ACHD Comments~~~3 c ~io~wa,,.~. ~ed~o ~-icG August 9, 2007 To: DMB Management, LLC 250 S. Beechwood, #120 Boise, Idaho 83709 Subject: Pinebridge Subdivision/MPP-07-008/MRZ-07-010/MAZ-07-006 qll~ John S. Franden, President Rebecca W. Arnold, Vice President Sherry R. Huber, Commissioner Dave Bivens, Commissioner Carol A. McKee, Commissioner E~J~ AUG 2 3 2Q07 Litt' of Meridian City Clerk Office On August 8, 2007, the Ada County Highway District Commission acted on your application for the above referenced project. The attached report lists site-specific requirements, conditions of approval and street improvements, which are required. Please see page 6 of the attached staff report for information regarding the existing and projected level of service for the Eagle/Fairview Avenue intersection. If you have any questions, please feel free to contact me at 208-387-6171. Sincerely, Lori Den Hartog Planning Review Supervisor Right-of-Way & Development Services CC: Project file, Construction Services, Utilities City of Meridian Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us s ~~~`~~ "~ C D Project/File: Pinebridge Subdivision-MPP-07-008/MRZ-07-010/MAZ-07-006 This is an annexation, zoning, and preliminary plat application for the development of a mixed use subdivision with 61 building lots on approximately 170-acres. Lead Agency: City of Meridian Site address: South of Fairview, east of Locust Grove, & west of Eagle Road Commission Approval: August 8, 2007 Regular Agenda This item was on the regular agenda to discuss a new proposed signalized intersection on Fairview Avenue. See Finding for Consideration #2. Applicant: DMB Management, LLC 250 S. Beechwood, #120 Boise, Idaho 83709 Representative: Stanley Consultants 1940 S. Bonito Way, #140 Meridian, Idaho 83642 Staff Contact: Lori Den Hartog Phone: 387-6171 E-mail: Idenhartog(c~achd.ada. id. us Tech Review: July 19, 2007 Application Information: Acreage: 170 Current Zoning: RUT & I-L Proposed Zoning: C-G Residential units: 850 Retail/Commercial Square footage: 550,000 Office Square footage: 1,800,000 Common Lots: 21 Right-of-Way & Development Services Department Pinebridge-MPP-07-008/M RZ-07-010/MAZ-07-006 A. Findings of Fact Existing Conditions Site Information: The site is primarily vacant and undeveloped. Description of Adjacent Surrounding Area: Direction Land Use Zonin North Retail/Commercial L-O & C-G South Li ht Industrial I-L East Retail/Commercial/Office C-G West Residential & Commercial R-8 & C-G P i n e b ri d g e-M P P-07-008/M RZ-07-010/MAZ-07-006 3. Existing Roadway Improvements and Right-of-Way Adjacent To and Near the Site • Fairview Avenue is currently improved with 4 traffic lanes, a center left turn lane, and no curb gutter or sidewalk abutting the site. East of the site, Fairview Avenue is improved with 5 traffic lanes, a center left turn lane, and curb, gutter, and sidewalk abutting the developed properties. • Eagle Road (SH 55) is currently improved with 4 traffic lanes, a center left turn lane, and no curb, gutter, or sidewalk abutting the site. North of the site, Eagle Road is improved with 6 to 7 traffic lanes, a center left turn lane, and sidewalks abutting the developed properties. Eagle Road is a state highway under the jurisdiction of the Idaho Transportation Department. • Locust Grove Road is currently under construction abutting the site. The roadway was previously a 2 to 3 lane roadway. The construction project is widening the roadway to a 5-lane urban street section. • Pine Avenue is currently improved with 2 traffic lanes, and curb, gutter, and sidewalk abutting the developed properties. • Hickory Avenue is currently improved with 2 traffic lanes (to a commercial street standard), a center turn lane, and curb, gutter, and sidewalk. The site has no frontage on Hickory Avenue. • State Avenue is currently improved with 2 traffic lanes (to a commercial street standard), a center turn lane, and curb, gutter, and sidewalk. State Avenue exists as a stub street to this site's east property line. • Webb Street and. Machine Street are existing commercial/industrial stub streets to this site's south property line. These roadways are improved to a commercial/industrial standard with no sidewalk. • Commercial Court is an existing private road at this site's south property line that intersects Eagle Road. 4. Existing Intersection Configurations • Fairview Avenue/Locust Grove Road intersection is a signalized intersection with left turn lanes on all approaches and a right turn lane on the east-west approaches. • Fairview Avenue/Hickory intersection is a signalized intersection with left turn lanes turn lanes on all approaches, a single through lane on the north-south approaches, and 2 thru lanes on the east-west approaches. • Fairview Avenue/Eagle Road intersection is a signalized intersection with dual left turn lanes on all approaches, exclusive right turn lanes on all approaches, 3 thru lanes on the west to east leg, and 2 thru lanes on all other approaches. • Eagle Road/Pine Avenue intersection is a signalized intersection with dual left turn lanes on all approaches and a right turn lane on the east-west approaches. • Pine Street/Hickory Avenue intersection is astop-controlled T-intersection with Hickory Avenue having the STOP. 5. Existing Access: There currently is access to the site from Locust Grove, Fairview Avenue, Pine Avenue, Commercial Court and Eagle Road. 3 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 6. Site History: ACRD previously reviewed this site in May 2005. The previous application was withdrawn from the City of Meridian. The new application includes additional acreage that was not part of the first application. Development Impacts 7. Trip Generation: This development is estimated to generate 37,270 additional vehicle trips per day based on the submitted traffic impact study. See Finding for Consideration #1 below for a summary of the traffic impact study findings. 8. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 9. Impacted Roadways: Roadway Frontage Functional Traffic Count* Level of Projected level of Speed Classification Service** Service at Build- Limit Out 2015 Fairview 880' Principal Arterial 37,198 east of "E" "C" 40 MPH Locust Grove (assumes 7-lanes in Ma 2006 at build-out Locust 660' Minor Arterial 10,027 south Currently "C" 35 MPH Grove of Fairview in under June 2005 construction Pine 4,400' Minor Arterial 2,376 west of Better than Better than "C" Eagle Road in "C" March 2006 Eagle 860' Principal Arterial 51,580 south "F" (See "F" 50 MPH (SH 55) of Fairview in Note below) October 2006 Hickory 0' Local/Commercial 2,962 south of Better than "C" Fairview in "C" March 2006 *Traffic Count Note: Due to significant construction in the area on parallel and connecting routes, not all traffic counts provided are within one year of the application hearing; however, the counts identified above are accurate and are within 18 months of the application hearing. **Acceptable level of service for a five lane principal arterial roadway (Fairview) is "E" (37,000 ADT). **Acceptable level of service for a five lane minor arterial roadway (Locust Grove and Pine assuming completed improvements) is "D" (33,000 ADT). **Acceptable level of service for seven lane principal arterial roadway (Eagle Road north of Pine) is "E" (50,000 ADT). Note: This is based on the COMPASS Planning Thresholds. 