Loading...
HomeMy WebLinkAbout10/23 Response to Staff ReportRiveltidge Engineering /~ Company , October 19, 2007 I{risty Vigil City of Meridian Planning Department 660 E. Watertower Lane Suite 202 Meridian, ID 83642 RE: Jayker Subdivision -Phase 1 Dear Kristy, ~ ~ ~ ~ -~~ OCT ? ~ 2U0~ City (af Meridian City Clerk Office We have received and reviewed the final staff report for the referenced project, dated October . 18, 2007. The applicant is in agreement and supports the conditions of approval contained in the staffreport with the following exceptions. -: SITE SPECIFIC CONDITIONS 9. Per the Meridian Fire Department two emergency access roads shall be constructed. Both of these secondary access roads shall be designed to meet all Fire Department standards.: . . An emergency access easement shall be graphically depicted.on the face of the final plat. It is understood that this condition is an excerpt from the. Development Agreement and that the fret emergency access is required prior to issuance of the 51St. building permit. The second emergency access is required to specifically serve the W. Old Gold Drive (previously known as Silversage Drive) area of the development prior to issuance of the 51st building permit for the area served by. W. Old Gold Drive. 12. Revise or add the following note(s) on the face. of the plat prepared by Brokaw Surveying and Mapping, LLC, stamped on 10/12/07 by Deleon D. Brokaw, prior to signature of the final plat by the City Engineer: 7.) Revise to read "... lines. A ~ree{3~ five 5 foot wide ...." Staff. has :indicated that if we can get documentation from the utility company accepting the 3' easement, it will be acceptable. Second *.) page 3. Add a note, "All lots are hereby designated as having a permanent public utilities and drainage easement Ten (10) feet adjacent to any rear lot line; subdivision boundary or public right of way. This easement shall not preclude the construction of hard surface driveways and walkways to each lot " Staff has indicated that this note is not required because all required easements are depicted on the plat. This condition can be removed. 3046 S. Bown Way • Boise, ID 83706 208 344-1180 • Fax: 2A8 344-1182 RR Thank you for your help with the processing of the plat. Please let me know if you have any further comments. Sin erely, arry S. S ple, P.E. Project M ager RiveRidge Engineering Company cc: Treehaven, LLC Scott Steckline, City of Meridian Public Works