Loading...
HomeMy WebLinkAboutChange Order No. 1 with Treasure Valley Fire Protection for Water Division Building~FCEID SEF i 3 2007 ;iiy l# 1Vleridi M mo ~1tY Clerk Q~c~ To: Will Berg; Tara Green From: Max Jensen, Engineering Technician CC: Len Grady, P.E., City Engineer Rick Clinton, Water Department Superintendent Date: 9/13/2007 Re: Proposed Agenda Item for September 18, 2007 City Council Meeting The P blic Works Department respectfully requests the following item be placed on the Septe ber 18, 2007 City Council agenda, under Consent Agenda, for Council's consid ration: Chan Order No. 1 for the Water Division Buildin ro'ect construction -Treasure Valle Fire P faction Inc . Additional plumbing work is required for the completion of the new Water ivision Building. This change order consists of the following work and amounts to <1.5% of the construction contract: • Provide a credit for the excavation of 6" water line that was completed by the Owner. Kreizen ck Constructors (The City of Meridians' project construction managers) prepared and su miffed the change order. Recommended Council Action: The Public Works Department recommends hat City Council approves Change Order No. 1 for the Water Division Building roject (construction -Treasure Valley Fire Protection, Inc.) for <$988.00> and uthorize the Mayor to sign it. Thank this ite for your consideration. Please contact me if you have any questions regarding From the desk of... Max Jensen Engineering Technician Meridian Public Works Departrnent 660 E. Watertower, Suite 200 Meridian, Idaho 83642 Phone: (208) 898-5500 Fax: (208) 898-9551 jensenmQrneridiarxrily.org • Page 1 CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 1 PROJECT NO. 0607a DATE: 09/13/07 EFFECTIVE DATE: CONT CTOR: Treasure Valley Fire Protection, Inc. PROJE T: Water Division Building The Co rector is hereby directed to make the following changes from the Contract Documents and Plans. Descrip "an: 1) Provi a credit for the excavation of 6" water line that was completed by the Owner. Reason or Change Order: Construction progress. Attachm nts: AIA Document G701/CMa - 1992 Change Order -Construction Manager-Advisor Edition Submitted by Kreizenbeck Constructors HANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original ntract Price $ 66,000.00 Original Contract Times: Completion Net chan es form previous Change Orders Net changes form previous Change Orders No._0_ t 0_ No._ to _ (calendar days) $0.00 None Contract rice Prior to this Change Order: Contract Times prior to this Change Order: (calendar days or date) $66,00 .00 Net Incr se {decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days or date) ($988. 0) Completion by Contract rice with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $65,01 .00 RECOM ENDED: (CONSTRUCTION MANAGER) ACCEPTED: (CONTRACTOR) See rovided A/A signed change order See provided A/A signed change order ey: By: Date: Date: APPRO ED: (CITY PURCHASING AGENT) COUNCIL APPROVAL By: Keit Watts Date: Date: APPRO D: (CITY) - ATTEST: By: May r Tammy de Weerd By: City Cleric, Will Berg Jr. Date: Date: - lA Document G701/CMa° -1992 PROJECT Meridian 021 2235 Non Meridian, Order -Construction Manager-Adviser Edition and address): CHANGE ORDER NUMBER: 001 Department Building OCr INITIATION DATE: August 03, 2007 8th Street 83642 TO CO CTOR (Nome and address): Treasure V ey Fire Protection,lnc. 2731 Sou Sarum Way Boise, I 83709 ICR No. R E-4148 Public Wo license No. 10314-A- 4(13930) PROJECT NUMBERS: 06-021 / 15300 CONTRACT DATE: February 20, 2007 CONTRACT FOR: General Construction OWNER: CONSTRUCTION MANAGER: ARCHITECT: CONTRACTOR: FIELD: OTHER: ^ THE GONT CT IS CHANGED AS FOLLOWS: 1) Provide credit fc~r the excavation of 6" water line that was completed by the Owner. Deduct cS988.00> The origi Coauact Sum was : 6 0 Net Chang 6, 00.00 by previously authorized Change Orders : The Con 0.00 Sum prim to this Change Order was = The Contr ~,~_~ t Sum will be decreased by this Change Order in the amount of s 9 The new C 88.00 ntract Sum including this Change Order will be = 65,012.00 The Contr Time will be unchanged by Zero (0) days. The date o Substantial Completion as of the date of this Change Order therefore is NOTE: Thi summary does not reflect changes is the Contract Sum, Contract Time or Guaranteed Maximum Price which hav been auUro e zed by Construction Change Directive. NOT VALIDIUNTIL SIGNED BY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR. 251 East I ADDRE ~J~(rg~ `' Michael J. (Typed nm Treasure ~ CONTRAC' 2731 Soutl 4148, Publ ADDRESS BY ( rgna6 (Typed Hart AIA Docu„M protected b may result i by AIA soltw Ussr Notes: L[,C DBA Kreizenbeck Constructors gl~ Architects ON MANAGER (Firm name) ARCHITECT (Firm name) ~t Street, Suite 110, Boise, Idaho 83702 1010 S. Allante Streety,/Sfuite 100, Bo/ise, ID 83709 • ADD / / ~iG~ ~) B l B (Signature) A_ ~r O mrd O~/~ Clinton Yaka u'/f/x' 7 DA (Typed name) DA E: ' llley Fire Protection Inc. ~R (Firm name) Sarum Way, Boise, Idaho Works License No. 1031 83709, ICR No. RCE- City of Meridian OWNER (Ftrm name) 660 East Watertower, Suite 200, Meridian, Idaho 83642 ADDRESS BY (Signature) Brad Watson (Typed name) DATE: "~^~°"- ~a°~• coPYnpnt ®7x92 by The American Institute of Architects. All fights roservad. WARNING: This AIA" Document is U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this A1A" Document, or any portion of it, severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced •e at 16:25:04 on 08/06/2007 under Order No.1000280013_1 which expires on 1/17/2008, and is not (or resale. (tasie735o)