10. Capital Improvements Plan/Five Year Work Program The following improvements are scheduled in the District's Five Year Work Program: • Locust Grove Road is currently under construction between Franklin Road and Fairview Avenue for widening to a 5 lane roadway. The following improvements are scheduled in the District's 20-Year Capital Improvements Plan • Fairview Avenue from Locust Grove to Cloverdale is scheduled to be widened to 7-lanes between 2013 and 2017. 4 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 • Pine Avenue from Locust Grove to Eagle Road is scheduled to be widened to 5-lanes between 2013 and 2017. • The intersection of Locust Grove/Fairview Avenue is scheduled to be widened between 2018 and 2027 to include 7 lanes on the north and south legs, 8 lanes on the west leg, and 9 lanes on the east leg. B. Findings for Consideration Traffic Impact Study Dobie Engineering, Inc. prepared a traffic impact study for the Pinebridge mixed use development. Below is a summary of the findings submitted by the applicant's consultant: • At full build-out the site development will produce a total driveway volume of approximately 37,270 vehicles per day with a PM peak hour loading of over 3,880 per hour. The site will contribute 32,330 new trips per day to the system roads. Projected build out year is 2015. • The proposed site access plan includes one new collector access to Fairview Avenue, a commercial access to Locust Grove Road and the extension of Pine Avenue between Eagle and Locust Grove. A small portion of the site traffic is also assigned to Commercial Court, Hickory Avenue, and Wilson Lane. • The arterial intersections now operate with moderate traffic congestion. Extensive modification to the existing roadways and arterial intersections will be needed to accommodate projected regional traffic volumes through the year 2015. • The eastbound Pine Avenue approach to Eagle. Road will receive sufficient turning traffic to warrant a separate right-turn lane and signal phase. • Anew signal at the Pinebridge/Fairview intersection will be required in conjunctions with the first phase of development. • A traffic signal will be needed at the Pine Avenue/Hickory Avenue intersection at full build out of Pinebridge. • Approximately 42% of the site traffic is distributed to Eagle Road via Pine Avenue and Commercial Court. Approximately 26% of the site traffic is distributed north to Fairview Avenue, and the remaining 32% is distributed west to Locust Grove Road. Staff Comment: In review of the submitted traffic impact study, District Traffic Services and Planning Review staff noted some potential discrepancies in the submitted traffic impact study analysis regarding the existing and projected levels of service at the Fairview/Eagle and Eagle/Pine intersections. The table below includes the consultants analysis and ACHD staff's analysis regarding the level of service at those intersections. 5 Pinebrid~le-MPP-07-008/MRZ-07-010/MAZ-07-006 Intersection Existing Level of Planned or Proposed Projected Level of Service Service* Improvement (with site traffic including planned/proposed Im rovement Fairview/Locust "E" Widen intersection "D" Grove (Acceptable LOS is D) (scheduled in CIP (Acceptable LOS is D) between 2018 and 2027 Fairview/Hickory Better than "C" None "D" (Acceptable LOS is D) Fairview/Eagle "E"-Consultant None "E"-Consultant "F'=ACRD "F =ACRD 108.2 seconds of 186.9 seconds of delay delay Acce table LOS is E Acce table LOS is E Eagle/Pine "D"-Consultant None "E" -Consultant "E"-ACRD "F"ACRD 68.2 seconds of delay 162.3 seconds of delay Acce table LOS is E Acce table LOS is E Pine/Hickory Better than "C" Signalized "C" Pine/Pinebridge n/a Roundabout Roundabout analysis not (new intersection) submitted Fairview/Pinebridge n/a Signalized "C" (new intersection) LOS "F" without signal (The Pinebridge leg of the intersection is driving the ro'ected LOS "F" Staff Comment/Recommendation: The District recognizes that the existing and projected level of service at the Eagle/Fairview intersection is above an acceptable planning level capacity. Previously this intersection was identified as a future urban interchange. In the last update to the long-range transportation plan prepared by COMPASS, this urban interchange improvement was removed from the plan. Eagle Road is a state highway, and the Idaho Transportation Department has limited plans for improvements to this corridor (i.e. center islands for access control). There are no planned capacity improvements for this corridor. The District also recognizes that the Eagle/Pine intersection is projected to be above an acceptable planning level capacity. The Idaho Transportation Department does not have capacity improvements planned for this intersection, and the District does not have the ability to require such improvements. The Eagle Road legs of this intersection are the driving factors in the projected level of service. The improvement requirements identified in other sections of this staff report are intended to improve the Pine Avenue legs of the intersection. 6 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 2. Fairview Avenue/Pinebridge Intersection (proposed signalization) Arterial Street Policy: District policy 7202.5 states that local traffic circulation systems in land developments should not reduce the efficiency of nearby major streets. The District will consider full or partial control of driveways, intersection placement and access to protect the efficiency of the arterial street network. District Signal Spacing Policy: District policy 7204.11.6 states that the optimum spacing for collector intersections along arterials is 1,700-feet to allow adequate signal spacing. The minimum spacing that is acceptable for collector intersections along arterials is 1,300-feet. Applicant Proposal: The applicant is proposing to construct a collector roadway, Pinebridge Avenue, to intersect Fairview Avenue approximately in the center of the site's frontage. The roadway is proposed to align with a commercial driveway on the north side of the roadway. The commercial driveway serves a strip mall and a limited number of commercial and retail buildings. The applicant is proposing