of 150-feet from a
residential collector roadway (measured centerline to centerline).
District policy 7204.11.6, requires local roadways to align or offset a minimum of 125-feet from
another local roadway (measured centerline to centerline).
Applicant Proposal: The applicant is proposing to construct the main entrance roadway, Standing
Timber Way intersecting Victory Road, in alignment with Standing Timber Way (Observation Point
Subdivision) on the north side of Victory Road. In addition the applicant has proposed one
commercial roadways to intersect Victory Road. S. Enter Way is proposed to be located
approximately 670-feet (measured property line to centerline) east of Meridian Road. The applicant
has proposed to construct ahalf-street section in alignment with Mesa Way on the north side of
Victory Road at the east property line.
Staff CommenURecommendation: The applicant's proposals meet for Standing Timber Way, S.
Enter Way, and S. Mesa Way meet District Policy, as they align with previously approved roadways
on the north side of Victory Road. With the recent approval of Emerson Park Subdivision, the
location of Emerson Street was approved on the north side of Victory Road. Based on the
submitted preliminary plats S. Enter Way and Emerson Street should align. The applicant will be
required to align S. Enter Way centerline to centerline with Emerson Street on the north side of
10 Cavanaugh Subdivision
Victory Road. Coordinate the ultimate location of the roadway with Tim Mussell or Toothman-Orton
Engineering.
13. Stub Streets
Policy: District policy 7203.5.1 states that the street design in a proposed development shall cause
no undue hardship to adjoining property. An adequate and convenient access to adjoining property
for use in future development may be required. If a street ends at the development boundary, it
shall meet the requirements of sub section 7205, "non-continuous streets."
District policy 7205.5 states that stub streets will be required to provide intra-neighborhood
circulation or to provide access to adjoining properties. Stub streets will conform with the
requirements described in Section 7204.5, 7204.6 and 7204.7, except a temporary cul-de-sac will
not be required if the stub street has a length no greater than 150-feet. A sign shall be installed at
the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE".
Applicant Proposal: The applicant is proposing to extend or connect to several surrounding
proposed or existing stub streets. They are as follows:
• Extending a stub street from the east and from the south from within Tuscany Village
Subdivision.
• Constructing a new stub street to the south to an undeveloped parcel.
• Extending a stub street from the east from within Reflection Ridge Subdivision.
Staff CommentlRecommendation: The applicant's proposals meet District policy.
14. Signal at Harris Street & Meridian Road (SH 69)
The submitted TIS states that a signal is warranted at the site access (Harris Street) intersection
with Meridian Road (SH69). Harris Street is located at the half-mile, and this location meets the
requirements of the City of Meridian's Unified Development Code for an access location. The
applicant should be required to provide a road trust deposit with the District for one-half of the cost
for the design and construction of the signal. When the property on the west side of Meridian Road
develops, they can utilize the road trust deposit funds to construct the signal at that time OR at the
time when ITD approves a signal in that location. Depending on the signal design, Harris Street
may need to be wider at is intersection with Meridian Road.
15. Rumpel Lane
There is an existing private lane, Rumpel Lane, located at this site's south property line that
intersects Meridian Road generally in alignment with Harris Street on the west side of the roadway.
The applicant has acquired Rumpel Lane and incorporated the street as part of the new residential
collector (Harris Street). The intent is to close Rumpel Lane and have only one street intersecting
Meridian Road at the half-mile.
16. Bridge for Ridenbaugh Canal Crossing
The District will require that the applicant submit the bridge plans for the crossing of the
Ridenbaugh Canal (Standing Timber Way) for review and approval prior to the pre-construction
meeting and plat approval.
17. Traffic Calming
District policy 7202.2.6 states that the design of local street systems should discourage excessive
speeds by using curvilinear alignment and/or breaks in the street system.
Staff Comment/Recommendation: There is one roadway E. Frank Lloyd Street that is
approximately 2,000-feet in length or longer, and the applicant will be required to provide traffic
11 Cavanaugh Subdivision
calming along this local street (i.e. chokers, bulb-outs, traffic circles, etc.). The applicant should
coordinate the location and design of the traffic calming devices with District Traffic Services staff.
