Change Order No. 1 with SBI Contracting for Water Division Building
hF,CF,IVED 1L' To: From: CC: Date: Will Berg; Tara Green Max Jensen, Engineering Technician Len Grady, P.E., City Engineer Rids Clinton, Water Department Superintendent 3/2007 ~j r ~~ ! ~ 2~~T :~li;y u~.~~ `'if.~T f;lerk Orifice Re: (Proposed Agenda Item for September 18, 2007 City Councl Meeting The P blic Works Department respectfully requests the following item be placed on cne Septe ber 18, 2007 City Council agenda, under Consent Agenda, for Council's consid ration: Chan Order No. 1 for the Water Division Buildin ro'ect construction -SBI Contractin Inc . dditional plumbing work is required for the completion of the new Water Division Buildin This change order consists of the following work and amounts to 3.7% of the constru Ion contract: (Provide all labor and materials to install (1) additional toilet-partition and (1) additional unnal screen in the locker room. Kreize beck Constructors (The City of Meridians' project constrtction managers) prepared and su miffed the change order. Thank this ite .I for your consideration. Please contact me if you have any questions regarding From the desk of... Max.lensen Engineering Technician Meridian Public Works Department 660 E. Watertower, Suite 200 Meridian, Idaho 83642 Phone: (208)898-5600 Fax: (208)898-9551 jensenmQmeridianaty.org :commended Council Action: The Public Works Department recommends at City Council approves Change Order No.1 for the Water Division Building oject (construction -SBI Contracting, Inc.) for $685.00 and authorize the ayor to sign it. • Page CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 1 PROJECT NO. 0607a DATE: 09/13/07 EFFECTIVE DATE: CONT CTOR: SBI Contracting, Inc. PROJE T: Water Division Building The Co ractor is hereby directed to make the following changes from the Contract Documents and Plans. Descrip on: 1) Provi all labor and materials to install (1) additional toilet-partition and (1) additional urinal screen in the the lock room. Reason or Change Order: Construction progress. Attachm rrts: AIA Document G701/CMa - 1992 Change Order -Construction Manager-Advisor Edition Submitted by Kreizenbeck Constructors ! CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original ontract Price $ 18,500.00 Original Contract Times: Completion Net cha s form previous Change Orders Net changes form previous Change Orders No. 0 t 0 No._ to _ (calendar days) $0.00 None Contract Price Prior to this Change Order: Contract Times prior to this Change Order: (calendar days or date) $18,50 .00 Net Inc ase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days or date) $685.0 Completion by Conirad Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $19,18 .00 RECOM ENDED: (CONSTRUCTION MANAGER) ACCEPTED: (CONTRACTOR) See rovided AlA signed change order See provided AIA signed change order By: BY: Date: Date: APPRO ED: (CITY PURCHASING AGENT) COUNCIL APPROVAL By: Kei Watts Date: Date: APPRO ED: (CITY) - ATTEST: By: May r Tammy de Weerd By: City Clerk, Will Berg Jr. Date: Date: s I Document G7011CMa° -1992 Change Order -Construction Manager-Adviser Edition PROJECT ame and addressl: CHANGE ORDER NUMBER: 001 OWNER: Meridian stet Department Building 06- INITIATION DATE: August 03, 2007 CONSTRUCTION MANAGER: 021 ARCHITECT: 2235 No west 8th Street CONTRACTOR: Meridian, 0 83642 FIELD: TO CONT CTOR (Name and address): PROJECT NUMBERS: 06-021 / 10900 OTHER: ^ SBI Con g, Inc. CONTRACT DATE: February 20, 2007 228 East P a #193 CONTRACT FOR: General Eagle, Id 83616 Construction ICR No. R E-4481 Public Wo License #14744-B- 4(10150) THE CONT CT IS CHANGED AS FOLLOWS: 1) Provide labor and materials to install (1) additional toilet-partition and (1) additional urinal screen in the locker room. All work to be ompleted as per the direction of the City of Meridian. S 685.00 The on ~ Contras Sum was : 18,500.00 Net Chang by previously authorized Change Orders = 0.00 The Con t Sum prior to this Change Order was f L 8,500.00 The Con t Sum will be increased by this Change Order in the amount of f 685.00 The new C. ntras Sum including this Change Order will be : 19,185.00 The Con t Time will be unchanged by Zero (0) days. The date o Substantial Completion as of the date of this Change Order therefore is NOTE: Thi summary does not reflect changes in the Contract Sum, Contras Tithe or Guaranteed Maximum Price which have been autho 'zed by Construction Change Directive. NOT VALID~UNTIL SIGNED BY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR. Kreizea LLC DBA Kreizenbeck Construsors CONSTRU MANAGER (Firm Warne) 251 East F t Street, Suite 110, Boise, Idaho 83702 p,,or t~tgnui re/ ~'(.~ Michael J. erard (Typed ) ATE. SBI Con ,Inc. CONTRAC OR (Firm name) 228,~act P #193, Eagle, I aho 83616, ICR No. RCE- 1, Pu c Works License 4744-B-4 10150 RE BY (i (Typed ) DATE: AIA Docum~ protected b! may result i by AIA softw User Notes: BRS Architects ARCHITECT /Firm name) 1010 S. AUante Street, Suite 100, Boise, ID 83709 ADDRES /~ BY (Signature) Clinton Yaks (Typed name) DAT . City of Meridian OWNER (Firm name) 660 East Watertower, Suite 200, Meridian, Idaho 83642 ADDRESS BY (Signature) Brad Watson (Typed name) DATE: nt G7011CMaTM - i9Y2. CopyripM ®1992 by The American Institute of Architects. AN riphis -ssafwd. WARNING: This AIA'" Document is U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA10 Document, or any portion of it. ~ severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced ve at 16:19:07 on 08106/2007 under Order No.1000280013 1 which expires on 1/17/2008, and is not for resale. (2627469252) 0 i I03?'200 r 09:15 A;` 2053 i E3Z01 SEL ~~ 001: 00':' y ~ ~~ ~~~~~~ (8 ~ ltfi'ailin Iddtsss, Ship To Address: 228 !_. p! za, X193 Fhone: (208) 376-5200 1100 Yd. Executive Dave, Ste A Ea8la, i 63616 Fax: (Z08) 376-5201 Boise, !D 83704 Con~-ac~~'# ®ato: SalQs Tax irJcluded PROPOSAL Brandon:. Please Cafl with any questions, have a great day, Thank you Bob 1-Layout of Powder Coated Toilet Partitions as per the attached layout $ 485,00 Add for labor to install $ 200.00 EXCLUSIO S: packing, br`acking, bond, liquidat©d damagQS (unless caused by SBl Gonlracting, nc.;, tnsfallatron of v~:'rerp+''nti'%do:: ifoms, L'Uiv^J~S ~^v~flr'C~55Ed ii(?iiiS. All fast time rders are COD or upon approved credit, price good for 30 days ~ 8EE 6ACK FOR IMPORTANT TERMS AND GONDITI~NS TERMS' ,O.D. MET 70 UPON APPROVED CREpIT - Plewe sl,~n and tiorrr ore copy.: Compab~ Na e: ACCEPTED SY Public ya-orks 44744-B-~S10150~ Eitaiza~ :a:. Proaact; 11~i8i vla~i] ~.AVa~i - Constructors _ ___~ 7-3-07 Addenda: 0 ___--_- _ Si9ua