Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Independent Contractor Agreement with Idaho Custom Wood Products for New Meridian City Hall
== Document A1011CMa -1992 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM AGREEMENT made as of the day of in the year of (/r1 words, indicate day, mondt and rear) BETWEEN the Owner: (N«nte « nd address) CITY OF MERIDIAN 33 East Idaho Avenue Meridian, Idaho 83642-2300 and the Contractor: (Name and address) Idaho Custom Wood Products 11376 W. President Drive Boise, Idaho 83713 For the following Project: (Include detailed description of Project, locution, address and scope.) New Meridian City Hall 33 East Broadway Avenue Meridian, Idaho 83642 An approximately 100,000 square foot, multi-story city hall oftice building with a basement. The Construction Manager is: (Name a nd address) PETRA INCORPORATED 1097 N. Rosario Street Meridian, Idaho 83646 The Architect is: (Name m1d address) LCA ARCHITECTS, P.A. 1221 Shoreline Lane Boise, Idaho 83702 The Owner and Contractor agree as set forth below. ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. The 1992 Edition of AIA Document A201/CMa,General Conditions of the Contract for Construction, Construction Manager-Adviser Edition, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. Init. AIA Document A101/CMa*'r -1992. Copyright ®1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document. or any portion of it, 1 may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced / by AIA software at 08:39:50 on 08/15/2007 under Order No.1000295111_t which expires on 4/4/2008, and is not for resale. User Notes: (3699095451) ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others, or as follows: ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement is the date from which the Contract Time of Section 3? is measured, and shall be the date of this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Puru,graplts deleted) April 1, 2008 § 3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than )days after the Date of Commencement. (btsert the calendar date or number of calendar dues after the dote of commencement. Also insert any requirements for curlier Substantial Completion of certain portions of the Work, if not stated elseK•here in the Contract DocunrerNs. ) Portion of Work Substantial Completion date Provide all labor, material, tcx~ls, and equipment to July I, 2008 complete the cabinetry and trim as noted on the drawings and per the following: Division I -General Requirements Section 06402 -Interior Architectural Woodwork Section 06200 -Finish Carpentry This bid package specifically includes: • Furnish and install all cabinetry and shelving including wood veneer phenolic backed cabinets and associated hardware. • Furnish and install all plastic laminate countertops, backsplash and associated trim. • Furnish and install light shelves, including all material as shown. • Furnish and install all solid-surface countertops. • Furnish and install all standing and running trim, including plywood paneling. subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to complete on time.) AIA Document A101/CMaT"' -1992. Copyright ©1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA" Document is Init. protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA' Document, or any portion of it. 2 may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced / by AIA software at 08:39:50 on 08/15/2007 under Order No.1000295111_1 which expires on 4/4/2008, and is not for resale. User Notes: (3699095451) The Contractor acknowledges and agrees that the Owner will suffer financial loss in an amount that is difficult to quantify if the Work is not substantially complete on the date set forth in the Contract Documents. The Owner shall have the option to assess liquidated damages against the Contractor (and its surety, if any) in an amount of Five Hundred & NO/l00 Dollars ($500.00) per calendar day, for each calendar day of delay until the Work is substantially complete. The Contractor acknowledges and agrees that the amounts set forth above are a reasonable estimate of the damages that will likely be incurred by Owner in the event the Work is not substantially complete by the date set forth in the Contract Documents, and not a penalty. If responsibility for a delay in substantial completion shared by the Contractor and others, Owner may reasonably apportion the damages between such responsible parties. The right to assess liquidated damages is in addition to, and not in limitation of, any right or remedy available to the Owner or to protect the Owner to address delay by the Contractor, whether such right or remedy is under law, in equity or under Contract Documents. ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of Four Hundred Sixty Four Thousand Dollars & NO/100 ($ 464,000.00), subject to additions and deductions as provided in the Contract Documents. § 4.2 The Contract Sum is based upon the following altemates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the munbers or other identification of accepted alternates. If decisions on other alternates are to be made by the Owner subsequent to the e.recutial of this Agreement, attach a schedule of such other altemates showing the mnount for each and the dote until which shut amount is eulid. ) § 4.3 Unit prices, if any, are as follows: Description Units Price (E 0.00) ARTICLE 5 PROGRESS PAYMENTS § 5.1 Based upon Applications for Payment submitted by the Contractor to the Construction Manager, and upon Project Applications and Certificates for Payment issued by the Construction Manager and Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: § 5.3 Provided an Application for Payment is submitted to the Construction Mana~er not later than the 25th day of a month, the Owner shall make payment to the Contractor not later than the 20` day of the following month. If an Application for Payment is received by the Construction Manager after the application date fixed above, payment shall be made by the Owner not later than Thirty (30) days after the Construction Manager receives the Application for Payment. § 5.4 Each Application for Payment shall be based upon the Schedule of Values submitted by the Contractor in accordance with the Contract Documents. The Schedule of Values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager or Architect may require. This schedule, unless objected to by the Construction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. AIA Document A10t/CMaTe -1992. CopyNght ©1992 by The American Institute of Architects. All rights reserved. WARNING: This AIAY Document is Init. protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced / by AIA software at 08:39:50 on 08/15/2007 under Order No.1000295111 _t which expires on 4/4/2008, and is not for resale. User Notes: (3699095451) § 5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: § 5.6.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the Schedule of Values, less retainage of Five Percent ( 5% ). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as provided in Section 7.3.7 of the General Conditions; § 5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of ( ); § 5.6.3 Subtract the aggregate of previous payments made by the Owner; and § 5.6.4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certiticate for Payment as provided in Section 9.5 of the General Conditions. § 5.7 The progress payment amount determined in accordance with Section 5.6 shall be further modified under the following circumstances: § 5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to ( ) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete Work and unsettled claims; and § 5.7.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions. § 5.8 Reduction or limitation of retainage, if any, shall be as follows: (/f it is uvended, prior to Substantial Completion of the enure Work, to reduce nr limit the retainage resulting from the percentages inserted in Sectlrnu 5.6.1 a nd 5.6.2 above, and this is not e.rp/wined e/se1a~/rere ir1 t/te Corttrctct Documents, insert here provisions for such reduction or lirnitatron. ) ARTICLE 6 FINAL PAYMENT Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (I) the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconforming Work as provided in Section 12.22 of the General Conditions and to satisfy other requirements, if any, which necessarily survive final payment; and (2) a final Project Certiticate for Payment has been issued by the Construction Manager and Architect, such final payment shall be made by the Owner not more than 30 days after the issuance of the final Project Certiticate for Payment, or as follows: ARTICLE 7 MISCELLANEOUS PROVISIONS § 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (/nsert rate of interest agreed upon, rf any.) ( )per annum Init. AIA Document A101/CMaT" -1992. Copyright ©1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, 4 may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced / by AIA software at 08:39:50 on 08/15/2007 under Order No.1000295111_1 which expires on 