18. Tree Planter Policy
The applicant should also comply with the District's Tree Planter Width Interim Policy which
prohibits all trees in planters less than 6-feet in width. In addition to prohibiting trees in planters less
than 6-feet in width, the policy requires a minimum planter width of 6-feet for class II tress with the
installation of root barriers on both sides of the planter strip or a minimum planter width of 8-feet
without the installation of a root barrier. The policy also requires Class I and Class III trees to
provide a minimum planter width of 10-feet.
~ 9. Other Access
Victory Road is classified as a minor arterial roadway. Meridian Road is classified as a principal
arterial roadway. Other than the access specifically approved with this application, direct lot access
to Victory and Meridian Roads is prohibited and should be noted on the final plat.
C. Site Specific Conditions of Approval
The City of Meridian, the applicant and ITD should work together to determine if additional right-of-
way or improvements are necessary on Meridian Road (SH 69).
2. Dedicate a total of 48-feet (or 38-feet with the sidewalk in an easement) of right-of-way from the
centerline of Victory Road abutting the parcel by means of a warranty deed. The right-of-way
purchase and sale agreement and deed must be completed and signed by the applicant prior to
scheduling the final plat for signature by the ACHD Commission or prior to issuance of a building
permit (or other required permits), whichever occurs first. Allow up to 30 business days to process
the right-of-way dedication after receipt of all requested material. The owner will be paid the fair
market value of the right-of-way dedicated which is an addition to existing ACRD right-of-way.
3. Construct a 5-foot detached concrete sidewalk abutting the site on Victory Road located a minimum
of 41-feet from the centerline of the roadway. If any portion of the sidewalk is located outside the
public right-of-way, the applicant shall provide the District with an easement.
4. The District recommends that the applicant construct a 5-foot concrete sidewalk across the two out-
parcels along Victory Road on either side of the proposed school site. This sidewalk should either
be constructed within the existing right-of-way or within an easement provided by the property
owners.
5. Construct an eastbound right turn lane and a westbound left turn lane on Victory Road into the site
at the intersection with Standing Timber Way. Dedicate the additional right-of-way necessary for
the turn lanes without compensation. The widening of Victory Road for the auxiliary turn lanes may
necessitate the widening of the bridge west of the proposed entrance road. If the bridge widening is
necessary to construct the pavement tapers required for the turn lanes the applicant shall be
required to design and construct the bridge widening at that time.
6. Construct a commercial entry road to intersect Victory Road, S. Enter-Way, located approximately
670-feet east of Meridian Road. The roadway shall be constructed as a 40-foot street section with
vertical curb, gutter, and sidewalk within 54-feet of right-of-way. S. Enter Way is required to align
centerline to centerline with Emerson Street on the north side of Victory Road.
7. Construct the internal commercial roadways identified below, as proposed.
~ 2 Cavanaugh Subdivision
• S. Entry Way, E. View Water St, and S. Thisa Way, and E. Boardwalk Row between Thisa
Way and Standing Timber Way are proposed to be constructed as a 46-foot street section
with vertical curb, gutter, and 5-foot attached sidewalk within 54-feet of right-of-way.
• E. Summer Walk Way, is proposed to be constructed a 36-foot street section with vertical
curb, gutter, and 5-foot attached sidewalk within 50-feet of right-of-way.
• E. Boardwalk Row from S. Enter Way east approximately 250-feet is proposed to be
constructed with 11.5-foot travel lanes, 19-foot diagonal parking lanes, vertical curb, gutter
and concrete sidewalk within 75-feet of right-of-way.
• E. Boardwalk Row from S. Thisa Way west approximately 180-feet is proposed to be
construct with 11.5-foot travel lanes, 19-foot diagonal parking lanes, vertical curb, gutter,
and concrete sidewalk within 75-feet of right-of-way.
Construct the remainder of E. Boardwalk Row with diagonal parking or with no on street parking in
that location.
