Loading...
HomeMy WebLinkAboutChange Order No. 1 with Crawford Door Sales of Idaho for Water Department Building ~~-~` ~ :~ 2007 ~;~:ty v~ lv~~~a~~ ~it~ Clerl~ ()f-ice To: From• CC: Date: Re: mo Will Berg; Tara Green Max Jensen, Engineering Technician Len Grady, P.E., Ciiy Engineer Ridc Clinton, Water Department Superintendent 9/13/2007 Proposed Agenda Item for September 18, 2007 City Council Meeting The P blic Works Department respectfully requests the following item be placed on the Septe ber 18, 2007 City Council agenda, under Consent Agenda, for Council's .IV ~~c~avl vIr IJIVII uU11V 111 IV Glil WIIAU UI.UIJII - VIi1A1V1Y ~JVVI Sales f Idaho Inc.. Additional parts are required for the completion of the new Water Divisio Building. This change order consists of the following work and amounts to 12.77% of the nstruction contract: • Provide additional labor and materials to install high lift track with wall mounted operators for overhead doors in lieu of specified materials as per the direction of the and Thank this iter Constructors (The City of Meridians' project construction managers) prepared i the change order. Recommended Council Action: The Public Works Department recommends that City Council approves Change Order No. 1 for the Water Division Building project (construction -Crawford Door Sales of Idaho, Inc.) for $875.00 and authorize the Mayor to sign it. for your consideration. Please contact me if you have any questions regarding From the desk of... Max Jensen Engineering Technidan Meridian PubNc Works Department 660 E. Watertower, Suite 200 Meridian, Idaho 83642 Phone: (208)898-5500 Fax (208) 898.9551 jensenm(g2meridianctity.org ~ Page CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 1 PROJECT NO. 0607a DATE: 09/13/07 EFFECTIVE DATE: CONT CTOR: Crawford Door Sales of Idaho, Inc. PROJE T: Water Division Building The Co tractor is hereby directed to make the following changes from the Contract Documents and Plans. Descri on: 1) Provi all labor and materials to install high lift track with wall mounted operators for overhead doors in lieu of specified materials as per the direction of the Owner. Reason or Change Order: Construction progress. Attach nts: AIA Document G701/CMa - 1992 Change Order -Construction Manager-Advisor Edition Submitted by Kreizenbeck Constructors CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original ~ontract Price $ 6,850.00 Original Contract Times: Completion Net cha ges form previous Change Orders Net changes form previous Change Orders No._0_ t 0_ No._ to _ (calendar days) $0.00 None Contract Price Prior to this Change Order: Contract Times prior to this Change Order: (calendar days or date) $6,850 00 Net Incr ase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days or date) $875.0 Completion by Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $7,725 00 RECOM ENDED: (CONSTRUCTION MANAGER) ACCEPTED: (CONTRACTOR) See rovided AIA signed change order See provided AIA signed change order By: By: Date: Date: APPRO ED: (CITY PURCHASING AGENT) COUNCIL APPROVAL By: Kei Watts Date: Date: APPRO ED: (CITY) - ATTEST: By: Ma Tammy de Weerd By: City Clerk, Will Berg Jr. Date: Date: - ® ~ ==' Document G701/CMa -1992 Chang Order -Construction Manager-Adviser Edition PROJECT /N rnm and addreas)r CHANGE ORDER NUMBER: 001 - OWNER: Meridian W ter Department $uilding (1fi- i1BT1AT10N DATE: August 02, 2007 CONSTRUCTION MANAGER: 021 2235 North