Loading...
HomeMy WebLinkAboutACHD Comments September 10, 2007 To: Kuna Victory LLC PO Box 2020 Boise, ID 83701 t ~~~~ ~ CHD ~ co~~xo ~:~ Subject: MPP-07-014 Emerson Park Commercial 2910 & 3030 Meridian Road i~~~ John S. Franden, President Rebecca W. Arnold, Vice President Sherry R. Huber, Commissioner Dave Bivens, Commissioner Carol A. McKee, Commissioner ~ECEIVE~ SEP 1 - 2007 City of Meridian City Clerk Office On September 10, 2007 the Ada County Highway District acted on your application for the above referenced project. The attached report lists site-specific requirements, conditions of approval and street improvements, which are required. If you have any questions, please feel free to contact me at (208) 387-6174. Sincer , C arrod Planner I Right-of-Way 8~ Development Services Ada County Highway District CC: Project file, Utilities City of Meridian Toothman-Orton Eng. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.acna.aaa.io.us Right-of-Way & Development Services Department CHD Gen~N.v7~t`eel~n ~,:~ Project/File: MPP-07-014/Emerson Park Commercial This is a preliminary plat application for the development of 34 commercial lots on 17.85 acres near the Kuna-Meridian/Victory Road intersection. Lead Agency: City of Meridian Site address: 2910 8~ 3030 Meridian Rd. Staff Level Approval: September 10, 2007 Applicant: Kuna Victory, LLC. PO Box 2020 Boise, ID 83714 Representative: Toothman-Orton Eng. 9777 W. Chinden Blvd. Boise, ID 8'3714 Staff Contact: Coby Harrod Phone: 387-6174 E-mail: charrodt'a~achd.ada.id.us Tech Review: August 31, 2007 Application Information: Acreage: 17.85 Current Zoning: C-G Lots: 34 Common Lots: 1 A. Findings of Fact Existing Conditions 1. Site Information: The site is currently occupied by a landscape nursery and commercial buildings. 2 Description of Adjacent Surrounding Area: Direction Land Use Zonin North Residential R-4 South Vacant R-8 East Residential R-4 West Residential L-O 1 MPP-07-014/Emerson Park Commercial 3. Existing Roadway Improvements 8~ Right-of-Way Meridian Road (SH 69) is currently improved with 4 travel lanes, a center turn lane, and 5-foot detached concrete sidewalk abutting the site. Meridian Road currently has 140-feet of right-of-way. Meridian Road is under the jurisdiction of the Idaho Transportation Department. W. Victory Road is currently improved with 2 travel lanes, and vertical curb, gutter and 5-foot detached concrete sidewalk to the south of the site. There is a center turn lane at the intersection with Meridian Road. W. Victory Road currently has 80-feet of right-of-way (40-feet from centerline). The MeridianNictory Road intersection is signalized. 4. Existing Access: The site currently has two direct access points from Victory Rd. and one direct access point from Kuna/Meridian Rd. 5. Site History: This site was previously reviewed under MAZ09-038 / MCUP03-071 / MPFP03-07 (Mussel Corner). Development Impacts 6. Trip Generation: This development is estimated to generate approximately 1,540 vehicle trips per day (220 existing) based on the Institute of Transportation Engineers Trip Generation Manual, General Office Building land use designation. 7. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 8. Traffic Impact Study: A traffic impact study was not required with this application. 9. Impacted Roadways: Roadway Frontage Functional Classification Traffic Count Level of Service* Speed Limit Meridian Rd. 1,280' Principal 21,199 north of Better 55 MPH (SH 69) Arterial Amity Rd on than "C" 6/13/2007 W. Victory Rd. 1,070' Minor Arterial 5,666 east of SH Better 50 MPH 69 on 1 /24/2007 than "C" *Acceptable level of service fora 5 lane principal arterial is "E" (37,000 VTD). *Acceptable level of service fora 2 lane minor arterial is "D" (14, 000 VTD). 