8. Construct one right-in ONLY driveway located approximately 1,250-feet east of Meridian Road.
Coordinate the exact location, design, and signage with District Traffic Services staff.
9. Construct the commercial driveway located of off the commercial entry road (S. Enter Way) no
closer than 50-feet from Victory Road. Pave the driveways their full width and at least 30-feet into
the site beyond the edge of pavement of the roadway and install pavement tapers with 15-foot radii
abutting the existing roadway edge. Commercial driveways are restricted to a width of 36-feet.
10. Construct the entrance road, Standing Timber Way (intersecting Victory) as a residential collector
with vertical curb, gutter, and 5-foot concrete sidewalk, from its intersection with Victory through the
site to the south property line crossing the Ridenbaugh Canal. The street should be constructed as
a boulevard style with a 27-foot wide islands and 21-foot street sections on each side of the island.
The center islands shall be owned and maintained by the homeowner's association. If any portion
of the sidewalk is located outside of the public right-of-way, the applicant will be required to provide
an easement. The applicant shall re-design the center island (to be no wider than 12-feet) at the
intersection of Standing Timber Way & Victory to allow for simultaneous left and right turns
(eastbound and westbound) on Standing Timber Way.
11. Construct Harris Street, the entrance street intersecting Meridian Road at the half-mile, as a
standard residential collector with a 36-foot street section (vertical curb, gutter, and 5-foot concrete
sidewalk on the north side of the road and a gravel shoulder and barrow ditch on the south.) from its
intersection with Meridian Road to its intersection with the stub street being extended from
Reflection Ridge
12. Provide a road trust deposit with the District for one-half of the cost for the design and construction
of the signal for the intersection of Harris Street and Meridian Road (SH 69). When the property on
the west side of Meridian Road develops, the road trust deposit funds can be utilized to construct
the signal at that time OR at the time when ITD approves a signal in that location. Design Harris
Street to accommodate a future signal at the intersection with Meridian Road.
13. District staff recommends that the private lane, Rumpel Lane, be closed and/or incorporated into
the new public street, Harris Street, and that all access be taken to the new public street. The City
of Meridian and ITD should coordinate on the future closure of this roadway to ensure that only one
street intersects Meridian Road at the half-mile.
13 Cavanaugh Subdivision
14. Construct the internal local streets as 33-foot street sections with rolled curb, gutter, and 5-foot
detached concrete sidewalks within 50-feet of right-of-way. Receive written approval from the
Meridian Fire Department for the reduced street section OR construct the streets as standard 36-
foot street sections.
15. Construct two 20-foot wide alleys in Block 21 & 22, and two 16-foot alleys in Block 26 & 27 and
Blocks 24 & 25, as proposed. The alleys shall comply with the following policies:
• Minimum right-of-way width is to be 16-feet.
• Access is allowed to and from a fully improved alley (District policy 7204.10.2). Parking shall be
designed so the minimum clear distance from the back of the parking stall to the opposite side
of the alley is 22-feet for perpendicular parking.
• An access to an alley shall be located a minimum of 25-feet from the nearest public street.
• A minimum of back-of-curb radius of 15-feet is required at all alley intersections.
16. Extend a stub street from the east and from the south from within Tuscany Village Subdivision.
17. Extend a stub street from the east within Reflection Ridge Subdivision.
18. Construct a new stub street to the south and one to the east to the undeveloped parcel. Install a
sign at the terminus of the roadways stating, "THIS ROAD WILL BE EXTENDED IN THE FUTURE."
If the stub streets are greater than 150-feet in length, provide a temporary turnaround at the
terminus of the roadways.
19. Construct a public street in alignment with Mesa Way on the north side of Victory Road. Mesa Way
south of Victory Road will be required to be constructed in alignment with Mesa Way (centerline to
centerline) on the north side of Victory Road. This roadway will be required to be constructed as
one-half of a 36-foot street section with vertical curb, gutter, and 5-foot concrete sidewalk on the
west side, a minimum of 24-feet of pavement, and a 3-foot gravel shoulder and adequately sized
barrow ditch on the east side of the roadway. This road will be required to be within a minimum 40-
feet of right-of-way. If an alignment with Mesa Way cannot be achieved ,the applicant should re-
design this portion of the site to provide another local street access for the school site.