cst 8th Strcct ARCHITECT: Meridian. Id o 83642 CONTRACTOR: TO CONTRA OR (Nacre curer addresslr PROJECT NUMBERS: 06-021 / 8300 FIELD: Crawford r Sale. of Idaho. Inc. CONTRACT DATE: February 20, 2007 OTHER: ^ 4951 $c-dlc Strcct CONTRACT FOR General Suite $ Catstrt-ction $oisc.ldaho 8?714 ICR No. RC -4632 Public Work Liccnsc No. 14857-A- 4((m ux)) THE CO CT IS CHANGm AS FOLLOWS: )) Provide a ditional labor and materials to install high till tack with wall mounted operttor Inc overhead dcxm in lieu of specified -na erials as per the direction of the Owner. $ 875.(NI Thc original ontrrcl Sum was = 6,850.00 Nct change y previously authorized Change Order f 0.00 Thc Contras Sum prior to thir• Change Order was : 6,850.00 Thc Contras Sum will tk increased by this Change Order in the amowlt o1' : 875.00 Thc new Crn tract Sum including this Change Order will be : 7,725.00 Thc COn1rJC Time will be unehrnged by Zero t (1 1 days. Thc date of ubstantial Completion as ol'the date of this Clwngc (hdcr tl-emlorc ix NOTE: This ummary does not rcllect changes in the Contract Sum. Contract Time or Guaranteed Mrximum Price which have been authori ed by Construction Change Directive. NOT VALID L SIGNED BY THE OWNER, CONSTRUCTpN MANAGER, ARCHITECT AND CONTRACTOR Krciunbcck LLC DBA Krcizenbcck Constructor $RS Architects CONS MANAGER U-~irnr nacre) ARCHTTECT (Finn nome) 2S I East Fm t Strcct. Suite 110. $oisc. Idaho 83702 I0l(1 S. Allantc Street. Suite I(x). $oisc. (D 837(1`) ADDRE ~ BY (Si,tnann •) / BY LSir;nurnre) b Michael J. B card d Clinton Yaka ~~ /~~~ f7:-•pcd ram DA (Typed name) Crawford r Sales nl Idaho. hte• City of Meridian CONTRACT (/•7rnr nanrc•) OWNER I/~rnn „nruel 4951 $radlc Strcct. Suilc $. $oisc. Idaho 83714. ICR No. G60 Eaxt Watcrtowrr. Suite 2(x1. Meridian. Idaho 8?h42 RCE-4632, ublic W License o 14857-A-4 08100) S, / , ADDRESS ) e BY (.Sirruunrrc 1 ` •~ • ~ l ~ ~,1 ~ ~ I Sl Brad Watson ~(t c-t 1~~ta~t~.• DATE: (Typed name) DATE: AIA Documei protected by may result in by AIA softwa User Netes: ~~~ ~~~~. •- - rasz. copyngM to 7992 by The American Institute of Architects. All rights reserved. WARNING: This AIA' Document is S. Copyright Law and International Treaties. Unauthorized reproduction ar distribution of this AIA• Document, or any portion of it, ~vere civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This doctartenl was produced at 15:10:22 On 08102/2007 under Order No.1000200013_1 which expires on 1/17/2008, and is not for resale. (2813877824) ~'~ .. ~' ~',. -,~'=OHM CkH,l~a-Uf:'D I~OGR ~;Al_~'~~ 1 V~C-~Y ti ~ _i(1~7~~ y~}}l~~ijJ ~JtY .KY 1.3L .6i1 ' P.O. Box 1.Q~01S8 Crarden City, Idaho 83714 '1e1. (248) 375.-6410 ~'~ (ZOS) 375-.6474 ID PUBLIC WC~RI~:.S I.IC.1tiTI1.3.4~~7-t'i.-4047} Id~eho Lic. Na. RCE,-4G32 To: 1~e This 33~'iz?gtau 1?roject; Meridian ~atcr I~egarrTnent I31d~=. peck Constzuators Meridian, Idaho ing prices are far the proposed Iisg12 Riled track and wall mounfcd operators; is for adding 4'-6" of high Iii ~;th wall, mounted iuotor oper3lnrs in lieu a~ liffi tracl~ with trolley motor apcratc~rs - Rdcl $6~0.(~€i to tE~e cvr~tr~~ct artzot~ul. B ar #IOI ., This c st is for adding roof slope hack With pushers and a v,~all mounted mover operator in lie oPstandt~rd lift track with.a trolley motor ogeratar - ~.dd 5235,0 to ttte eoatrark contact zne if you have any questions. Date: by; ~_ -- 11~c1t.~el J. Beltrani VP - Gener3i I4lanager Date: I1~I~trcli 1.4, 2007 i