Loading...
HomeMy WebLinkAboutChange Order No. 1 with Joslin Millwork, Inc. for Water Department Building~. x,..11. ',A e. /" .l!_ .et A ~1 ~~~`~ ~ ~ 2007 i;tLy~ ~t 1V1~r°olarf M mo ':;its 4~1ttirk ~ffic~: To: Will Berg; Tara Green From: Max Jensen, Engineering Technician CC: Len Grady, P.E., City Engineer Ridc Clinton, Water Department Superintendent Date: 9/13/2007 Re: Proposed Agenda Item for September 18, 2007 City Council Meeting The P blic Works Department respectfully requests the following item ne ptacea vn urC Seote ber 18, 2007 City Council agenda, under Consent Agenda, for Council's Chan Order No. 1 for the Water Division Buildin o' t construction - Joslin Miitwoni; Inc . dditional plumbing work is required for the completion of the new Water Division Buildin This change order wnsists of the following work and amounts to 1.4% of the constru ion contract: Provide all labor and materials to install a laminate top at the pass through window. Kreize Constructors (The City of Meridians' project construction managers) prepared and su miffed the change order. Thank this rte :commended Council Action: The Public Works Department recommends at City Council approves Change Order No. 1 for the Water Division Building oject (construction - Joslin Millwork, Inc.) for $368.00 and authorize the ayor to sign it. u for your consideration. Please contact me if you have any questions regarding From the desk of... Max Jensen Engineering Technician Meridian Public Works Department 660 E. Watertawer, Suke 200 Meridian, Idaho 83642 Phone: (208) 898-5500 Fax: (208)898-9551 jensenmQmeridiandty.org • Page CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CHANGE ORDER NO. 1 PROJECT NO. 0607a DATE: 09/13/07 EFFECTIVE DATE: CONTRACT CHANGE ORDER CONT CTOR: Joslin Millwork, Inc. PROJE T: Water Division Building The Con rector is hereby directed to make the following changes from the Contract Documents and 1) Provid~ all labor and materials to install a laminate top at the pass through window. reason >tor Change Order: Construction progress. 4ttachm nts: AIA Document G701/CMa - 1992 Change Order -Construction Manager-Advisor Edition Submitted b Kreizenbeck Constructors HANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMI Original ontract Price $ 25,950.00 Original Contract Times: Completion Net chan es form previous Change Orders Net changes fom- previous Change Orders No._0_ t 0_ No._ to _ (calendar days) $0.00 None rice Prior to this Change Order: .~~ se (decrease) of this Change Order: with all Approved Change Orders: Contract Times prior to this Change Order: (calendar days or date) Net Increase (decrease) of this Change Order: (calendar days or date) Completion by Contact Times with all Approved Change Orders: (calendar days) $26,31 RECOM IENDED: (CONSTRUCTION MANAGER) ACCEPTED: (CONTRACTOR) See provided AIA signed change order See provided AIA signed change order By: By: APPROV D: (CITY PURCHASING AGENT) COUNCIL APPROVAL By: Keit Watts Date: Date: APPROV D: (CITY) - ATTEST: By: May r Tammy de Weerd By: City Clerk. Will Berg Jr. Date: Date: =:~.