10. Capital Improvements Plan/Five Year Work Program There are no roadways, bridges or intersections in the general vicinity of the project that are currently in the Five Year Work Program or in the Capital Improvements Plan. 2 MPP-07-014/Emerson Park Commercial B. Findings for Consideration °free Planter Policy Tree Planter Policy: The applicant should also comply with the District's Tree Planter Width Interim Policy which prohibits all trees in planters less than 6-feet in width. In addition to prohibiting trees in planters less than 6-feet in width, the policy requires a minimum planter width of 6-feet for class II tress with the installation of root barriers on both sides of the planter strip or a minimum planter width of 8-feet without the installation of a root barrier. The policy also requires Class I and Class III trees to provide a minimum planter width of 10-feet. 2. W. Victory Road Right-of-Way Policy: District policy requires 96-feet of right-of-way on arterial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks and bike lanes. Sidewalk Policy: District policy requires 7-foot wide attached (or 5-foot detached) concrete sidewalk on all collector roadways and arterial roadways (7204.7.2). Applicant Proposal: The applicant is not proposing to construct any improvements to W. Victory Road with this application. Staff Recommendation: W. Victory Rd. is built-out in its current configuration. No additional right- of-way or improvements are required with this application. 3. Kona-Meridian Road (SH 69) Staff Comment: Highway 69 is under the jurisdiction of the Idaho Transportation Department (ITD). The applicant, the City of Meridian, and ITD should work together to determine if additional right-of-way or improvements are necessary on Highway 69. 4. Access/Offsets Access Management Policy: District policy 7207.8 states that direct access to arterials and collectors is normally restricted. The developer shall try to use combined access points. If the developer can show that the use of a combined access point to a collector or arterial street is impractical, the District may consider direct access points. Access points for proposed developments at intersections should be located as far from the intersection as practical, and in no case closer than as illustrated on Figure 72-F4, unless a waiver for the access point has been approved by the District Commission. Offset Policy: District policy 7204.11.6, requires local roadways to align or offset a minimum of 300-feet from an arterial roadway (measured centerline to centerline). Applicant Proposal: The applicant is proposing to construct one direct access point that intersects E. Victory Road approximately 700-feet east of Kuna-Meridian Rd. Staff Recommendation: The applicant's proposal meets District policy and should be approved with this application. 5. Internal Streets Commerciallindustrial Roadways: District policy requires 54-feet of right-of-way on industrial/commercial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 3-lane roadway with curb, gutter and 5-foot wide concrete sidewalks. 3 MPP-07-014/Emerson Park Commercial Turnaround Policy: District policy 7205.2.1 requires turnarounds to be constructed to provide a minimum turning radius of 45-feet. Landscape and parking islands may be constructed in turnarounds if a minimum inside curb radius of 28-feet, and a minimum outside radius of 45-feet are provided. The pavement width shall be sufficient to allow the turning around of a standard AASHTO SU design vehicle without backing. Applicant Proposal: The applicant is proposing to construct the internal streets as 41-foot commercial street sections with vertical curb, gutter, and a 5-foot attached sidewalk within 54-feet of right-of-way. Holleran Drive terminates at both ends with standard cul-de-sac turnarounds. Emmerson terminates where it intersects Holleran Drive. Staff Recommendation: The applicant's proposal meets District policy and should be approved with this application. 6. Common Drives Private Road Policy: If the City of Meridian approves the private road, the applicant shall be required to pave the private roadway a minimum of 20 to 24-feet wide and at least 30-feet into the site beyond the edge of pavement of Emmerson and install pavement tapers with 15-foot curb radii abutting the existing roadway edge. Street name and stop signs are required for the private road. The signs may be ordered through the District. Verification of the correct, approved name of the road is required. ACHD does not make any assurances that the private road, which is a part of this application, will be accepted as a public road if such a request is made in the future. Substantial redesign and reconstruction costs may be necessary in order to qualify this road for public ownership and maintenance. The following requirements must be met if the applicant wishes to dedicate the roadway to ACRD: Dedicate a minimum of 50-feet of right-of-way