4/4/2008, and is not for resale. User Notes: (3699095451) (Usury laws and requirements under the Federal Trud1 in Lending Act, similar state and local conseemer credit lows and other regulations ut the Owner's and Contractor's principul places of business, the location of fire Project and elsewhere muy affect the validity of this provision. Legal advice should be obtained with respect to deletions or modifications, and also regarding requirements such as written disclosures or waivers.) § 7.3 Temporary facilities and services: (Here insert temporury facilities and services which are different from or in addition to those included elsewhere in the Contract Documents.) § 7.4 Other Provisions: (Here list any special provisions affecting the Contract.) ARTICLE 8 TERMINATION OR SUSPENSION § 8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article l4 of the General Conditions. § 8.2 The Work may be suspended by the Owner as provided in Article 14 of the General Conditions. ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: § 9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document A101/CMa, 1992 Construction Manager-Adviser Edition. § 9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201/CMa, 1992 Construction Manager-Adviser Edition. § 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated , and are as follows: Document Title Pages Volume 2 Phase [(I Bidding/General 218 Conditions § 9.1.4 The Specifications are those contained in the Project Manual dated as in Section 9. L3, and are as follows: (Either list the Specifications here or refer to an exhibit attuched to this Agreement. ) Title of Specifications exhibit: Volume I - Technical Specifications 904 pages (Table deleted) § 9.1.5 The Drawings are as follows, and are dated unless a different date is shown below: (Either list the Drawings here or refer to un exhibit attuclled to this Agreement.) Title of Drawings exhibit: ARCHITECTURAL O.OT Cover Sheet AO.OT Life Safety Plan-Site/Basement Floor AO.IT Life Safety Plan- First Floor A0.2T Life Safety Plan- Second Floor A0.3T Life Safety Plan- Third Floor A0.4T Life Safety Plan- Penthouse AO.ST U.L Assemblies AIA Document A101/CMaT° - 1992. Copyright ©1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA'9 Document is Init. protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, 5 may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced / by AIA software at 08:39:50 on 08/15/2007 under Order No.1000295111_1 which expires on 4/4/2008, and is not for resale. User Notes: (3699095451) A2.OOT Overall- Basement Floor Plan A2.OlT Basement Floor- Area I Floor Plan A2.OlTF Basement Floor- Area I Floor Finish Plan A2.lOT Overall- First Floor Plan A2.1 IT First Floor-Area I Floor Plan A2.1 lTF First Floor-Area I Floor Finish Plan A2.I2T First Floor-Area 1 Floor Plan A2.12TF First Floor-Area 2 Floor Finish Plan A2.20T Overall-Second Floor Plan A2.21T Second Floor-Area I Floor Plan A2.21TF Second Floor-Area I Floor Finish Plan A2.22T Second Floor-Area 2 Floor Plan A2?2TF Second Floor-Area 2 Floor Finish Plan A2.30T Overall-Third Floor Plan A2.31T Third Floor-Area l Floor Plan A2.31TF Third Floor-Area I Floor Finish Plan A2.32T Third Floor-Area 2 Floor Plan A2.32TF Third Floor-Area 2 Floor Finish Plan A2.40T Overall-Penthouse Floor Plan A2.6T Room Finish Schedules A3.OT Door and Window Schedules Frame Types A3.1T Door and Window Details A3.2T Shell Window Frame Types A3.3T Door and Window Details A3.4T Door and Window Details A4.4T Building Sections A4.ST Building Sections AS.OT Wall Sections AS.1T Wall Sections AS.ZT Wall Sections A6.OT Enlarged Floor Plans A6.lT Enlarged Floor Plans A6.2 Interior Elevations A6.3T Interior Elevations A6.4T Interior Elevations A6.ST Interior Elevations A6.6T Interior Elevations A6.7T Interior Elevations A6.8T Interior Elevations A6.9T Interior Elevations A6.1 OT Interior Elevations A6.1 IT Interior Elevations A6.12T Interior Elevations A7.OIT Basement Floor Reflected Ceiling Plan-Area I A7.02T Basement Floor Reflected Ceiling Plan-Area 2 A7.12T First Floor Retec[ed Ceiling plan-Area I A7.21T Second Floor Reflected Ceiling Plan-Area I A7.22T Second Floor Retected Ceiling Plan-Area 2 A7.31T Third Floor Reflected Ceiling Plan-Area I A7.32T Third Floor Reflected Ceiling Plan-Area 2 A8.OT Wall Types and Detail A8.1T Interior Details A8.2T Interior Details A8.3T Interior Details A8.4T Interior Details A9.OT Elevator Plans and Sections MECHANICAL AIA Document A101lCMa*" -1992. Copyright ©1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA"' Document