Loading...
HomeMy WebLinkAboutLetter from JUBr RECEIVED acr o ~ zoos October 3, 2007 City of Meridian Planning and Zoning Commission 660 Watertower Lane, Suite 201 Meridian, ID 83642 City Of Meridian City Clerk Office RE: Selway Multi-Family Development -Revised Conditions of Approval Members of the Commission: 208-376-7330 Fax: 208-323-9336 www.jub.com We are in receipt of the revised staff report dated September 20, 2007 from Bill Parsons to the Planning and Zoning Commission regarding the above-noted project. We are comfortable with the conditions of approval and agree that they reflect the intent and substance of the Commissioners discussion at the close of the public hearing. However, there are two conditions that will be extremely problematic with regard to how the project will actually be constructed. Specifically, Condition 1.1.10 requires that all amenities must be installed prior to the occupancy of the third building; and Condition 1.1.20 requires that the landscape buffers on the north and west property lines be installed prior to issuance of the first Certificate of Occupancy. While we understand the intent of these conditions, they are problematic because they will actually result in the destruction of the required improvements during construction. Landscaping and sidewalks are always the last items to be installed in a project such as this because they are easily damaged by heavy equipment. There will be a large amount of machinery such as scrappers, backhoes, concrete trucks, dump trucks and small cranes working on the site at various times. All of these machines need considerable room to maneuver and will absolutely wreak havoc on the landscaping and sidewalks if installed in accordance with conditions of approval. While we agree with the intent of installing these items early, we absolutely do not want to install them twice. It is for this reason that we respectfully request that the Commission modify Conditions 1.1.10 and 1.1.20 as follows: F:\ProjectManagers\DSF\10-07.030 -Selway Apartments\10.07-030 - Admin\final conditions response ltr.doc J-U-B ENGINEERS, Inc. ENGINEERS • SURVEYORS • PLANNERS Regional Office 250 South Beechwood Avenue, Suite 201 Boise, ID 83709-0944 i~ ~. a ~~~u B' Engineers Surveyors Planners Staff Report Response Setway Apartments September 18, 2007 Page 2 1.1.10 Provide amenities as follows: a minimum 74,782 sq. ft of open space, a 2,500 square-foot community club house and fitness facility (Quality of Life), storage building, pool and hot tub (Recreation), 5 foot walking trails around the perimeter of the property (Recreation), covered picnic area with barbeques (Quality of Life), a 2,000 square foot tot tot (Recreation) and open space (Open Space), as proposed. In addition, provide an additional active amenity (BBQ area, horseshoe pit, etc.) in the vicinity of Building 7B. Except for the landscaping directly around the structures, the amenity in the vicinity of BIdQ 76 and the path system, all amenities shall be completed prior to occupancy of the third building in the development. 1.1.20 ' .Prior to obtaining any occupancy for any building, all development improvements such as irrigation, parking and landscaping shall be installed on that building's site. Perimeter landscaain~ shall be installed concurrently with the buildinu site landscapinu adiacent to that aortion of the perimeter Although these are very minor changes to the conditions as written by staff, they are of critical importance to the developer and will literally save tens of thousands of dollars in waste. We appreciate the Commission's careful consideration of this matter and will be at the hearing to offer further clarification should it be necessary. Sincerely, J-U-B ENGINEERS, iNC. Daren Fluke, AICP Senior Planner DSF/ch F:\ProjectManagers\DSF\10-07-030 - Selway Apartments\10-07-030 - Admin\final conditions response ltr.doc