to signalize this intersection. In addition to the submitted traffic impact study, the applicant sought a second analysis of the proposed Pinebridge/Fairview signalized intersection and its impacts on the Fairview Avenue corridor. Below is a summary of the analysis prepared by Gary Funkhouser of Stanley Consultants. • Three scenarios were studied: o Base scenario assumes that the Fairview Avenue/Pinebridge intersection will not be constructed. o Scenario 1 assumes that the Fairivew Avenue/Pinebridge intersection will be constructed as asignal-controlled intersection. o Scenario 2 assumes that the Fairview Avenue/Pinebridge intersection will be constructed as an unsignalized intersection. • .All three signal coordinate scenarios were analyzed under 2015 PM peak total traffic conditions. The table below summarizes the arterial average speed estimate for the Fairview Avenue corridor between Locust Grove Road and Records Avenue by direction. The average speed is the link distance divided by the travel time including delays. The average speed for the corridor is approximately 20 mph without the Pinebridge Drive intersection. With the Pinebridge Drive intersection, the average speed for the corridor is projected to increase slightly, one mph increase if Pinebridge is signalized and three mph increase for the westbound direction if unsignalized. The average speed increase with the Pinebridge intersection is probably due to more platooning and shifting some of the traffic off Locust Grove and Hickory Avenue. C cle Len th 90/180 seconds Eastbound Westbound Base Scenario 20 20 Scenario 1 21 21 Scenario 2 20 23 Staff Comment/Recommendation: The proposed signalized intersection is located approximately 2,050-feet (0.39 miles) east of the signalized intersection with Locust Grove Road, and approximately 1,525-feet (0.29 miles) west of the signalized intersection with Hickory Avenue. The Hickory Avenue/Fairview Avenue signalized intersection is located approximately 1,700-feet west of the Fairview/Eagle Road signalized intersection. District staff recommends against the approval of an additional signal on Fairview Avenue for the following reasons: • The Fairview Avenue Corridor is a critical east-west principal arterial, and modifications to access control via signalization should be considered in the larger context, not just as it relates to the access for one particular development and must consider the impacts to the 7 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 arterial system. A traffic control signal should not be installed if it will seriously disrupt progressive traffic flow. • A signal in this location does not provide significant benefits to the north side of Fairview Avenue (see maps below). Staff believes that if an additional signal where to be installed along this corridor, that it should provide benefits to both sides of Fairview Avenue. The Manual on Uniform Traffic Control Devices (MUTCD) provides guidance for the installation of traffic signals o The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal. A traffic control signal should not be installed unless an engineering study indicates that installing a traffic control signal will improve the overall safety and/or operation of the intersection. The following information is provided from the Transportation Research Board (TRB) Access Management Manual: o (Table 2-7) A 16% increase in travel time with four signals per mile compared to 2 signals per mile. (3 signals per mile is a 9% increase). Based on that information, the addition of the proposed signal at the Pinebridge/Fairview intersection would increase the travel time by approximately 9% on Fairview Avenue. o Figure 9-3-Several studies have found that the number of crashes and crash rates increases as the frequency of traffic signals increase. o Figure 9-2 shows a 20 mph progression speed fora 120 second cycle and 1/3 mile signal spacing (Fairview is posted 40 mph) • This would be the only mile segment of Fairview Avenue between Main Street (Meridian) and Curtis Road (Boise)- a seven mile segment-that would have more than two signals per mile. • There are multiple roadway connections into and out of this area, including Pine Street, Locust Grove Road, Eagle Road, and Fairview Avenue, that provide a multitude of options for the motorists utilizing this development. (i.e westbound traffic could leave the site via Shellbrook Street to Locust Grove or Pine Avenue without the need to make a westbound left turn on Fairview Avenue) In the review of the Fairview Avenue analysis submitted by Stanley Consultants, District staff identified that the analysis was based on ideal conditions and not actual conditions. The speed limits used in the analysis for the intersecting roadways (Locust Grove and Eagle Road) were incorrect. In addition, the signal cycle lengths for the intersections were not correct. The District just completed a re-timing of the signal cycles on Eagle Road, and the cycle lengths that have been implemented are not intended to be altered for that corridor. The District's signal spacing policy is based on optimum conditions for uniform intersection spacing and uniform cycle length. The consultant's analysis assumes both of these conditions; however, it is impossible to achieve the uniform intersection spacing due to the existing signalized intersections. In addition, a uniform cycle length is also impossible to achieve due to the needs of the Eagle Road Corridor and particularly the needs of the cycle length for the Eagle/Fairview intersection. Even slight deviations from these uniform intersection spacing and cycle lengths results in inefficiencies for the arterial corridor. • The Fairview Avenue analysis also shows an increase in the travel speed of 2 mph in the westbound direction (which is the peak direction in the PM) without the signal. The consultant identifies this as insignificant; however, the signal timing studies that the District 8 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 has completed in Downtown Meridian, Downtown Boise, and Downtown Eagle do not support that conclusion. The studies show that the even the slightest increase in travel speed shows a significant benefit in fuel savings, number of stops, and delay savings. For example, the District's Eagle Road study showed an increase in northbound speed from only 24 mph to 26 mph but showed a substantial decrease in travel time and delay which corresponds to substantial savings for the traveling public. The savings shown in the report for westbound Fairview Avenue are a decrease in delay from 200 seconds to 166 seconds per vehicle and a decrease in travel time from 413 seconds to 378 seconds per vehicle. Commission Hearing and Action: On August 8, 2007, the ACRD Commission heard testimony from