is Init. protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA` Document, or any portion of it, may result in severe civil and criminal penalties. and will be prosecuted to the maximum extent possible under the law. This document was produced / by AIA software at 08:39:50 on OS/15i2007 under Order No.100029511 1_1 which expires on 4/4/2008, and is not for resale. User Notes: (3699095451) P0.0 Mechanical Cover Sheet P0.001 Basement Foundation Plumbing Plan Area 1 P0.002 Basement Foundation Plumbing Plan Area 2 P0.01 Basement Waster Plan Area 1 P0.02 Basement Waste Plan Area 2 PI.I I First Floor Plumbing Plan Area 1 P1.12 First Floor Plumbing Plan Area 2 P2.1 I Second Floor Plumbing Plan Area l P2.12 Second Floor Plumbing Plan Area 2 P3. I I Third Floor Plumbing Plan Area I P3.12 Third Floor Plumbing Plan-Area 2 P5.0 Plumbing Details P5.1 Plumbing Details M0.11 Basement Floor HVAC Ceiling Plan Area 1 M1.12 Basement Floor HVAC Ceiling Plan Area 2 MI.OI First Floor HVAC Floor Plan Area 1 M 1.02 First Floor HVAC Floor Plan Area 2 M I. l 1 First Floor HVAC Ceiling Plan Area 1 M 1.12 First Floor HVAC Ceiling Plan Area 2 M2.01 Second Floor HVAC Floor Plan Area I M2.02 Second Floor HVAC Floor Plan Area 2 M2.1 I Second Floor HVAC Floor Plan Area I M2.12 Second Floor HVAC Ceiling Plan Area 2 M3.01 Third Floor HVAC Floor Plan Area I M3.02 Third Floor HVAC Ceiling Plan Area I M3.11 Third Floor HVAC Ceiling Plan Area I M3.12 Third Floor HVAC Ceiling Plan Area 2 M4.1 I Fourth Floor HVAC Floor Plan Area 1 M4.12 Fourth Floor HVAC Floor Plan Area 2 M5.01 HVAC Roof Plan Area 1 M5.02 HVAC Root Plan Area 2 M6.0 HVAC Schedules M6.1 HVAC Details M6? Hydronic Piping Schematic FP0.1 Basement Floor Overall Fire Protection Plan FP1.0 First Floor Overall Fire Protection Plan FP2.0 Second Floor Overall Fire Protection Plan (Table deleted) FP3.0 Third Floor Overall Fire Protection Plan FP4.0 Fourth Floor Overall Fire Protection Plan ELECTRICAL EI.O Site Electrical Plan El.l Shell and Core Site Electrical Details E2.01 F Basement Fire Alarm Plan -Area 1 E2.01 L Basement Lighting Plan -Area I E2.01 M Basement Mechanical Power Pla -Area I E2.01 P Basement Power Plan -Area I E2.01 S Basement Special Systems Plan -Area I E2.02F Basement Fire Alarm Plan -Area 2 E2.02L Basement Lighting Plan -Area 2 E2.02M Basement Power Plan -Area 2 E2.02S Basement Special Systems Plan -Area 2 E2. l F Fint Floor Fire Alarm Plan -Area 1 E2.1 L First Floor Lighting Plan -Area I E2.1 M First Floor Mechanical Power Plan -Area I E2.1P First Floor Power Plan -Area l E2.1 S First Floor Special Systems Plan -Area I Init. AIA Document A101/CMaTM -1992. Copyright m 1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA"' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA"' Document, or any portion of it, 7 may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced / by AIA software at 08:39:50 on 08!15/2007 under Order No.1000295111_1 which expires on 4/4/2008, and is not for resale. User Notes: (3699095451) E2.2F First Floor Fire Alarm Plan -Area 2 E2.12L First Floor Lighting Plan -Area 2 E2.12M First Floor Mechanical Power Plan -Area 2 E2.12P First Floor Power Plan -Area 2 E2.12S First Floor Special Systems Plan -Area 2 E2.21F Second Floor Fire Alarm Plan -Area 1 E2.21L Second Floor Lighting Plan -Area I E2.21 M Second Floor Mechanical Power Plan -Area 1 E2.21 P Second Floor Power Plan -Area 1 E2.21 S Second Floor Special Systems Plan -Area I E2.22F Second Floor Fire Alarm Plan -Area 2 E2.22L Second Floor Lighting Plan -Area 2 E2.22M Second Floor Mechanical Power Plan -Area 2 E2.22P Second Floor Power Plan -Area 2 E2.22S Second Floor Special Systems Plan -Area 2 E2.21 F Third Floor Fire Alarm Plan -Area 1 E2.21 L Third Floor Lighting Plan -Area I E2.21 M Third Floor Mechanical Power Plan -Area I E2.2 I P Third Floor Power Plan -Area 1 E2.21 S Third Floor Special Systems Plan -Area I E2.22F Third Floor Fire Alarm Plan -Area 2 E2.22L Third Floor Lighting Plan -Area 2 E2.22M Third Floor Mechanical Power Plan -Area 2 E2.22P Third Floor Power Plan -Area 2 E2.22S Third Floor Special Systems Plan -Area 2 E2.40 Overall-Roof Electrical Plan E2.50 Penthouse Electrical Plans E3.00 Electrical Schedules E3.01 Electrical Schedules E3.02 Electrical Schedules E3.03 Electrical Schedules E3.04 Electrical Schedules E3.05 Electrical Schedules E4.0 Electrical Details E4.1 Electrical Details E5.0 One Line Diagram E6.1 Lighting Compliance Certificate Addendum B A2.11TFR First Floor Finish Plan -Area 1 A2.12TFR First Floor Finish Plan -Area 2 E1.0 Site Electrical Plan EI.1 Shell and Core Site Electrical Details E2.OIF Basement Fire Alarm Plan- Area I E2.01 L Basement Lighting Plan- Area 1 E2.OlM Basement Mechanical Power Plan- Area I E2.01 P Basement Power Plan- Area l E2.01 S Basement Special Systems Plan- Area I E2.02F Basement Fire Alarm Plan-Area 2 E2.02L Basement Lighting Plan-Area 2 E2.02M Basement Mechanical Power Plan-Area 2 E2.02P Basement Power Plan-Area 2 E2A2S Basement Special Systems Plan-Area 2 E2. I I F First Floor Fire Alarm Plan-Area 1 E2.1 1 L First Floor Lighting Plan-Area I E2.1 lM First Floor Mechanical Power Plan-Area' 1' E2. I I P First Floor Power Plan-Area 1 Init. AIA Document A1011CMaT° -1992. Copyright ©1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, 8 may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced ( by AIA software at 08:39:50 on 08/1512007 under Order No.1000295111_1 which expires on 4/4/2008, and is not for resale. User Notes: (3699095451) E2. I 1 S First Floor Special Systems Plan-Area E2.12F First Floor Fire Alarm Plan-Area 2 E2.I2L First Floor Firc Alarm Plan-Area 1 E2.12L First Floor Lighting Plan-Area 2 E2.12M First Floor Mechanical Power Plan-Area 2 E2.12P First Floor Power Plan-Area 2 E2.12S First Floor Special Systems Plan-Area 2 E2.21 F Second Floor Fire Alarm Plan-Area l E2? I L Second Floor Lighting Plan-Area I E2.21 M Second Floor Mechanical Power Plan-Area I E2.2 l P Second Floor Power Plan-Area 1 E2.21 S Second Floor Special Systems Plan-Area 1 E2.22F Second Floor Fire Alarm Plan-Area 2 E2.22L Second Floor Lighting Plan-Area 2 E2.22M Second Floor Mechanical Power Plan-Area 2 E2.22P Second Floor Power Plan-Area 2 E2.22S Second Floor Special Systems Plan-Area 2 E2.31 F Third Floor Fire Alarm Plan-Area I E2.31 L Third Floor Lighting Plan-Area I E2.3 I M Third Floor Mechanical Power Plan-Area l E2.31 P Third Floor Power Plan-Area 1 E2.31S Third Floor Special Systems Plan-Area 1 E2.32F Third Floor Fire Alarm Plan-Area 2 E2.32L Third Floor Lighting Plan-Area 2 E2.32M Third Floor Mechanical Power Plan-Area 2 E2.32P Third Floor Power Plan-Area 2 E2.32S Third Floor Special Systems Plan-Area 2 E2.40 Overall-Roof Electrical Plan E2.50 Penthouse Electrical Plans E3.00 Electrical Schedules E3.01 Electrical Schedules E3.02 Electrical Schedules E3.03 Electrical Schedules E3.04 Electrical Schedules E3.05 Electrical Schedules E4.00 Electrical Details E4.01 Electrical Details E5.00 One Line Diagram E5.01 Lighting Compliance Certiticate § 9.1.6 The Addenda, if any, are as follows Number Date Pages Addendum A 6-18-07 1 Addendum B 7-2-07 182 Addendum C 7-9-07 4 Addendum D 7-16-07 42 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. § 9.1.7 Other documents, if any, forming part of the Contract Documents are as follows: (List Isere um' additional doctunettts which are intended to form part of the Contract Documents. The General Conditio~ls provide that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, rumple forms and dte Contractor's hid are no- port of the Contract Documents unless enumerated in this Agreement. Tltey should he listed here only if i~ttended to be part of the Contract Doctunertts.) Init. AAA Document A101/CMeTe -1992. Copyright ©1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA"' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, g may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced / by AIA software at 08:39:50 on 08/15/2007 under Order No.1000295111_1 which expires on 4/4/2008, and is not for resale. User Notes: (3699095451) This Agreement is entered into as of the day and year tirst written above and is executed in at least four original copies of which one is to be delivered to the Contractor, one each to the Construction Manager and Architect for use in the administration of the Contract, and the remainder to the Owner. OWNER CITY OF MERIDIAN, An Idaho Municipal Corporatipn .1. (SS~ture~', ' -e>~ ~-- ~ ~h (Printed ruune ca d title) CONTRACTOR Idaho Custo ood P • ducts ~ f~~..~ ~~/~~,~ t/ /. _ (~ed name and trtlel M Gil i~`OV~ 6~ C~~ CB~y,1.~`~ ''=: , '.- .~ ~,, = 17~t~a~J _ /i ~ ~~~Cl r S 1~J ~ ///ll it it it{11Vt~ AIA Document A101/CMaTw -1992. Copyright ©1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is Init. protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA'' Document, or any portion of it, 1 Q may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced / by AIA software at 08:39:50 on 08/15/2007 under Order No.1000295111_1 which expires on 4/4/2008, and is not for resale. User Notes: (3699095451)