HomeMy WebLinkAboutChange Order No. 1 with Crawford Door Sales of Idaho for Water Department Building
~~-~` ~ :~ 2007
~;~:ty v~ lv~~~a~~
~it~ Clerl~ ()f-ice
To:
From•
CC:
Date:
Re:
mo
Will Berg; Tara Green
Max Jensen, Engineering Technician
Len Grady, P.E., Ciiy Engineer
Ridc Clinton, Water Department Superintendent
9/13/2007
Proposed Agenda Item for September 18, 2007 City Council Meeting
The P blic Works Department respectfully requests the following item be placed on the
Septe ber 18, 2007 City Council agenda, under Consent Agenda, for Council's
.IV ~~c~avl vIr IJIVII uU11V 111 IV Glil WIIAU UI.UIJII - VIi1A1V1Y ~JVVI
Sales f Idaho Inc.. Additional parts are required for the completion of the new Water
Divisio Building. This change order consists of the following work and amounts to 12.77%
of the nstruction contract:
• Provide additional labor and materials to install high lift track with wall mounted
operators for overhead doors in lieu of specified materials as per the direction of the
and
Thank
this iter
Constructors (The City of Meridians' project construction managers) prepared
i the change order.
Recommended Council Action: The Public Works Department recommends
that City Council approves Change Order No. 1 for the Water Division Building
project (construction -Crawford Door Sales of Idaho, Inc.) for $875.00 and
authorize the Mayor to sign it.
for your consideration. Please contact me if you have any questions regarding
From the desk of...
Max Jensen
Engineering Technidan
Meridian PubNc Works Department
660 E. Watertower, Suite 200
Meridian, Idaho 83642
Phone: (208)898-5500
Fax (208) 898.9551
jensenm(g2meridianctity.org
~ Page
CITY OF MERIDIAN
33 EAST IDAHO
MERIDIAN, ID 83642
CONTRACT CHANGE ORDER
CHANGE ORDER NO. 1
PROJECT NO. 0607a
DATE: 09/13/07
EFFECTIVE DATE:
CONT CTOR: Crawford Door Sales of Idaho, Inc.
PROJE T: Water Division Building
The Co tractor is hereby directed to make the following changes from the Contract Documents and
Plans.
Descri on:
1) Provi all labor and materials to install high lift track with wall mounted operators for overhead doors
in lieu of specified materials as per the direction of the Owner.
Reason or Change Order: Construction progress.
Attach nts: AIA Document G701/CMa - 1992
Change Order -Construction Manager-Advisor Edition
Submitted by Kreizenbeck Constructors
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original ~ontract Price $ 6,850.00 Original Contract Times: Completion
Net cha ges form previous Change Orders Net changes form previous Change Orders
No._0_ t 0_ No._ to _ (calendar days)
$0.00 None
Contract Price Prior to this Change Order: Contract Times prior to this Change Order:
(calendar days or date)
$6,850 00
Net Incr ase (decrease) of this Change Order: Net Increase (decrease) of this Change Order:
(calendar days or date)
$875.0 Completion by
Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders:
(calendar days)
$7,725 00
RECOM ENDED: (CONSTRUCTION MANAGER) ACCEPTED: (CONTRACTOR)
See rovided AIA signed change order See provided AIA signed change order
By: By:
Date: Date:
APPRO ED: (CITY PURCHASING AGENT) COUNCIL APPROVAL
By: Kei Watts
Date: Date:
APPRO ED: (CITY) - ATTEST:
By: Ma Tammy de Weerd By: City Clerk, Will Berg Jr.
Date: Date:
- ® ~
==' Document G701/CMa -1992
Chang Order -Construction Manager-Adviser Edition
PROJECT /N rnm and addreas)r CHANGE ORDER NUMBER: 001 - OWNER:
Meridian W ter Department $uilding (1fi- i1BT1AT10N DATE: August 02, 2007 CONSTRUCTION MANAGER:
021
2235 North cst 8th Strcct ARCHITECT:
Meridian. Id o 83642 CONTRACTOR:
TO CONTRA OR (Nacre curer addresslr PROJECT NUMBERS: 06-021 / 8300 FIELD:
Crawford r Sale. of Idaho. Inc. CONTRACT DATE: February 20, 2007 OTHER: ^
4951 $c-dlc Strcct CONTRACT FOR General
Suite $ Catstrt-ction
$oisc.ldaho 8?714
ICR No. RC -4632
Public Work Liccnsc No. 14857-A-
4((m ux))
THE CO CT IS CHANGm AS FOLLOWS:
)) Provide a ditional labor and materials to install high till tack with wall mounted operttor Inc overhead dcxm in lieu of
specified -na erials as per the direction of the Owner. $ 875.(NI
Thc original ontrrcl Sum was = 6,850.00
Nct change y previously authorized Change Order f 0.00
Thc Contras Sum prior to thir• Change Order was : 6,850.00
Thc Contras Sum will tk increased by this Change Order in the amowlt o1' : 875.00
Thc new Crn tract Sum including this Change Order will be : 7,725.00
Thc COn1rJC Time will be unehrnged by Zero t (1 1 days.