staff, the applicant, and the applicant's traffic engineers. The Commission determined that approving a signal at this location at this time would be premature and could possibly create negative impacts to the Fairview Avenue Corridor. The Commission determined that there were a number factors with unknown outcomes that could substantially impact this site and the surrounding roadway systems. These factors include the extension of Pine Avenue through the site to Nola Road, the widening of Locust Grove Road, the new Locust Grove Road intersection, the various local street connections (Wilson Lane, Hickory Street, etc.), and the Fairview Avenue Corridor Study. During the course of the hearing the applicant presented an alternative alignment of the Pinebridge/Fairview Avenue intersection. The applicant proposed to shift the main roadway to the west, approximately 265-feet to achieve an alignment with the main driveway for the Oakbrook. This location creates a more uniform distance between the existing signal, and if the intersection is signalized in the future, the more westerly alignment is better for signal coordination. Under the following circumstances, the ACHD Commission may reconsider the future signalization of the Pinebridge/Fairview Avenue intersection: • Align the Pinebridge access at Fairview Avenue with main driveway for Oakbrook Plaza (a shift of approximately 265-feet to the west from the original proposed location) • The applicant installs at his own cost and risk, signal conduit under the Pinebridge Avenue roadway. • All the public street connections in the area are made: Locust Grove overpass, Pine Avenue to Nola Road, Wilson Lane from the site to Locust Grove Road, and Hickory Street to Commercial Court. • The completion of the Fairview Avenue Corridor Study (approximately 18-24 months from summer of 2007) which may include recommendations for signalized intersections and access control strategies. Only if findings of the Fairview Avenue Corridor Study are consistent with the proposal for the signalized intersection, will the applicant be able to proceed with the request. Only when all of the above have been completed, will the applicant be able to present before the Commission again regarding the proposal to signalize the Pinebridge/Fairview Avenue intersection. If the Commission approves a signal in the future, all of the associated costs (design, materials, construction, and installation) will be the responsibility of the applicant. 3. Fairview Avenue Right-of-Way Policy: District policy requires 120-feet of right-of-way for 7-lane principal arterial roadways (Figure 72-F1 B). This right-of--way width allows for the construction of a 7-lane roadway with curb, gutter, and 5-foot detached sidewalks. Sidewalk Policy: District policy requires 7-foot wide attached (or 5-foot detached) concrete sidewalk on all collector roadways and arterial roadways (7204.7.2). 9 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 Staff Comment/Recommendation: Due to the proposed accesses on Fairview Avenue and the District's plans in the CIP for Fairview Avenue, staff recommends that the applicant construct the additional third lane of Fairview Avenue abutting the site. A majority of the properties along the south side of Fairview Avenue between this site and Eagle Road have constructed this third lane. The construction of the lane is impact fee eligible and the applicant can be reimbursed for the costs. In addition, the additional lane can serve as an interim deceleration/acceleration lane for the access points on Fairview Avenue. The applicant will be required to construct a 7-foot attached (or 5-foot detached) concrete sidewalk on Fairview Avenue abutting the site. 4. Locust Grove Road Right-of-Way and Street Section Policy: District policy requires 96-feet of right-of-way on arterial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks and bike lanes. Staff Comment/Recommendation: Locust Grove Road from Nola to Fairview Avenue is currently under construction. The project is widening the roadway to 5-lanes with vertical curb, gutter, and sidewalk. No additional improvements to this site's frontage will be required at this time. 5. Pine Avenue Right-of-Way and Street Section Policy: District policy requires 96-feet of right-of-way on arterial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks and bike lanes. Applicant Proposal: The applicant is proposing to enter into a cooperative agreement with the District to dedicate the right-of-way and construct Pine Avenue through the site, from Eagle Road to Nola Road, as a complete 5-lane roadway. The applicant is proposing a standard 72-foot street section within 96-feet of right-of-way. The applicant is proposing 5-foot landscape strips and 5-foot detached sidewalks. Staff Comment/Recommendation: Pine Avenue is classified as a minor arterial and is identified in the District's Capital Improvements Plan for widening to a 5-lane section between 2013 and 2017. Staff is supportive of working with the applicant to expedite the construction of this roadway. The development necessitates the need for atwo-lane arterial roadway through the site. The District will work with the applicant to negotiate the construction of the complete 5-lane roadway with vertical curb and gutter, all of which are impact fee eligible improvements. The applicant's proposal for the roadway design meets District policy with the exception of the 5- foot landscape strip. If the applicant intends to plant trees within this landscape strip, it will have been widened to either 6-feet or 8-feet in accordance with the District's interim tree planter policy. Based on the recommendation in the submitted TIS and in order to mirror the east leg of the intersection, the District will require right-of-way and construction for Pine Avenue sufficient for 7- lanes at the intersection with Eagle Road. In order to properly mirror the east leg of the intersection, the applicant will be responsible for reconstruction of the north side of Pine Avenue abutting the Blue Cross site. This will involve re-location of the existing curb, gutter, and sidewalk approximately 5 to 7-feet to the north. In accordance with the submitted TIS, dedicate sufficient right-of-way and construct a separate right-turn lane on the eastbound Pine Avenue approach to Eagle Road. 10 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 6. Pine Avenue/Hickory Avenue Intersection Staff Comment/Recommendation: The submitted TIS identifies the need to signalize the intersection of Pine Avenue and Hickory Avenue. This intersection is located approximately 2,000- feet west of Eagle Road, and staff supports the signalization if the applicant extends a public street (Hickory Avenue, as a commercial street) south of Pine Avenue to serve the south side of the roadway to intersect Commercial Court. This will provide public street access to the signalized intersection of Pine/Eagle for the properties on the south side of Commercial Court. The applicant will be responsible for the design, materials, construction, and installation of the signal at this intersection. The District will require that the applicant install the conduit and poles at the time of construction; however, the mast arms and signal heads will be installed by the District when the signal meets traffic warrants. The applicant should pay for the cost of all of the signal equipment at the time the poles are installed. 