20. Submit the bridge plans for the crossing of the Ridenbaugh Canal (Standing Timber Way) for review
and approval prior to the pre-construction meeting and plat approval.
21. Other than the access specifically approved with this application, direct lot access to Victory and
Meridian Road is prohibited and shall be noted on the final plat.
22. Comply with all Standard Conditions of Approval.
D. Standard Conditions of Approval
Any existing irrigation facilities shall be relocated outside of the right-of-way.
2. Private sewer or water systems are prohibited from being located within any ACHD roadway or
right-of-way.
3. All utility relocation costs associated with improving street frontages abutting the site shall be borne
by the developer.
14 Cavanaugh Subdivision
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file
number) for details.
5. Comply with the District's Tree Planter Width Interim Policy.
6. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by
the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details.
7. All design and construction shall be in accordance with the Ada County Highway District Policy
Manual, ISPWC Standards and approved supplements, Construction Services procedures and all
applicable ACRD Ordinances unless specifically waived herein. An engineer registered in the State
of {daho shall prepare and certify all improvement plans.
8. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or
other required permits), which incorporates any required design changes.
9. Construction, use and property development shall be in conformance with all applicable
requirements of the Ada County Highway District prior to District approval for occupancy.
10. Payment of applicable road impact fees are required prior to building construction. The assessed
impact fee will be based on the impact fee ordinance that is in effect at that time.
11. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The
applicant at no cost to ACRD shall repair existing utilities damaged by the applicant. The applicant
shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking
ground within ACHD right-of-way. The applicant shall contact ACRD Traffic Operations 387-6190 in
the event any ACRD conduits (spare or filled) are compromised during any phase of construction.
12. No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized
representative of the Ada County Highway District. The burden shall be upon the applicant to
obtain written confirmation of any change from the Ada County Highway District.
13. Any change by the applicant in the planned use of the property which is the subject of this
application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or
other regulatory and legal restrictions in force at the time the applicant or its successors in interest
advises the Highway District of its intent to change the planned use of the subject property unless a
waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at
the time the change in use is sought.
E. Conclusions of Law
The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval
are satisfied.
2. ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
15 Cavanaugh Subdivision
Attachments
1. Vicinity Map
2. Site Plan
3. Commercial Street Layout
4. Request for Reconsideration Guidelines
5. Utility Coordination
6. Development Process Checklist
~'.
i~~
C
16 Cavanaugh Subdivision
PRELIMINARY PLAT
FOR
CAVANAUGH SUBDIVISION
~ vallan ~ >~ r~>H ~/~ ar s~clall .lo
robe 3 ~ItK RAMCE ~ osr, BOhE IIEiUIIW
MERIDIAN, AOA COUNTY, IDAHO
aoo~
17 Cavanaugh Subdivision
18 Cavanaugh Subdivision
Develo ment Process Checklist
®Submit a development application to a City or to the County
®The City or the County will transmit the development application to ACRD
®The ACHD Planning Review Division will receive the development application to review
®The Planning Review Division will do one of the following:
^Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time.
^Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part
of a previous development application and that the site specific requirements from the previous development also
apply to this development application.
^Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating
the proposal for its conformance to District Policy.
®Write a Commission Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports.
^For ALL development applications, including those receiving a "No Review" or "Comply With" letter:
• The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development
Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required
by ACRD, then architectural plans may be submitted for purposes of impacl fee calculation.)
• The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of--way,
including, but not limited to, driveway approaches, street improvements and utility cuts.
^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Zone)
^ Driveway or Property Approach(s)
• Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by
Development Services & Traffic Services). There is a one week turnaround for this approval.
^ Working in the ACHD Right-of-Way
• Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application"
to ACRD Construction -Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are
placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
^ Sediment 8~ Erosion Submittal
• At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan
Designer, must be turned into ACHD Construction -Subdivision to be reviewed and approved by the ACHD Drainage
Division.
^ Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being
scheduled.
^ Final Approval from Development Services
ACHD Construction -Subdivision must have received approval from Development Services prior to scheduling aPre-Con.
19 Cavanaugh Subdivision
Ada County Utility Coordinating Council
Developer/Local Improvement District
Right of Way Improvements Guideline Request
Purpose: To develop the necessary avenue for proper notification to utilities of local highway and
road improvements, to help the utilities in budgeting and to clarify the already existing process.
1) Notification: Within five (5) working days upon notification of required right of way improvements
by Highway entities, developers shall provide written notification to the affected utility owners and
the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to,
project limits, scope of roadway improvements/project, anticipated construction dates, and any
portions critical to the right of way improvements and coordination of utilities.
2) Plan Review: The developer shall provide the highway entities and all utility owners with
preliminary project plans and schedule a plan review conference. Depending on the scale of utility
improvements, a plan review conference may not be necessary, as determined by the utility
owners. Conference notification shall also be sent to the UCC. During the review meeting the
developer shall notify utilities of the status of right of way/easement acquisition necessary for their
project. At the plan review conference each company shall have the right to appeal, adjust and/or
negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter
of review indicating the costs and time required for relocation of its facilities. Said letter of review is
to be provided within thirty calendar days after the date of the plan review conference.
3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary plans.
Utilities may request an updated plan review meeting if revisions are made in the preliminary plans
which affect the utility relocation requirements. Utilities shall have thirty days after receiving the
revisions to review and comment thereon.
4) Final Notification: The developer will provide highway entities, utility owners and the UCC with
final notification of its intent to proceed with right of way improvements and include the anticipated
date work will commence. This notification shall indicate that the work to be performed shall be
pursuant to final approved plans by the highway entity. The developer shat! schedule a
preconstruction meeting prior to right of way improvements. Utility relocation activity shall be
completed within the times established during the preconstruction meeting, unless otherwise
agreed upon.
Notification to the Ada County UCC can be sent to: 50 S. Cole Rd. Boise 83707, or Visit iducc.com
for a-mail notification information.
20 Cavanaugh Subdivision
Request for Reconsideration of Commission Action
Request for Reconsideration of Commission Action: A Commissioner, a member of ACRD
staff or any other person objecting to any final action taken by the Commission may request
reconsideration of that action, provided the request is not for a reconsideration of an action
previously requested to be reconsidered, an action whose provisions have been partly and
materially carried out, or an action that has created a contractual relationship with third parties.
a. Only a Commission member who voted with the prevailing side can move for
reconsideration, but the motion may be seconded by any Commissioner and is voted on by
all Commissioners present.
If a motion to reconsider is made and seconded it is subject to a motion to postpone to a
certain time.
b. The request must be in writing and delivered to the Secretary of the Highway District no later
than 3:00 p.m. on the day prior to the Commission's next scheduled regular meeting
following the meeting at which the action to be reconsidered was taken. Upon receipt of the
request, the Secretary shall cause the same to be placed on the agenda for that next
scheduled regular Commission meeting.
c. The request for reconsideration must be supported by written documentation setting forth
new facts and information not presented at the earlier meeting, or a changed situation that
has developed since the taking of the earlier vote, or information establishing an error of fact
or law in the earlier action. The request may also be supported by oral testimony at the
meeting.
d. If a motion to reconsider passes, the effect is the original matter is in the exact position it
occupied the moment before it was voted on originally. It will normally be returned to ACHD
staff for further review. The Commission may set the date of the meeting at which the
matter is to be returned. The Commission sha11 only take action on the original matter at a
meeting where the agenda notice so provides.
e. At the meeting where the original matter is again on the agenda for Commission action,
interested persons and ACHD staff may present such written and oral testimony as the
President of the Commission determines to be appropriate, and the Commission may take
any action the majority of the Commission deems advisable.
f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover
administrative costs, as established by the Commission.
21 Cavanaugh Subdivision