for the road. Construct the roadway to the minimum ACHD requirements. Construct a stub street to the surrounding parcels. Driveway Offset Policy: District policy 72-F4 (1) and 72-F4 (2), requires driveways located on local residential roadways to offset a controlled and/or uncontrolled intersection a minimum of 50-feet (measured near edge to near edge). Applicant Proposal: The applicant is proposing to construct two 24-foot wide common drives. The first intersects the cul-de-sac turnaround at the south terminus of Holleran Drive and also intersects Emmerson Street approximately 280-feet north of E. Victory Road (measured near edge to near edge). The second private drive intersects Emerson Streets approximately 310-feet north of E. Victory Road (measured near edge to near edge). Staff Comment/Recommendation: The applicant's proposal .meets District Policy and should be approved with this application. 4 MPP-07-014/Emerson Park Commercial C. Site Specific Conditions of Approval Construct the internal streets (Emerson Street / Holleran Dr.) as a 41-foot street section with vertical curb, gutter and a 5-foot attached concrete sidewalk within 54-feet of right-of-way. Provide an easement for any portion of the sidewalk located outside of the right-of-way. 2. Construct two cul-de-sac turnarounds at the north and south terminus of Holleran Drive 3. Construct the southern common drive intersecting Emerson Street approximately 280-feet north of East Victory Road, paved 24-feet in width and at least 30-feet from the edge of pavement of Emerson Street. 4. Construct the northern common drive intersecting Emerson Street approximately 310-feet north of East Victory Road, paved 24-feet in width and at least 30-feet from the edge of pavement of Emerson Street. 5. Comply with all Standard Conditions of Approval. D. Standard Conditions of Approval Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. Private sewer or water systems are prohibited from being located within any ACRD roadway or right-of-way. 3. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. Comply with the District's Tree Planter Width Interim Policy. 6. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 7. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACRD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 8. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 9. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 10. Payment of applicable road impact fees are required prior to building construction. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 5 MPP-07-014/Emerson Park Commercial 11. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACRD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 12. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 13. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. E. Conclusions of Law The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Site Plan 3. Request for Reconsideration Guidelines OR Appeal Guidelines 4. Right of Way Improvements Guideline Request 5. Development Process Checklist 6 MPP-07-014/Emerson Park Commercial MPP-07-014/Emerson Park Commercial i i ~~ .! _ ~ at ~1 I = b ^'~~... ~ ~: ;~ a -9- :Y ~~ as 3 ~~ ...~~, '• ~- ~ r . FY• , / ~ ~ ~ ii ~ ~ .2 Q 3 ! ~ a ,a ~, ; ~~ i t ~ ~ ~ ~ ~ e,. d . ~y ~~ \ ~ ~ ( ~ `~ ~ ~ h A ~ e i r 4 a ~~ ~ ~O n sl t ,' ~ : a ~ ~ r ~ i = ~ y " o~a s ,~ _~ jl ~ ~ W a - ~ O ~c 0 CyS~ ~~fE§i ~~y9~ ~~59' ~ ~ I ~ O y • ! I ~ O . ft~ $YBN ~~h:~~6~~~e~4¢;~ s F y~ o~~~~~ a~~~~~ ~~ '~y~ j1A ----~' ~; ps~q ~_~~~ E~e~~s `'~~~ k 2 „ 6 s~ d o o ~ 5 ° °.o q ~ h 0 0 ~ O `~ ~~h I o ~ --r ~ I - Zy ~ ~ If . .f f f~i ~ e f" ~i ~° ~Q` 9 ! y t g¢ j~ 4 yfi Ce : 5 ~ ~°i~ $O~~ ~e~3 ~0q :1 ~}•~l! ~f ~,T+l!!Ii ~;f S 3i •+ Bi... pI 'r ~9 ~°9 ~~~$~~ ~9s ~~~~ i ~ uN! ~~~ ~Ile:o~ ! I I•I~I`i ~~~fls:eif, ~ ~ ~ ~ Z I g ' a ~ ~j Sg ~~ ~i ~l ~ ~ ~~ g` s ~ gSa~ ii I{ ~ ~ ~.6 .~ '' e ° 9'i s I I ! b ' ; r~~~~ i ~ f ~I iA I 1 ----1 := B i ~ a ~: 1 ----1 ~-- ~ ~ I. ~I a 0 ~ ~~ ~~ sue,,,, a ''C °'lJ ~ y 'O b ~~ t~^ 9 '-noTfDUN-OR7'oN BNCINBBRING COE(PANY ®<<° I EMERSON PARK SUBDIN[SION suavcroea uo nuaas auon n~mrtan _ , w ` ' " ~~ PRELIMINARY PLAT ~:' ~-~ ~ ° ~.. ~' ~ ~~ '~ ° °' 1 , ,~ ,; g MPP-07-014/Emerson Park Commercial Request for Appeal of Staff Decision Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACRD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply, and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 9 MPP-07-014/Emerson Park Commercial Ada County Utility Coordinating Council Developer/Local Improvement District Right of Way Improvements Guideline Request Purpose: To develop the necessary avenue for proper notification to utilities of local highway and road improvements, to help the utilities in budgeting and to clarify the already existing process. 