Thc date of ubstantial Completion as ol'the date of this Clwngc (hdcr tl-emlorc ix
NOTE: This ummary does not rcllect changes in the Contract Sum. Contract Time or Guaranteed Mrximum Price which have
been authori ed by Construction Change Directive.
NOT VALID L SIGNED BY THE OWNER, CONSTRUCTpN MANAGER, ARCHITECT AND CONTRACTOR
Krciunbcck LLC DBA Krcizenbcck Constructor $RS Architects
CONS MANAGER U-~irnr nacre) ARCHTTECT (Finn nome)
2S I East Fm t Strcct. Suite 110. $oisc. Idaho 83702 I0l(1 S. Allantc Street. Suite I(x). $oisc. (D 837(1`)
ADDRE ~
BY (Si,tnann •) / BY LSir;nurnre)
b Michael J. B card d Clinton Yaka ~~ /~~~
f7:-•pcd ram DA (Typed name)
Crawford r Sales nl Idaho. hte• City of Meridian
CONTRACT (/•7rnr nanrc•) OWNER I/~rnn „nruel
4951 $radlc Strcct. Suilc $. $oisc. Idaho 83714. ICR No. G60 Eaxt Watcrtowrr. Suite 2(x1. Meridian. Idaho 8?h42
RCE-4632, ublic W License o 14857-A-4 08100)
S, / , ADDRESS
) e BY (.Sirruunrrc 1
` •~ • ~ l ~ ~,1 ~ ~ I Sl Brad Watson
~(t c-t 1~~ta~t~.• DATE: (Typed name) DATE:
AIA Documei
protected by
may result in
by AIA softwa
User Netes:
~~~ ~~~~. •- - rasz. copyngM to 7992 by The American Institute of Architects. All rights reserved. WARNING: This AIA' Document is
S. Copyright Law and International Treaties. Unauthorized reproduction ar distribution of this AIA• Document, or any portion of it,
~vere civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This doctartenl was produced
at 15:10:22 On 08102/2007 under Order No.1000200013_1 which expires on 1/17/2008, and is not for resale.
(2813877824)
~'~ ..
~' ~',.
-,~'=OHM CkH,l~a-Uf:'D I~OGR ~;Al_~'~~
1
V~C-~Y ti ~ _i(1~7~~ y~}}l~~ijJ ~JtY .KY 1.3L .6i1 '
P.O. Box 1.Q~01S8
Crarden City, Idaho 83714
'1e1. (248) 375.-6410
~'~ (ZOS) 375-.6474
ID PUBLIC WC~RI~:.S I.IC.1tiTI1.3.4~~7-t'i.-4047}
Id~eho Lic. Na. RCE,-4G32
To:
1~e
This
33~'iz?gtau 1?roject; Meridian ~atcr I~egarrTnent I31d~=.
peck Constzuators Meridian, Idaho
ing prices are far the proposed Iisg12 Riled track and wall mounfcd operators;
is for adding 4'-6" of high Iii ~;th wall, mounted iuotor oper3lnrs in lieu a~
liffi tracl~ with trolley motor apcratc~rs - Rdcl $6~0.(~€i to tE~e cvr~tr~~ct artzot~ul.
B ar #IOI .,
This c st is for adding roof slope hack With pushers and a v,~all mounted mover operator
in lie oPstandt~rd lift track with.a trolley motor ogeratar - ~.dd 5235,0 to ttte eoatrark
contact zne if you have any questions.
Date:
by;
~_
-- 11~c1t.~el J. Beltrani
VP - Gener3i I4lanager
Date: I1~I~trcli 1.4, 2007