To: Will Berg; Tara Green
From: Max Jensen, Engineering Technician
CC: Len Grady, P.E., City Engineer
Rick Clinton, Water Department Superintendent
Date: 9/13/2007
Re: Proposed Agenda Item for September 18, 2007 City Council Meeting
The P blic Works Department respectfully requests the following item be placed on the
Septe ber 18, 2007 City Council agenda, under Consent Agenda, for Council's
consid ration:
Chan Order No. 1 for the Water Division Buildin ro'ect construction -Treasure Valle
Fire P faction Inc . Additional plumbing work is required for the completion of the new
Water ivision Building. This change order consists of the following work and amounts to
<1.5% of the construction contract:
• Provide a credit for the excavation of 6" water line that was completed by the Owner.
Kreizen ck Constructors (The City of Meridians' project construction managers) prepared
and su miffed the change order.
Recommended Council Action: The Public Works Department recommends
hat City Council approves Change Order No. 1 for the Water Division Building
roject (construction -Treasure Valley Fire Protection, Inc.) for <$988.00> and
uthorize the Mayor to sign it.
Thank
this ite
for your consideration. Please contact me if you have any questions regarding
From the desk of...
Max Jensen
Engineering Technician
Meridian Public Works Departrnent
660 E. Watertower, Suite 200
Meridian, Idaho 83642
Phone: (208) 898-5500
Fax: (208) 898-9551
jensenmQrneridiarxrily.org
• Page 1
CITY OF MERIDIAN
33 EAST IDAHO
MERIDIAN, ID 83642
CONTRACT CHANGE ORDER
CHANGE ORDER NO. 1
PROJECT NO. 0607a
DATE: 09/13/07
EFFECTIVE DATE:
CONT CTOR: Treasure Valley Fire Protection, Inc.
PROJE T: Water Division Building
The Co rector is hereby directed to make the following changes from the Contract Documents and
Plans.
Descrip "an:
1) Provi a credit for the excavation of 6" water line that was completed by the Owner.
Reason or Change Order: Construction progress.
Attachm nts: AIA Document G701/CMa - 1992
Change Order -Construction Manager-Advisor Edition
Submitted by Kreizenbeck Constructors
HANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original ntract Price $ 66,000.00 Original Contract Times: Completion
Net chan es form previous Change Orders Net changes form previous Change Orders
No._0_ t 0_ No._ to _ (calendar days)
$0.00 None
Contract rice Prior to this Change Order: Contract Times prior to this Change Order:
(calendar days or date)
$66,00 .00
Net Incr se {decrease) of this Change Order: Net Increase (decrease) of this Change Order:
(calendar days or date)
($988. 0) Completion by
Contract rice with all Approved Change Orders: Contract Times with all Approved Change Orders:
(calendar days)
$65,01 .00
RECOM ENDED: (CONSTRUCTION MANAGER) ACCEPTED: (CONTRACTOR)
See rovided A/A signed change order See provided A/A signed change order
ey: By:
Date: Date:
APPRO ED: (CITY PURCHASING AGENT) COUNCIL APPROVAL
By: Keit Watts
Date: Date:
APPRO D: (CITY) - ATTEST:
By: May r Tammy de Weerd By: City Cleric, Will Berg Jr.
Date: Date:
- lA Document G701/CMa° -1992
PROJECT
Meridian
021
2235 Non
Meridian,
Order -Construction Manager-Adviser Edition
and address): CHANGE ORDER NUMBER: 001
Department Building OCr INITIATION DATE: August 03, 2007
8th Street
83642
TO CO CTOR (Nome and address):
Treasure V ey Fire Protection,lnc.
2731 Sou Sarum Way
Boise, I 83709
ICR No. R E-4148
Public Wo license No. 10314-A-
4(13930)
PROJECT NUMBERS: 06-021 / 15300
CONTRACT DATE: February 20, 2007
CONTRACT FOR: General
Construction
OWNER:
CONSTRUCTION MANAGER:
ARCHITECT:
CONTRACTOR:
FIELD:
OTHER: ^
THE GONT CT IS CHANGED AS FOLLOWS:
1) Provide credit fc~r the excavation of 6" water line that was completed by the Owner. Deduct cS988.00>
The origi Coauact Sum was : 6
0
Net Chang 6,
00.00
by previously authorized Change Orders :
The Con 0.00
Sum prim to this Change Order was =
The Contr ~,~_~
t Sum will be decreased by this Change Order in the amount of s 9
The new C 88.00
ntract Sum including this Change Order will be
= 65,012.00
The Contr Time will be unchanged by Zero (0) days.
The date o Substantial Completion as of the date of this Change Order therefore is
NOTE: Thi summary does not reflect changes is the Contract Sum, Contract Time or Guaranteed Maximum Price which hav
been auUro e
zed by Construction Change Directive.
NOT VALIDIUNTIL SIGNED BY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR.
251 East I
ADDRE
~J~(rg~
`' Michael J.
(Typed nm
Treasure ~
CONTRAC'
2731 Soutl
4148, Publ
ADDRESS
BY ( rgna6
(Typed Hart
AIA Docu„M
protected b
may result i
by AIA soltw
Ussr Notes:
L[,C DBA Kreizenbeck Constructors gl~ Architects
ON MANAGER (Firm name) ARCHITECT (Firm name)
~t Street, Suite 110, Boise, Idaho 83702 1010 S. Allante Streety,/Sfuite 100, Bo/ise, ID 83709
• ADD / / ~iG~
~) B l B (Signature) A_ ~r O
mrd O~/~ Clinton Yaka u'/f/x' 7
DA (Typed name) DA E: '
llley Fire Protection Inc.
~R (Firm name)
Sarum Way, Boise, Idaho
Works License No. 1031
83709, ICR No. RCE-
City of Meridian
OWNER (Ftrm name)
660 East Watertower, Suite 200, Meridian, Idaho 83642
ADDRESS
BY (Signature)
Brad Watson
(Typed name) DATE:
"~^~°"- ~a°~• coPYnpnt ®7x92 by The American Institute of Architects. All fights roservad. WARNING: This AIA" Document is
U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this A1A" Document, or any portion of it,
severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced
•e at 16:25:04 on 08/06/2007 under Order No.1000280013_1 which expires on 1/17/2008, and is not (or resale.
(tasie735o)