Loading...
HomeMy WebLinkAboutChange Order No. 2 with Ira-Mac, Inc. for Water Division Building~cl~`~ ~ ~ ~a0/ To: From: CC: Date: Re: emo I Berg; Tara Green x Jensen, Engineering Technician id Watson, P.E., Public Works Director k Clinton, Water Department Superirrtendent 3/2007 amity (.1f" 1Vleridiai7 City Clerk Office Agenda Item for September 18, 2007 City Council Meeting The P blic Works Department respectfully requests the following item be placed on the Septe ber 18, 2007 City Council agenda, under Consent Agenda, for Council's ~.nan vruer rvu. c iur uro VVdICI urowiuri oununr rvGt.~ WIL7UVVUVII - ~~a-It1OV I~~Y. . Additio al work is required for the stabilization of asphalt and concrete base at the new parking lot. This change order consists of the following work and amounts to 0.44% of the constru ion contract: • rovide all labor and materials to install geotextile fabric under southwest section of sphalt parking lot. • rovide all labor and materials to over excavate for curb and gutter along the east ide of parking area to remove fat clay soils. Kreizen ck Constructors (The City of Meridians' project construction managers) submitted a change order for this increase. Thank this ite recommended Council Action: The Public Works Department recommends >,at City Council approves Change Order No.1 for the Water Division Building roject (construction -Ira-Mac, Inc.) for $1,256.00 and authorize the Mayor to ign it. for your consideration. Please contact me if you have any questions regarding From the desk of... Max Jensen Engineering Technician Meridian Public Works Department 660 E. Watertower, Suite 200 Meridian, Idaho 83642 Phone: (208) 898-5500 Fax (208)898-9551 jensenm@meridiancily.org • Page 1 CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83s42 CONTRACT CHANGE ORDER CHANGE ORDER NO. 2 PROJECT NO. 0607a DATE: 09/13/07 EFFECTIVE DATE: CONT CTOR: Ira-Mac, Inc. PROJE T: Water Division Building The Con rector is hereby directed to make the following changes from the Contract Documents and Plans. Descipti n: 1) Provid all labor and materials to install geotextile fabric under southwest section of asphalt parking lot as pe MTI's recommendations. 2) Provid all labor and materials to overexcavate for curb and gutter along the east side of asphalt parking a to remove fat clay soils as per MTI's recommendations. Reason or Change Order: Construction progress. Attache erns: AIA Document G701/CMa -1992 Change Order -Construction Manager-Advisor Edition Submitted by Kreizenbeck Constructors RANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original ontract Price $ 180,275.00 Original Contract Times: Completion Net chap es form previous Change Orders Net changes form previous Change Orders No._0_ t _1_ No._ to - (calendar days) $105,0 4.00 None Contract rice Prior to this Change Order: Contract Times prior to this Change Order: (calendar days or date) $285,3 9.00 Net Incre se (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days or date) $1,256. 0 Completion by Contract rice with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) a2as,s s.oo RECOM ENDED: (CONSTRUCTION MANAGER) ACCEPTED: (CONTRACTOR) See vided AIA signed change order See provided AIA signed change order By: By: Date: Date: APPRO D: (CITY PURCHASING AGENT) COUNCIL APPROVAL By: Kei Watts Date: Date: APPRO D: (CITY) - ATTEST: By: May r Tammy de Weerd By: City Cleric, Will Berg Jr. Date: Date: ~ ® TM =~-= Document G701/CMa -1992 Change Order -Construction Manager-Adviser Edition PROJECT ame and address): CHANGE ORDER NUMBER: 002 OWNER: Meridian ater Department Building 06- INRIATION DATE: August 03, 2007 CONSTRUCTION MANAGER: 02I ARCHITECT: 2235 No west 8th Street CONTRACTOR: Meridian, 0 83642 FIELD: TO CONT CTOR (Name and addmss): PROJECT NUMBERS: 06-021 / 2210 OTHER: ^ Ira-Mac, c. CONTRACT DATE: February 20, 2007 2785 Sou Liberty CONTRACT FOR: General Boise, Id o 83709 Construction ICR No. R 1442 Public W ks License No. 11061-A- 4(02850, 0 300, 01542, 02220, 02210, 02310, 02 18, 02890, 02500) THE CONTRACT IS CHANGED AS FOLLOWS: 1) Provide labor and materials to install geoteztile fabric under southwest section of asphalt panting lot as per MTI's recommen scions. $ 615.00 2) Provide labor and materials to over excavate for curb and gutter along the east side of parking area to remove fat clay soils as per MTI s recommendations. $641.00 The origin Contract Stun was = 180,275.00 Net Chang by previously authorized Change Orders f 105,074.00 The Con t Sum prior to this Change Orden was S 285,349.00 The Con Sum will be increased by [Eris Change Order in the amount of : 1,256.00 The new C ntract Sum including this Change Order will be >t 286,605.00 The Con Time will be unchanged by Zero (0) days. The date o Substantial Completion as of the date of this Change Order therefore is NOTE: Thil; summary does not reflect changes in the Contras Swn, Contras. Time or Guaranteed Maximum Price which have been nacho ' ed by Construsion Change Directive. AIA Docume protected bi may result li by AIA softw~ User Notes: nt G701lClMam -1992. CopyrlpM ®1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA" Document is ~ U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this A!A` Document, or any portion of it. I severe civil and criminal penalties, and will be prosecuted to the maximum extent passible under the law. This document was produced re at 16:16:29 on 08/06/2007 under Order No.1000280013_1 which expires on 1/17/2008, and is rrot fa resale. (292986903) NOT VALID NTIL SIGNED BY THE OWNER, CONSTRUCTION Mp I{teizen LLC DBA Kreizenbeck Constructors CONSTRU ION MANAGER (Firm name) 251 East t Street, Suite 110, Boise, Idah 83702 ADD BY igna re) Michael J. erard (Typed ) AT Ira-Mac. In . CONTRACT R (Firm name) 2785 South liberty, Boise, Idaho 83709,1CR No. RCE- 1442, Pub ' Works License No. 11061-A-4(02850, 03300, 01542 ,02210, 310,02 02890,02500) Si na re) ~- O ( yped ) DA NA Doeu G701/CNa^r-1992 CapyrlpM ®1992 by The Amen protected b U.S-Copyright Law and International Treaties. Unautt may result i severe civil and criminal penalties, and will be proses by AU sottw eat 16:1629 on 08/06/2007 under Order No.10002600t; User Notse: NAGER, ARCHITECT AND CONTRACTOR. BRS Architects ARCHITECT (Firm name) 1010 S. Allante Street, Suite 100, Boise,lD 83709 ADDRE B igna re) r~A /~j~ Clinton Yaks C~f/ ~If/~~ ~7 (Typed name) DA City of Meridian OWNER (Firm name) 660 East Watertower, Suite 200, Meridian, Idaho 83642 ADDRESS BY (Signature) Brad Watson (Typed name) DATE: :an Institute of ArchfleGs. All rights reserved. WARNING: This AIA" Document is orized reprodudion or distribution of this AIA16 Document, or any portion of it. uted to the maximum extent possible under the law. This document was prothtced {_i which expires on 1/17/2008, and is not for resale. (2929069031 06/22l200i 0°: t r~^„ • ,i~ ;. ^l: ate '; FS,~: 2L~23623926 ~ IR,w-tdAC R- ~ A./1~'AC 2785 S. LIBERTY BOISE, IDAHO 83709 t2o~) ~~Tr F~c (208) 382aeze O[scatnTON OF MONK ~ G~Ore 7a ~ Sr~CG `~S-~ yo. ~ 002!002 No.~'~-397 E-Mimi ir8A1RC(~miCron.t107< °AT o. • C4f TOM C11`S pAe6A NO PHeNF MECM^NIC NCLP iN $T•hTiNe DATC ^ILL (O •OCn TAACN Or ADDIIL f [~ DA`r WORK u'rr ^ CONTRACT ///IIYYY/`/ )GH rN~r:c TOTAL MAT~RIAL$ TOTAL UODn ux oATi' GOh/' CTCD WOCR Op OGFC PY TOTbI AMOUMi ~~~ M G/~ l LJ l..l ~oro~ amvum pue u telAl Or[Itng IG for nbeve work: or tte mellcd Nher StRnawreT_ . completion I hereby 9CkneWlee•,',e the Selftllfanry trmpmhPrt Df vrprh dWOCC-070.3 of the nbovn ee+erlbod wor6 PRINTED IN U.SA. w, hlil'~~ n f~l~o)f~31~5 l~~l~liu~ y~01 ~~~~~ ~ zre5 s. ue~Anr N o, ~~ 11. Q 8 9 ev~sE, ro~o