Change Order No. 1 with Ridgeway Industrial, Inc. for Water Division Building
RECEI~7~Ll `~~~' ~ ~ Zno/ pity ~-f Meridian ~;ity Clerk Office 111_ To: From: CC: Date: Re: The P Works Department respectfully requests the following item be placed on the 18, 2007 City Council agenda, under Consent Agenda, for Council's Chan Order No. 1 for the Water Division t~uuarn roec~ wrrsuu~,uu~~ - ~-~M 6--~ Indust ial Inc . Additional plumbing work is required for the completion of the new Water Divisio Building. This change order consists of the following work and amounts to 8.27% of the co traction contract: Provide all labor and materials to install (1) additional urinal and (1) additional water ~ closet in the men's locker. Provide all labor and materials to install a water cooled drinking fountain. • Provide additional labor and materials to relocate hose bib. Provide and install (2) downspout nozzles on roof drain piping. Kreize beck Constructors (The City of Meridians' project construction managers) prepared and su miffed the change order. Will Berg; Tara Green Max Jensen, Engineering Technician Len Grady, P.E., City Engineer Ride Clinton, Water Department Superintendent 9/13/2007 Proposed Agenda Item for September 18, 2007 City Council Meeting Recommended Council Action: The Public Works Department recommends that City Council approves Change Order No. 1 for the Water Division Building project (construction -Ridgeway Industrial, Inc.) for $5,541.00 and authorize the Mayor to sign it. Thank this ite ou for your consideration. Please contact me if you have any questions regarding From the desk of... Max Jensen Engineering Technician Meridian Pubbc Works DepartrneM 660 E. Wateriower, Suite 200 Meridian, Idaho 63642 Phone: (208) 89&5500 Fax: (208) 898-9551 jensenm~meridranaty.org • Page CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 1 PROJECT NO. 0607a DATE: 09/13/07 EFFECTIVE DATE: CONT CTOR: Ridgeway Industrial, Inc. PROJE T: Water Division Building The Con rector is hereby directed to make the following changes from the Contract Documents and Plans. 1) Provid all labor and materials to install (1) additional urinal and (1) additional water closet in the men's locker. 2) Provid all labor and materials to install a water cooled drinking fountain in lieu of specified. 3) Provid additional labor and materials to relocate hose bib as per BRS Architects response to RFI #27. 3) Provid and install (2) downspouts nozzles on roof drain piping as per BRS Architects RFI #14. Reason or Change Order: Construction progress. Attachm nts: AIA Document G701/CMa - 1992 Change Order -Construction Manager-Advisor Edition Submitted by Kreizenbeck Constructors HANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original ntract Price $ 67,000.00 Original Contract Times: Completion Net Chan es form previous Change Orders Net changes form previous Change Orders No. 0 t 0 No._ to _ (calendar days) $0.00 None Contract rice Prior to this Change Order: Contract Times prior to this Change Order: (calendar days or date) $s7,oo .oo Net Incre se (decrease) of this Change Order: Net Increase (decrease) of This Change Order: (calendar days or date) $5,541. 0 Completion by Contract rice with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) 372,54 .oo RECOM ENDED: (CONSTRUCTION MANAGER) ACCEPTED: (CONTRACTOR) See p ovided AIA signed change order See provided AIA signed change order By: By: Date: Date: APPROV D: (CITY PURCHASING AGENT) COUNCIL APPROVAL By: Keith Watts Date: I (Date: i APPROV D: (CITY) - ATTEST: By: Maygr Tammy de Weerd IBy: City Clerk, Will Berg Jr. Date: I Date: : e =: -- .