Response letter for Jayker Sub. No. 1. Please disregard the previous letters.
10/25/2007
RiveRidge
Engineering
Company
October 25, 2007
Kristy Vigil
City of Meridian Planning Department
660 E. Watertower Lane
Suite 202
Meridian, ID 83642
RE: Jayker Subdivision -Phase 1
Dear Kristy,
We have received and reviewed the final staff report for the referenced project, received October
25, 2007. The applicant is in agreement and supports the conditions of approval contained in the
staff report with the following exceptions.
SITE SPECIFIC CONDITIONS
9. Per the Meridian Fire Department two emergency access roads shall be constructed. Both
of these secondary access roads shall be designed to meet all Fire Department standards.
An emergency access easement shall be graphically depicted on the face of the final plat.
It is understood that this condition is an excerpt from the Development Agreement
and that the first emergency access is required prior to issuance of the 51st building
permit. The second emergency access is required to specifically serve the W. Old
Gold Drive (previously known as Silversage Drive) area of the development prior to
issuance of the 51st building permit for the area served by W. Old Gold Drive.
12. Revise or add the following note(s) on the face of the plat prepared by Brokaw Surveying
and Mapping, LLC, stamped on 10/12/07 by Delson D. Brokaw, prior to signature of the
final plat by the City Engineer:
Second *.) page 3. Add a note, "All lots are hereby designated as having a permanent
public utilities and drainage easement Ten (10) feet adjacent to any rear lot line,
subdivision boundary or public right of way. This easement shall not preclude the
construction of hard surface driveways and walkways to each lot." Staff has indicated
that this note is not required because all required easements are depicted on the
plat. This condition can be removed.
3046 S. Bown Way • Boise, ID 83706
208 344-1180 • Fax: 208 344-1182
~2
Thank you for your help with the processing of the plat. Please let me know if you have any
further comments.
Sincerely,
Project M~tiager