e3~oe - (~oBy ~~e-rt Gs,. ~~nai ~aa as»a E.Mali Ir8fT18CQmiCfpn.1"19t DAT %.y~~ v7 CU7TOrtN•~ ONo[R NO ~hONC NtCH~{IlG M[l~6• •111\TINO DA ~ ^ii~ TO OYOC4 ThSCN NT woo~ts• ^ DAY WORK CON7gALT CITY ^ ExTRA JOB NON JOG ~NONC DCb CRIPTIOV OF WOPK -~~ ~ 9o a- I, j -- _~~ ~ h-= TOTAL MATERIALS TOTAL LABOR ' TAK ~, DATE ce..cycteD~ ~~ ~ woBR onotll[o BT 70T~ir. AMOUNT ~ Q q V Ke one home U local amount Cuc U twat mmnG Io for fIbOM WOrkl OI h9 mnAr,C n11nr Slgrw[ure `` complcpnn l hereby acknowledge Ike seuslacrory comple;ror+ of Work JWQCGE70.3 n) Iha nbo~a ovac~~bad work PRINTED IN U,5,4. ~6''0E,'2i~0? 1;:18 2do^^.~-,226515 MIATERIAL TESTING Pt;GE 01;!('11 /~ PAOE ftt OF e ~ ~'~~c pE~telON DA7E 61F2007 111 YYY ~~, r-• ...I Ra90!}:F12U.'i.R_°vORTS12C0- TES ING ~ asmato3~s~~Pr>roG7~v_C.DOC 1N5 ECTION ~ Environmental Ser ices ^ Geotechnicat Engineering ^ Construction Materials Testing ^ Special Inspections Milce Ser d Plial.ne: {203) 33G_ 9500 Kreizenbe k Construction Fax: (203) 33G- 7444 2~ 1 East F ont Street, Suite 1 I O Other: Boise, TD 3702 Project: Meridian Water Department Inspector: Charles Kaiser, E.I.T. Tnsnection Date: b .June 2007 INSPECTION REPORT Qn the above dot .our representative performed ~~+~ork on the referenced project as reported below. MTI personnel. art7ti~ed on site to visually assess exposed subgrade for curb and gutter and existing parkixtg lot extension for the rove referenced. project. Representa.tivcs from both Kreizcnbeck Constructors and Meridian City VE'ater Depart ent were nn site during the inspectivn_ exposed subgrade was found through probing tv be soft and yielding r both the curb & gtrtter and. parking lot extension: Existing parking lot was observed to have geotextile .fa ie overlain with 6 inches of sub-base and 4 inches of base course. M'TI recommends: • Curb & gu~ter along the east side of the parking area -- over-excavate existing dark browm fat clay soils to ftrrrt an.d.Ilunyielding sandy silt soils. An excavation depth of G inches can be expected.. • Extension f existing parking Lot to the west -place geotextile fabric (Goatee 0300 or equivalent) on existing so & yielding clay soils. Fabrzc must overlap the existing fabric in the pazking area approximat ly I''/z feet. • Upon over- xca.vation of the subgrade under the curb & guuter anal placement of geotextile fabric for. the parking lot xterisi.on, contractor may proceed ~~ath. the pl.accment of structural f Ll._ Structural fill must be placed i maximum 12-inch thick loose lifts and be compacted to at least 9~% of the maxirnurn dry density as d - tcrmined by AST)/i D-698. Tf you. have questio}ts concerning this report (rpt067,gen), please contact us immediately. Rcspectfuily Supmi IVI~TERIALS TE ~~~ Charles Kaiser, E.1 Staff Engineer Revierued by: 1 SZa f f Et~`~i~~eer CC: Max Jcnscn, Cit<~ of ]jcrard, Kreizenbed: Con: TING & INSPECTION, INC. Miran~outes, E.i.T. ]7oug 1Vatspn, ARS Architects: Daunt 1~ihitman. City of Meridian; Greg t.eishtnan. Stapley~ Engineering; Mike Jason T)~nsmcr, The Lsnd Group 2791 S. Victory View Way Boise, Idaho 837D3 (208} 376-47413 ~ Fax (2t]ti} 3z1-65is mtiaG?mti-id.com • www.mti-id.com rom, xxxxx Rev o MATEN TESTIN ~N:SPEC Q Environmental Ser I LS DAILY INSPECTION F~EPORT £s - IOi'd vi os ~ Geotechnical En ineerin :_] Construction Materials Testin O S ecial In s ections Date: __~._~r..~ Contractor Name' _ Inspector Name:. // _ MTI Fite #; ~~p ~ySs~-~ Project Name:~~g~ ~/~ ~~ ~n7'"' ~ ~_~+~_k Permit ~: _ _ PII_ "__~~A~=.g:~_ ~.__ _ Weather:~1u ~T _Le~cJ ~p s REMARKS n ~ // ~_ ~ Pi v F !S n S: 1`F ~ / 13 [r o~ (~ r'n ~ ~s < ~' ~[ t..~/ t~ ~ C~ (d , T . ` Y C --•, ~ i - i f ~tt~ 2 ~~ _~ T' a ~.. ~ ~ L ' ~ / . tfvl*'' Pcs lr~(.. .~ r t~ 2 791 S. Victory View Way, Boise, ID 63709 208 37o-47A8 FaX 208 322-6515 E-Mdi! mtiC~mti-id.com www.mti-id.com