= Document G7011CMaTM -1992 Chan a Order -Construction Manager-Adviser Edition PROJECT ame and address): CHANGE ORDER NUMBER: 001 OWNER: Meridian ater Deparunent Building 06- INITIATION DATE: August 03, 2007 CONSTRUCTIO ARCHITECT: 021 2235 No west 8th Street CONTRACTOR: Meridian, 0 83642 FIELD: TO CO CTOR (Name and address): PROJECT NUMBERS: 06-021 / 15400 OTHER: ^ Ridgeway dustrial, Inc• CONTRACT DATE: February 20, 2007 2251 East ark Street CONTRACT FOR: General Meridian, oho 83642 Construction THE C CT IS CHANGED AS FOLLOWS: 1) Provide labor and materials to install (1) additional urinal and (1) additional water closet in the men's locker. Work includes: w cutting, removal, and replacement of existing concrete, excavation and backfdl for drain lines, waste and vent piping, do stic water piping, and insulation. All work to be completed as per the direction of lire City of Meridian. $ 4,150.00 2) Provide L labor and materials to install a water cooled drinking fountain in lieu of specified as per the direction of ThOe city of Meridian. 3) provide dddtional labor and materials to relocate hose bib as per BRS Arrhitects response to RFI Ii27. $ 577.00 4) Provide d install (2) downspout nozzles on roof drain piping as per BRS Architects response to RFI #l4. $ 644.00 f 67,000.00 The otigi Contract Sum was ; 0.00 Net thong by previously authorized Change Orders s 67,000.00 The Contt Sum prior to this Change Order was = 5,541.00 The Con Sum will be increased by this Change Order in the amount of s 72,541.00 The new C ntract Sum including this Change Order wdl be The Con Time will be unchanged by Zero (0) days. The date o Substantial Completion as of the date of this Change Order therefore is NOTE: sutnmary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been autho 'zed by Construction Change Directive. NOT VALID UNTIL SIGNED BY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR. I{reizen I,C.C DBA Kreizenbeck Constructors BRS Architects CONTTR TION MANAGER (Firm name) ARCHITECT (Firm name) 251 East t Street, Suite 110, Boise, Idaho 83702 1010 S. Allante Street, Suite 100, Boise, ID 83709 ADD ADDR e BY ( ign re) BY (Signature) r/ Michael J. erard Clinton Yaka (TYPed ) DA (Typed name) DATE. Rid wa sttial, Inc. Ci of Meridian CONTRA OR (Firm name) OWNER (Firm name) 2251 East Street, Meridian, Idaho 83642 660 East Watertower, Suite 200, Meridian, Idaho 83642 ADDRESS ADDRESS BY (Sig re) BY (Signature) In ' ~ ~7 Brad Watson (TYPed ) DATE: (Typed name) DATE: AIA UQCYm G7011CMeTM -1992. Copyright ®1992 by The American Institute of Architects All rlphts reserved. WARNING: This AIAw Document is protected b U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA'° Document. or any portion of it, by AIA sottw eat 16:30 37 on 09/06/2007 un Ider Order NoI1000280013 ~1 which e>Ipires on 1 /17 e12008, and sl rrot for r tesaleaw_ This document was Produced (2961092845) User Notes: Ln-28-'i97 1P ..`-- -. i9 FI;.Oi';-T35L1 2t7g-$8 ~ -)~b8~ pLUtiiBiitG .>0;3 slas Kreizenbeck Con traction 251 i/ast )E'ront St ,Suite 110 14oise, Y~ 83702 Phone: 336-9500 ~'aX: 336-7444 A'I'7'iY: Crandon B ington T-25 ~ F'liG]Z'iI113 F-~h5 2251 E. larark i~~eridion,lD 83b42 203.887.8600 _ ~?.X 203.887,8085 ~.hr. Ridg:'+~ayladus;riol,cc~ .1~ine 28, 2007 S'Ll};,7ECT: Ivlerid an water Facility- Additional eater Clos:,t & Urinal Pricing 'Jb'ORK AS FOLLC:W~: • Cut, break, emo~ve b'c. patch concrete • Excavate, h ckfill ~: compact as needed. Supply & i stall drain, ~.