1) Notification: Within five (5) working days upon notification of required right of way improvements by Highway entities, developers shall provide written notification to the affected utility owners and the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to, project limits, scope of roadway improvements/project, anticipated construction dates, and any portions critical to the right of way improvements and coordination of utilities. 2) Plan Review: The developer shall provide the highway entities and all utility owners with preliminary project plans and schedule a plan review conference. Depending on the scale of utility improvements, a plan review conference may not be necessary, as determined by the utility owners. Conference notification shall also be sent to the UCC. During the review meeting the developer shall notify utilities of the status of right of way/easement acquisition necessary for their project. At the plan review conference each company shalt have the right to appeal, adjust and/or negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter of review indicating the costs and time required for relocation of its facilities. Said letter of review is to be provided within thirty calendar days after the date of the plan review conference. 3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary plans. Utilities may request an updated plan review meeting if revisions are made in the preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days after receiving the revisions to review and comment thereon. 4) Final Notification: The developer will provide highway entities, utility owners and the UCC with final notification of its intent to proceed with right of way improvements and include the anticipated date work will commence. This notification shall indicate that the work to be performed shall be pursuant to final approved plans by the highway entity. The developer shall schedule a preconstruction meeting prior to right of way improvements. Utility relocation activity shall be completed within the times established during the preconstruction meeting, unless otherwise agreed upon. Notification to the Ada County UCC can be sent to: 50 S. Cole Rd. Boise 83707, or Visit iducc.com for a-mail notification information. 10 MPP-07-014/Emerson Park Commercial Development Process Checklist ®Submit a development application to a City or to the County ®The City or the County will transmit the development application to ACRD ®The ACHD Planning Review Division will receive the development application to review ®The Planning Review Division will do one of the following: ^Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time ^Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ®Write a Staff Level .report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ^Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ^The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ^For ALL development applications, including those receiving a "No Review" or "Comply With" letter: • The applicant should submit one (1) set of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of--way, including, but not limited to, driveway approaches, street improvements and utility cuts. ^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) ^ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ^ Working in the ACHD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACRD Construction -Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative 8 Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ^ Sediment 8~ Erosion Submittal • At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACRD Construction -Subdivision to be reviewed and approved by the ACHD Drainage Division. ^ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ^ Final Approval from Development Services ACHD Construction -Subdivision must have received approval from Development Services prior to scheduling aPre-Con. 11 MPP-07-014/Emerson Park Commercial