= Document G7011CMaTM -1992 Chan~e Order -Construction Manager Ad viser Edition PROJECT a Meridian st me and address): CHANGE ORDER NUMBER: 001 OWNER: et Departnnent Building 06- INITUITION DATE: August 03, 2007 CONSTRUCTION MANAGER: 021 ARCHITECT: 2235 No we st 8th Street CONTRACTOR: Meridian, 083642 FIELD: TO CONT C TOR (Name and address): PROJECT NUMBERS: 06-021 /6400 OTHER; ^ Joslia Mill o rk, Inc. CONTRACT DATE: February 20, 2007 6467 Supp Way CONTRACT FOR: General Boise, I 83716 Constmction ICR No. R E -3248 Public Wo license No.11192-B- 4(06200) THE CON C7 IS CHANGED AS FOLLOWS: 1) Provide labor and materials to install a laminate top at the pass through window. All work to be completed as per PR # I as prepared b B RS Architects. $ 3~'~ The on ~ Contract Sttm was S 25,950.00 S 0.00 Net Chang b y previously authorized Change Orders S 25,950.00 The Con t Sum prior to this Change Order was f 368.00 The Con Sum will be increased by this Change Order in the amount of The new C n tract Sum including this Change Order will be f 26,318.00 The Con t Time will be unchanged by Zero (0) days. The date o S ubstantial Completion as of the date of this Change Order therefore is NOTE: Th' summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Puce which have been autho zed by Construction Change Directivc. NOT VALID U NTIL SIGNED BY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR. 1{reizen LLC DBA Kreizenbeck Constructors CONSTRU N MANAGER (Firm name) 251 East F t Street, Suite 110, Boise, Idaho 83702 ADD , BY (Sign t'I Michael J. re) ,1,3 D erard (Typed ) TE: Josiin Mill ork, Inc. CONTRA OR (Firm name) 6467 Supp y Way, Boise, Idaho 83716, ICR No. RCE-32AS, Public Wo license No.11192-B-4(06200 ADDRESS ~ BY (Signs re) ~ „ t;? ~ ~ ' 13 i ~ (Typed na e) DATE: AIA Docum~ protected by may result ii by AIA softwa User Notes: BRS Architects ARCHITECT (Firm name) 1010 S. Allaate Street, Suite 100, Boise, ID 83709 AD / ( rgnamre) ~~~ Clinton Yaks (Typed name) DATE: City of Meridian OWNER (Finn name) 660 East Watertower, Suite 200, Meridian, Idaho 83642 ADDRESS BY (Signature) Brad Watson (Typed name) DATE: nt G7011CMaTM -19p2. Copyright ®1992 by The American Institute of Architects. All rights reserved. waHninG: i nis AAA uocu,ne,n ~~ U.S. Copyright Law and Imernational Treaties. Unauthorized reproduction or distribution of this AIA" Document, or any portion of it. i severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced ve at 16:17:47 on 08/06/2007 under Order No.1000280013_t which e~ires On 1/17!2008, and ib not tar resale. (405294579) RPR-30-2007(h10h1}~ 06:17 Joslin Mittwork Inc. ~ ~U Custom C_ahinet & illworlc PR (208) 342-5550 6167 supply W8y 1~AX (:Ut;) 342-7772 saisc, TD R37 ] To: reizenbeck Constructors, Irtc. 51 East Front Street, Suite 11D oise, ID 83702 hon© (208) 336-9500 Fax (208) 336-7444 Attention : $randon Byington Project Desc. :Meridian Water Department P_R.#1 Terms :Per Contract Documents Delivery Dafe . ~ : n/a Idaho Contr3ctpr License # RCS-3248 Public Works tense # 11192-t3-4(06200} We are pleased to quote the following Installed. Item~~~~v~ - No De$cripti n 1 Plastic L urinate Pass-Thru Counter 2 Standard Grade 3 x 8 3 Wood St ck 3!4 4 x 8 Raw Straw Core 4 01_ Admi istr3tive 5 02. Shop Drawings 6 03. Layo t 8~ Measure 7 04. Cut ut 8 07. Asse bly 9 10. Ptasti laminate & veneering 10 Installati Per Hour Project Id Ship Via P.O. hVumber Salesperson Quotation Dato 04/30107 . #4188 Our truck Na Stevo Joslin untt aty Unit Price Prico 1 ea. 58.80 62.33 32 sq. ft. 1.19 40.36 .5 hr. 65.80 32.90 _25 hr. 65.80 16.45 .25 hr. 6580 16.45 .25 hr. 47.36 11.84 _5 hr_ 47.38 23.69 .5 hr. 47.38 23.69 2.5 hr. 56.00 140.OD TOTAL $368.00 All material 's guarsnteed to be as specified. All wprk to ©compleled in 8 workmanlike manner according to standard praciices_ Labor and aterials are warranteed for ono yoar. ~. . nuffibr'irs $iyr Muro (FRS}20S 3~2 7772 P 001/QOl