~aste Bc vent piping _ • Supp1}' & i Stall domestic ~,vater piping • Insulate wat r piping Supply & in tall (1} ~r~ater closet & (1) urinal • Test & insp coon l:`tiC1,U5ZUNS: • Removal & eplacement of eaisti~7g ~:valls NOTLS: ., `4Uork to be one during normal business ho~.~rs Quotc good or 30 days • lncliides per nit 'hOTAL ....:............~ Th~nl: you, Ken Norton 1/Stimator i'..id~ev,!?.~7 industrial .:...:...........................................................................,.... ~4,"i 50.00 Ync. .;LU I=h;l;rl-is>`_i0 !~i~{-;fi`r'--r~bi_i~ - - - 1~LUiV1BING ,SOB 5145 2251 E. t.rark ' 1~!r~dic~, ID 3;642 ~os.997.66C0 . f~,R 208.837.686 . w+n+.ii~ge'+~.ylyd~;tricLccrc June 28, 200`7 )i~reizenbeck C nstruction Z51 I"ast f;'ront t., Suirc 110 Boise, Ill 8370 pl'<one: 336-950 ~'ax: 33G-7444 ATTN: Brandon Byington S~C)T3J"EC3': Mer dian \~ater ;:~ acility- replaced. proposed. non-chilled I3aws driiilcing fountain with an t~llA Llkay water cool r. -OIZIC AS FO LO~~JS: • Move wa er and drain piping. • Install su ports. • Install ne AbA Elka~y EZS8L ~.vater cooled. drinking fountain. • ~eiurn th T-i`ar~vs 6521 ~'R drinking fountain. EXCLUSIONS: •. ~eniova.l replacement of existing wall if needed to exposed plumbing and supports. • Electrical NOTES: • \~i~ork to e done during normal business hours • Quote go d for 30 days • Includes zrmit. `T'OTAL i\L+'W 12Ii~1KING FOUNTAIN I\'STALT.,ED ......................................... 5912.00 TOTAL DF_DU T I+'OR E~+ISTIllU J7TZI;NKLnG 1~ OYJN T Ali~l ...........................<5742.00> TOTAL CI3AN Tl~anlc you, Ken \Tert~n Estimator Ridgeway L ...........................................:............. S T 70.00 Inc. - ~b5-17-'07 5;3~rRUM-1356 268-887-81186 ............. . ~1~DUSTi~~A~.,~~t~ PLUMBING JOB 5143 Kriezenbeck C nstryetors 251 East Front t., Suite I10 Boise, ID 8370 Phone: 33f~-950 Fir: 336-7444 ATTN: Brando Byington SI.TB.IECT: Mer than V~ater Facility Dose Hibb Relocation Fer RFl # 27 o Supply & i,~,ctail d4meSfic water piping Xz: hangers t0 relocafe hose Bibb • Insulate a ditional ~urater piping h`t7TES: • Work fo a done during normal business hours • Quote go d for 30 days • Includes hermit T-151 F002/©02 F-273 22S 1 E. laaarl~ Ateri~ua-, ID 83642 90~.881.86~ rat2oe.8BI.86B6 waw,Aid~ew~Andimrial.ro~a Msy 17, 2007 Tt~TAI. ..............G..............................................................................................3577.00 Thank yoa, hen Norton lsti~nator Rirl~eway T~ Tnc. E5-i7-'07 09:34 FROM-T350 208-887-8686 PLUMBING aas sx4s Kreezenk-eck C nstructors Z51 East Froat t., Sant Y 10 Boise, ID 8370 Phoae: 336-950 Fax: 336-7444 ATTM: Brandon Byargton SUB3'EC'I': Mer~dian Water Facility Itoaf Drain Tezr*_minations Per 1t~'T # t 4 T-151 F001/002 F-273 2251 f. Lanark fReridian, l0 63642 tae.8@7.8600 rAZ 2oe.881.86B6 www.Ridpewryln~ustriolcan lvtay 17, 2007 • Suggly &~ install(2) down spout nozzles on roof drain piping t~n~inating 18" above gale ~~: • Work to • Quote g< • Includes TOTAL., Thank you, Kcn I~'orton Estimator Ridgeway I, done during normal bwiness hours for 30 days ..................................~..................,...............,.......................5644.U4 Inc.