7. Locust Grove Road/Shellbrook Street Intersection Applicant Proposal: The applicant is proposing a collector street, Shellbrook Street, to intersect Locust Grove Road in alignment with an existing local street on the west side of Locust Grove Road. In a technical review meeting with staff, the applicant discussed the possibility of signalizing this intersection in the future. Staff Comment/Recommendation: The submitted traffic impact study did not identify the need for a signal in this location, and staff is not supportive of a signal at this intersection. Therefore, staff recommends that Shellbrook Street be shifted south to intersect Locust Grove Road between the two local streets on the west side of Locust Grove Road. This will create a T-type intersection with Locust Grove Road. 8. Commercial Court Applicant Proposal: The applicant is proposing to utilize Commercial Court for access to Eagle Road and for site circulation. Commercial Court is an existing private roadway. Based on the previous application, Commercial Court is approved only for aright-in/right-out access to Eagle Road. Staff Comment/Recommendation: Commercial Court was constructed as a private roadway and was not constructed to ACHD standards. The applicant has discussed the possibility of converting Commercial Court to a public roadway. Based on previous proposals and research conducted by ACHD staff, significant re-construction of the roadway and drainage system would have to occur prior to the District considering accepting the roadway as public. The applicant would be required to follow the District's Interim Policy for converting the roadway to public standards if the applicant desires the roadway to be public. Staff recommends that the City and ITD require the applicant to install a center median on Eagle Road to restrict Commercial Court to right-in/right-out. 9. Roundabouts Applicant Proposal: The applicant has proposed two roundabouts within the development. One at the intersection of State Street/Pinebridge Avenue and one at the intersection of Pinebridge Avenue/Pine Avenue. Staff Comment/Recommendation: The submitted TIS states that a detailed roundabout evaluation will be submitted for these intersections. The District has not received such an evaluation and is unable to approve the roundabouts at this time. Staff is conceptually supportive of the roundabout locations; however, more information is needed before granting specific approval for this traffic control device. Staff recommends that the detailed analysis be required prior to design 11 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 and construction of the intersections or signature of a final plat. If the staff review of the analysis determines that a roundabout is not appropriate, further analysis will be required to determine the appropriate intersection control prior to design and construction of the intersections or signature of a final plat. 10. Internal Streets Collector Roadway Policy: District policy 72-F1 B requires collector roadways to be constructed as 46-foot street sections with vertical curb, gutter, and 5-foot detached (or 7-foot attached) concrete sidewalks within 70-feet of right-of-way. This street section allows for the construction of a 3-lane roadway with bike lanes. Commercial Roadway Policy: District policy requires 54-feet of right-of--way on industrial/commercial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 3-lane roadway (40-foot street section) with curb, gutter and 5-foot wide concrete sidewalks. Island Policy: District policy 7202.7 and 7207.5 require islands to be constructed a minimum of 4- feet wide with a minimum area of 100-square feet and designed to safely channel traffic. The roadway on either side of the traffic island should maintain a minimum of a 21-foot street section. Applicant Proposal (Internal streets): The applicant has proposed to construct the following internal roadways as collector roadways with standard 46-foot street sections with vertical curb, gutter, and 7-foot attached sidewalks: • Pinebridge Avenue-includes center landscape islands with 21-foot street sections on either side • Shellbrook Street • E. State Avenue • Webb Avenue • Machine Avenue • Wilson Lane Staff Comment/Recommendation: The applicant's proposal for the internal street sections meets District policy. State Avenue, Webb Avenue, Machine Avenue, and Wilson Lane may be constructed as 40-foot commercial roadways within 54-feet of right-of-way complete with vertical curb, gutter and sidewalk. In discussions with District staff, the applicant has agreed to re-design the large extended center island within Shellbrook Street to more clearly direct the public traffic. The island is intended to accommodate the community center and associated facilities for the multi-family development. With the re-design there will no longer be a public street on the northern side of the island. 11. Access/Driveways-Fairview Avenue, Pine Avenue, and Locust Grove Access Management Policy: District policy 7207.8 states that direct access to arterials and collectors is normally restricted. The developer shall try to use combined access points. If the developer can show that the use of a combined access point to a collector or arterial street is impractical, the District may consider direct access points. Access points for proposed developments at intersections should be located as far from the intersection as practical, and in no case closer than as illustrated on Figure 72-F4, unless a waiver for the access point has been approved by the District Commission. Successive Driveway Policy: District policy 72-F5, requires driveways located on collector or arterial roadways with a speed limit of 40 to align or offset a minimum of 185-feet from any existing or proposed driveway. 