Re: Letter of Intent - Jaker Subdivision (Phase One) a parcel of land which is generally
located within a portion of Section 22, Township 4 North, Range 1 West, B.M., Ada County,
Idaho '
Dear Mr. Semple:
This Letter of Intent is in response to your firm's application request to release a number of
Idaho Power Company's (IPC) easements (Inst. #208515, Inst #185142 and Inst #9023013) that
may impact the above-mentioned proposed Jaker Subdivision.
I do understand that someone from your firm has met with IPC's Distribution Designer Glen
Bafus to briefly discuss the subdivsion(s) needs. I further understand that one line has been
rerouted and perhaps two of the existing overhead lines might be integrated into the new
subdivision. However not all of the electrical load information is known at this time, so the
statements below are general and may or may not impact the new construction at the above-
mentioned site.
1. IPC has provided electrical service into the proposed Jaker Subdivision area for many
years. Therefore, IPC can not disconnect service to existing customers except under
certain circumstances, such as line relocation (for a limited time) or non-payment of
account, etc.
2. IPC does not want to hinder this possible new development. IPC anticipates working
with your client, as well as the professionals at RiveRidge Engineering (RiveRidge).
3. All work performed by IPC to provide new szr</ice and/or relocation of existing services
and facilities will be performed in accordance with filed tariff, specifically Rule "H",
which governs new service attachments and distribution line installation and/or any
alterations for all development(s).
4. IPC is also aware that Ada County Highway District (ACHD) may determine a need for
a wider public corridor along Chinden Boulevard. II'C has electrical facilities running
along Chinden and recently relocated some of those facilities along Basco Roadway.
Those existing overhead lines are the closest facilities to this site and are necessary in
order to provide any electrical service (temporary or otherwise) into this proposed
subdivision.
5. Only IPC or its contractors may remove and/or relocate any and/or all portion(s) of
IPC's electrical facilities regardless if those facilities are located within the public
corridor and/or within the proposed residential development site:
P.O. Box 70 (83707)
1221 W. Idaho St.
Boise, ID 83702
6. If necessary, IPC may expect or ask RiveRidge or any other firm representing the
property owner to provide Mr. Bafus with specific work products. The expenses for
those work products are borne by your client.
7. If IPC elects not to remove its existing overhead line for the proposed subdivision site,
then IPC will expect your firm (or any other professional entity) that the property owner
hires now or in the future to provide II'C a legal description Exhibit for any portion of
that line that remains in place. If that should occur, and because both Inst #208515 and
Inst #185142 are blanket easements, Mr. Bafus shall establish the necessary width of that
corridor by whatever the length of existing line that remains in place. All Exhibits must
bear the engineer's seal and signature. If that course of action should occur, then IPC
shall prepare partial release document(s) retaining its rights for that specific existing
utility corridor. IPC shall record its own release document(s) then provide you with a
photocopy.
8. However, if Mr. Bafus redesigns the line as an underground line and if the plat depicts
that same underground utility corridor, then IPC shall release rts easement(s). Those
easement(s) shall only be released after the old line is removed; the new line is
constructed, then energized through the subdivision and after receiving a concurrence
from Mr. Bafus. IPC will specify those release document(s) shall only become effective
upon recordation of the plat. IPC shall record its own release document(s) then provide
you with a photocopy.
9. Based on your application request, IPC' has already released its rights on Instrument
#9023013. I am enclosing a copy of that recorded document for your records.
Please continue to work with Mr. Bafus regarding any of IPC's electrical facilities concerns into
this proposed subdivision. Please contact me if there any questions or concerns that may come
up regarding easement(s) and/or any roadway vacation issues.
Sincerely,
~~~
Enc. (1)
Cc: L. Den Hartog, ACHD
C. Hood, City of Meridian i/
K. Vigil, City of Meridian
G. Bafus, IPC
Eileen Vanderpool
208-388-2699 -Direct Line
208-388-6927 -Fax .