12 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 Width and Design Policy: District policy 7207.9.3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 36-feet. Most commercial driveways will be constructed as curb-cut type facilities if located on local streets. Curb return type driveways with 15- foot radii will be required for driveways accessing collector and arterial roadways. Applicant Proposal for Fairview Avenue Drivewavs: The applicant has proposed two full access driveways on Fairview Avenue in addition to the proposed street intersection (Pinebridge Avenue). The first driveway is located at the east property line, approximately 100-feet east of an existing driveway on the south side of the roadway. The second driveway on Fairview Avenue is located at the west property line 190-feet west of a proposed driveway on the south side of the roadway. Staff Comment/Recommendation for Fairview Avenue Driveways: Due to the District's access management policy, the widening plan for Fairview Avenue, and the location of the proposed driveways, staff recommends the two proposed driveways on Fairview Avenue be approved as right-in/right-out only driveways. The applicant should be required to install a 6-inch raised concrete median on Fairview Avenue to prevent the left-in/left-out turning movements. Applicant Proposal for Pine Avenue Drivewavs: The applicant has proposed six driveways on the south side of Pine Avenue and two driveways on the north side of Pine Avenue. The first driveway on Pine Avenue is proposed to be a right-in/right-out turn located approximately 250-feet west of Eagle Road. The second driveway is proposed in alignment with Rosario Street. The third driveway on the south side of Pine Avenue is proposed approximately 125-feet east of the Pinebridge/Pine roundabout intersection. There are three driveways proposed on the south side of Pine between Webb Avenue and Nola Road. The first proposed driveway on the north side of Pine Avenue is in alignment with Machine Avenue. The second proposed driveway on the north side of Pine is located approximately 180-feet west of the first proposed driveway. Staff Comment/Recommendation for Pine Avenue Driveways: District staff is supportive of the applicant's proposal for only two driveways on the south side of Pine between Eagle Road and Hickory Avenue. The location of the right-in/right-out driveway should be shifted west if the access is located within the required right-turn lane of the intersection. The applicant should coordinate the design of the intersection and the access location with District Traffic Services and Planning Review staff. If Blue Cross re-locates their driveway (on the north side of Pine Avenue) further west from the Pine/Eagle intersection, the applicant may align with that access in order to have afull-access driveway. Staff is supportive of the proposed full-access driveway in alignment with Rosario Street Staff is supportive of one full-access driveway on the south side of Pine centered between the Pinebridge/Pine roundabout and the Pine/Newbridge intersection. Staff is supportive of one full-access driveway on the south side of Pine centered between the Nola/Pine intersection and the Pine/Pinebridge roundabout. Staff is supportive of the full access driveway on the north side of Pine in alignment with Machine Avenue. Staff is supportive of one full access driveway on the north side of Pine in alignment with Newbridge Place. 13 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 Applicant Proposal for Locust Grove Road Driveways• Other than the Shellbrook Street intersection (in alignment with Shellbrook on the west side of Locust Grove), the applicant has not proposed any driveways on Locust Grove Road. Staff Comment/Recommendation for Locust Grove Driveways: Staff is supportive of the applicant's proposal for no direct lot access to Locust Grove with this application. 12. Access/Driveways-Pinebridge Avenue, Shellbrook Street, and locals Successive Driveway Policy (Pinebridge and Shellbrook): District policy 72-F5, requires driveways located on collector or arterial roadways with a speed limit of 30 to align or offset a minimum of 125-feet from any existing or proposed driveway. Local Streets (State, Webb, Machine, and Wilson): District policy 72-F4 (1) and 72-F4 (2), requires driveways located on commercial/industrial roadways to offset a controlled and/or uncontrolled intersection a minimum of 50-feet (measured near edge to near edge). Staff Comment/Recommendation: The driveways on the following roadways should be located in accordance with District policy: • Pinebridge Avenue • Shellbrook Street • E. State Avenue • Webb Avenue • Machine Avenue • Wilson Lane 13. Stub Streets Stub Street Policy: District policy 7203.5.1 states that the street design in a proposed development shall cause no undue hardship to adjoining property. An adequate and convenient access to adjoining property for use in future development may be required. If a street ends at the development boundary, it shall meet the requirements of sub section 7205, "non-continuous streets." District policy 7205.5 states that stub streets will be required to provide intra-neighborhood circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7204.5, 7204.6 and 7204.7, except a temporary cul-de-sac will not be required if the stub street has a length no greater than 150-feet. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." Applicant Proposal: The applicant has proposed to extend one stub street from the east (E. State Street) and two from the south (Webb Avenue and Machine Avenue). The applicant is proposing one new stub street to the west (Wilson Lane). Staff Comment/Recommendation: The applicant's proposal for extending existing stub streets and constructing one new stub street meets District policy and should be approved with this application. 14. Tree Planters Tree Planter Policy: The District's Tree Planter Width Interim Policy prohibits all trees in planters less than 6-feet in width. In addition to prohibiting trees in planters less than 6-feet in width, the policy requires a minimum planter width of 6-feet for class II tress with the installation of root barriers on both sides of the planter strip or a minimum planter width of 8-feet without the installation of a root barrier. The policy also requires Class I and Class III trees to provide a minimum planter width of 10-feet. 14 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 15. Other Access Fairview Avenue is classified as a principal arterial roadway and Locust Grove Road and Pine Avenue are classified as minor arterial roadways. Other than the access specifically approved with this application, direct lot access is prohibited to these roadways and should be noted on the final plat. C. Site Specific Conditions of Approval Dedicate 60-feet of right-of-way from the section line of Fairview Avenue abutting the parcel. The right-of-way purchase and sale agreement and deed must be completed and signed by the applicant prior to scheduling the final plat for signature by the ACHD Commission or prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The District will purchase the right-of-way which is in addition to existing right-of-way from available Corridor Preservation Funds. 2. Construct the additional third travel lane of Fairview Avenue abutting the site with pavement widening, vertical curb, and gutter. The construction of this lane is impact fee eligible and the applicant can be reimbursed for the costs associated with the construction of the third lane. 3. Construct a 7-foot attached (or 5-foot detached) concrete sidewalk on Fairview Avenue abutting the site. 4. Enter into a cooperative agreement with the District to dedicate the full right-of-way and construct Pine Avenue through the site, from Eagle Road to Nola Road, as a complete 5-lane roadway. This roadway shall be constructed as a standard 72-foot street section with vertical curb, gutter, and 7- foot attached concrete sidewalks (or 5-foot detached) within 96-feet of right-of-way. The complete 5-lane roadway with vertical curb and gutter are impact fee eligible improvements. The applicant is responsible for the cost designing and constructing the sidewalk and any landscaping improvements. 5. Construct Pine Avenue at its intersection with Eagle Road as a 7-lane roadway section to mirror the east leg of the intersection, in accordance with the submitted traffic impact study. Reconstruct the north side of Pine Avenue abutting the Blue Cross site to achieve the mirroring of the east leg, this will involve re-location of the existing curb, gutter, and sidewalk approximately 5 to 7-feet to the north. 6. Dedicate sufficient right-of-way and construct a separate right-turn lane on the eastbound Pine Avenue approach to Eagle Road. 7. Design, construct, and install a signal at the intersection of Pine Avenue and Hickory Avenue. Install the conduit and poles at the time of construction. When the signal meets traffic warrants the District will install the -mast arms and signal heads. The applicant is responsible for all costs associated with the design and construction of the signal and shall pay for the cost of all of the signal equipment at the time the poles are installed. 8. Extend and construct Hickory Avenue south of Pine Avenue to intersect Commercial Court. Hickory Avenue shall be constructed as a commercial roadway (40-foot street section with vertical curb, gutter, and 5-foot concrete sidewalk) within 54-feet of right-of-way. 9. Construct one collector roadway, Shellbrook Street, to intersect Locust Grove Road centered between the existing Shellbrook Street and Buchman Street on the west side of locust Grove Road to create a T-type intersection. Construct Shellbrook Street as a standard 46-foot collector street 15 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 section with vertical curb, gutter, and 5-foot detached (or 7-foot attached) concrete sidewalk. Re- design the large extended center island within Shellbrook Street to more clearly direct the public traffic; with the re-design there shall no longer be a public street on the northern side of the island. Coordinate the design with District Planning Review and Traffic Services staff. 10. Comply with the District's Interim Policy for converting private roadways to public standards if Commercial Court is intended to be converted to a public roadway. 11. Submit a detailed analysis of the proposed roundabouts for the State Street/Pinebridge Avenue and and the Pinebridge Avenue/Pine Avenue intersections prior to design and construction of the intersections or signature of a final plat. If the staff review of the analysis determines that a roundabout is not appropriate, further analysis will be required to determine the appropriate intersection control. 12. Construct State Avenue, Webb Avenue, Machine Avenue, and Wilson Lane as 40-foot commercial roadways within 54-feet of right-of-way complete with vertical curb, gutter and 5-foot concrete sidewalk. 13. Construct Pinebridge Avenue to intersect Fairview Avenue in alignment with the main driveway for Oakbrook Plaza on the north side of Fairview Avenue, approximately 265-feet west of the original proposal. Construct the roadway as a collector roadway with a standard 46-foot street section with vertical curb, gutter, and 7-foot attached sidewalks within 70-feet of right-of-way. Provide 21-foot street sections on either side of the proposed center landscape islands. 14. Construct two right-in/right-out only curb-return type driveways on Fairview Avenue, one located at the east property line and one located at the west property line. Install a 6-inch raised concrete median on Fairview Avenue to prevent the left-in/left-out turning movements for these driveways. 15. Construct the following curb return type driveways on Pine Avenue • Aright-in/right-out driveway located a minimum of 250-feet west of Eagle Road (measured near edge to near edge). Shift this access if it is located within the required right-turn lane of the intersection. • Afull-access driveway in alignment with Rosario Street. • Afull-access driveway on the south side of Pine centered between the Pinebridge/Pine roundabout and the Pine/Newbridge intersection. • Afull-access driveway on the south side of Pine centered between the Nola/Pine intersection and the Pine/Pinebridge roundabout. • A full access driveway on the north side of Pine in alignment with Machine Avenue. • A full access driveway on the north side of Pine in alignment with Newbridge Place. 16. Construct driveways on the following roadways in accordance with District policy: • Pinebridge Avenue • Shellbrook Street • E. State Avenue • Webb Avenue • Machine Avenue • Wilson Lane 17. Extend one stub street from the east (E. State Street) and two from the south (Webb Avenue and Machine Avenue). 16 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 18. Construct one new stub street to the west (Wilson Lane). Provide a temporary turnaround at the terminus of this stub street and install a sign stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." 19. Comply with all Standard Conditions of Approval. D. Standard Conditions of Approval Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. Private sewer or water systems are prohibited from being located within any ACHD roadway or right-of-way. 3. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. Comply with the District's Tree Planter Width Interim Policy. 6. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 7. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 8. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 9. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 10. Payment of applicable road impact fees are required prior to building construction. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 11. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACRD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 12. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 17 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 13. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. E. Conclusions of Law The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACRD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Site Plan 3. Request for Reconsideration Guidelines 4. Development Process Checklist 18 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 ~ 9 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 20 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 Ir ~ ///~ - ~ ., II ~ iii ~ 1 4 ~. ~ ~ ~~ ~ _ --~ ,--~_ -- U° ,~~ I I ~ / i J ui ~i-'~-' ~,-- ~ Vii; i ~-- ~ I i ~x i -_ ' ~ 6 i x.J .i~ I i i ~E _ _ ~, -- ~~ it ~,~$ ~ ~~ -_~ .. ..~ .... ~ '' . I oxw I ~ ~ ~a ~ ~~ _.... . _ - ~ OHNRXiHX ~ ~i ,~, wnw~ -tyy~Yy ;dii I;I~ ; Vie, ~ § I~i €€€€ F€€€€€€ ,,, ~~ ~. e ' ~~~ ... ~ iiil iiiiiiE iiii ~ I ~-. f~ ~ / i =® ~ ~ a ^ ~ ' ~„ , w,e~ery ~ 3 ~:_- ~ ~ih moo' ~ g - _ , I ~€ q ~ ~~~~~~e~~~~~ .~ ' ~~ ~ __ .:. ....... ~, ,-- - g L--- ' I ~s$;~ '~ e~ ~ I~ -~ i8i~~i~~l~ ,~ p _ 11 I ~ i ^~~ ~ i e .~ ~--` ~ ~~~ ~ `i~ ~ ~ i I ; ~ i P ' ~ ~ r-, ~ .~.~ it --- ;, .... a O ~ t \~ ! ~~ J ? o fN9MiIIW.MCC ~ ~ .. . ,r. ........_. ~ y3/y3 I ........'. .. '., •.. . A~ ~~1 _.1__-- ~ I 1 ~ ~. ~~ ~ ~ I ~~?j 'WSJ D~H~FiIiNWI ~ / / r ~ r-Y I ~ .... .. ~ .~ ~_ i -- -~!r--- - -- ------- K ~ ---~/G' ~C~- ~~ ~ -~ ; . ~s , i ~~ it ~ i ~ `~~~ ~~i i -~ PINEBRIDGE O ~.G4fE0WiMEM~Nts illRW4 ~ MOSIwL b~S1~IN ~ ~w:E.9y +998 St3nl COIISUlY3I1$,~ "°`~"'"~" G~ w~: 4 ~ .. «~,s.,~-.~. Pi nebridge-M PP-07-008/M RZ-07-010/MAZ-07-006 21 Development Process Checklist ®Submit a development application to a City or to the County ®The City or the County will transmit the development application to ACRD ®The ACRD Planning Review Division will receive the development application to review ®The Planning Review Division will do one of the following: ^Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time ^Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ^Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ^For ALL development applications, including those receiving a "No Review" or "Comply With" letter: • The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of--way, including, but not limited to, driveway approaches, street improvements and utility cuts. ^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) ^ Driveway or Property Approaches) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ^ Working in the ACHD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction -Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ^ Sediment & Erosion Submittal At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction -Subdivision to be reviewed and approved by the ACHD Drainage Division. ^ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ^ Final Approval from Development Services ACRD Construction -Subdivision must have received approval from Development Services prior to scheduling aPre-Con. 22 Pinebridge-MPP-07-008/MRZ-07-010/MAZ-07-006 ~~~~~ John S. Franden, President CHD ~ Rebecca W. Arnold, Vice President Sheny R. Huber, Commissioner (~„V,,..,.~~"~~a ;~ David Bivens, Commissioner Carol A. Mckee, Commissioner August 21, 2007 To: Jane Suggs- BRS Architects ~~!°~~T` ~ 200 Louisa St. ~• 1 ~' is Boise, I D 83712 AUG ~ ~~~ Owner: Carmen LLC C/O M&H Development LLC City of Meridian 291 E. Shore Dr, Ste. 200 City Clerk Office Eagle, ID 83616 Subject: Intermountain Outdoor Subdivision MOD/ PFP-07-003 1351-1375 e. Fairview Ave. This is a staff level approval of a preliminary plat for Intermountain Outdoor Subdivision. On May 29, 2003 the Ada County Highway District reviewed and approved a preliminary application (MPFP02-001) for Intermountain Outdoor Subdivision. The District had site specific requirements related to the access to Fairview and street improvements on Fairview. The same conditions and requirements apply to the proposed preliminary plat. This application is in compliance with previous application and the District has no additional requirements at this time. Prior to final approval you will need to submit construction plans to the ACHD Development Review Department to insure compliance with the conditions identified above or for traffic impact fee assessment. This is a separate review process that requires direct plans submittal to the Development Review staff at the Highway District. The applicant will be required to pay all applicable platting and review fees prior to final approval. If you have any questions, please feel free to contact me at 208-387-6177. Sincerely, ~~~ Chelsee Kucera Planning Intern Right-of-way & Development Services CC: Project file, Utilities City of Meridian .ua ..~~~~[y rnynway uis[nc[ • 3//~ AOamS Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • N1WN1.achd.ada.id.us ~.,: ----- ----- ------- r T ' I I r av,~re I ® I, ' N 'J' is ~,.~. ~ w i , l , ~ _ it ' ra ~Irr i I i ~ I ~ + Q ~N~.~~. I^ .e. ~ ~ ti ® ,.... __._ ~ . ,\ •; ~ ~, psx e ~w~_ ~~ _ }- ----- - - =-=- =- -- -_ Mp.._ ' L. ~ 'iO~i11~'~ . ~ ~ ..w .tea,... < ~ '~~'." ~G:-: z ~~. , I ~~ ~~~A N~•o~ ... M17E7~MOUMTMI OUTDOOR SUBDINSON Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us Development Process Checklist ®Submit a development application to a City or to the County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Division will receive the development application to review ®The Planning Review Division will do one of the following: ^Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time. ^Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ®Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ^Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ^For ALL development applications, including those receiving a "No Review" or "Comply With" letter: • The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACRD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of- way, including, but not limited to, driveway approaches, street improvements and utility cuts. ^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) ^ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ^ Working in the ACRD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACRD Construction -Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >ti00 sf of concrete or asphalt. Construction (Subdivisions) ^ Sediment & Erosion Submittal • At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction -Subdivision to be reviewed and approved by the ACRD Drainage Division. ^ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ^ Final Approval from Development Services ACHD Construction -Subdivision must have received approval from Development Services prior to scheduling aPre- Con. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us