HomeMy WebLinkAboutACHD Commentsf
Ada County Highway District
Dave Bivens, 1st Vice President
Judy Peavey-Derr, 2nd Vice President
Susan S. Eastlake, Commissioner
Sherry R. Huber, Commissioner
February 27, 2003
TO: Eagle Road, LLC
P.O. Box 250
Show Low, AZ 83902
FROM: Craig Hood
Senior Development Analyst
ACRD Planning & Development
SUBJECT: MMI03-001
Garden City ID 83714-6499
Phone (208)367-6100
FAX (208)387-6391
E-mail: tellus@ACHD.ada.id.us
RECEIVED
MAR - 4 2003
City of Meridian
City Clerk Offioe
Hampton Inn Hotel Site Modification (Fallon Greens Subdivision)
875 S. Allen Street
The Ada County Highway District (ACRD) staff has received and reviewed the miscellaneous
application and modified site plan for the item referenced• above. In January of 2002, ACRD staff
inspected the subject site and prepared a staff report. The modified site plan for Fallon Greens
Subdivision (Hampton Inn) is in general conformance with the previously prepared staff
report for the site. ACRD is submitting this letter to address the changes/modifications that affect
the previously approved staff report and site-specific conditions (see attached).
The Ada County Highway District (ACRD) currently maintains Allen Street and Freeway Drive
abutting the site, and thus ACRD is submitting the following comments.
+ The proposed 80-room hotel complex and 35,500 square foot office buildings are expected to
generate 1,049 additional vehicle trips per day (0 existing) based on the Institute of
Transportation Engineers Trip Generation Manual. There will be an impact fee that is
assessed and due prior to issuance of any building permit(s) on the site. The fee will be
based on the impact fee ordinance in effect at that time. In addition to the standard impact
fee, this development lies within an extraordinary impact fee area. Therefore, this property
should pay an overlay fee to the District in the amount of $43.19 per trip to reimburse the
costs of construction and right-of-way costs for the new road from the intersection of Eagle
Road and St. Luke's driveway to the intersection of Magic View Drive and Allen Street as the
proportionate share of this property on a per trip basis.
+ Since the original report was prepared for this site, ACHD's standard locallcommercial right-
of-way dimensions have changed. Therefore, the applicant has two options regarding Allen
Street and Freeway Drive right-of-way (Site-Specific Condition #1). In accordance with
current District policy, the applicant may either dedicate 29-feet of right-of-way or 27-feet of
right-of-way.
+ With the original submittal, the applicant was proposing three driveways into the site (Site-
Specific Condition #8). The modified site plan shows one driveway on Allen Street, located
approximately 30-feet south of the north property line and in alignment with an existing
driveway on the east side of Allen Street, and one driveway on Freeway Drive located near
the west property line. These modified driveway locations meet District policy and should be
approved.
The previous conditions and requirements approved with MPFP01-010/MCUP01-044, Hampton Inn
Subdivision, still apply to MMI03-001. If you have any questions, please feel free to contact staff at
(208) 387-6170.
Senior Development Analyst
ACHD Planning & Development
Cc: Planning & Development/chron/project file
City of Meridian
pinnacle Engineers, Inc., C/O Clint Boyle, 12552 W. Executive Drive, Ste. B, Boise, ID 83713
Attachment:
1. Hampton Inn Subdivision Staff Report
..n~',~17~~.
Ada County Highway District
ilavirl F Wvnknnn Precirlent 31 S East 37th Street
Dave Bivens, I st Vice President
Judy Peavey-Den, 2nd Vice President
Susan S. Eastlake, Commissioner
Sherry R. Huber, Commissioner
Garden CSty H) 83714-6499
Phone (208)387-6100
FAX (208) 387-6391
E-mail [ellusla~ACHD.ada.id.us
February 27, 2003
Meridian Hampton Center, LLC
P.O. Box 50941
Sparks, NV 89435
Re: Staffl.evel Approval
Preliminary Plat: Hampton Inn
MPFP01-O10/MCUPOI -044
Facts and Findings:
875 South Allen Street Hotel and two office buildings
A. The Ada County Highway District (ACRD) staff has received the above referenced application
requesting preliminary plat approval to plat a 3 lot commercial subdivision, and conditional use
approval to construct a 92-room hotel complex, an 18,000-squaze foot office building and a
7,500 square-foot office building. The 4.10-acre site is located on the northwest side of the
intersection of Allen Street and Freeway Drive, approximately''/4- mile east of Eagle Road. This
development is estimated to generate 1034 additional vehicle trips per day (0 existing) based on
the Institute of Transportation Engineers Trip Generation Manual.
B. The application and site plan stamped and received by the City of Meridian on January 2, 2002,
and submitted to the District on January 8, 2002, has been reviewed by the ACRD Planning and
Development staff and conforms to applicable District standazds/policy, or can be made to
conform with the change(s) to the plan described in the requirements stated below.
C. This is a staff level approval and will not be heazd by the ACRD Commission unless the site plan
is changed in such a manner as to not conform to District standazds/policy or an appeal of the
Planning and Development staff decision is submitted as described within the Stdazd
Requirements outlined below.
D. On January 14, 2002, the District Planning and Development staff inspected this site and
evaluated the transportation system in the vicinity. On January 18, 2002, the staff met as the
District's Technical Review Committee and reviewed the impacts of this proposed development
on the District's transportation system. The results of that analysis constitute the following Facts
and Findings and recommended Site Specific Requirements.
S:\DSTECIiLSlJBSIHampton Inn.doc
Page 1
E. For the purposes of estimating daily trip generation and assessing impact fees for this project, the
proposed use of this development has been classified as hotellgeneral office. (Per the ITE
Manual) The impact fee rate from the fee tables for this use is $2,169 per thousand square feet of
gross building area for the office buildings and $853 per room for the hotel, based on the impact
fee ordinance in effect at this time. Note: This rate is provided for informational purposes
only and shall not be construed as an impact fee rate certification. The impact fee will be
assessed at the time of plans acceptance by District staff, and shall be based on the fee
tables and provisions of the District's Impact Fee Ordinance in effect at that time.
F. Development patterns in the surrounding area are commercial and office based uses. Based on
development patterns in this area and the resulting traffic generation, staff anticipates that the
transportation system will be adequate to accommodate additional traffic generated by this
proposed development at accepted levels of service with modification to Allen Street and
Freeway Drive. The additional traffic generated by this development will have minimal
detrimental impact on the transportation system.
G. The Commission adopted an extraordinary fee based on trip generation rates. The Commission
determined that the Extraordinary Impact Fee would be $43.19 per trip. This parcel includes 4.10-
acres, resulting in a trip generation rate of approximately 1034-trips per day, for a hotel and 2 office
buildings. Therefore, this property should pay an overlay fee to the District in the amount of
approximately $44,658.46. Staff recommends that the Commission require the payment of that
amount into a fund for the reimbursement of cost to construct and dedicate right-of--way for a new
road from the intersection of Eagle Road and St. Luke's driveway to the intersection of Magic View
Drive and Allen Drive as the proportionate share of this property on a per trip basis.
Special Recommendations to the City of Meridian:
1. The applicant should provide the District with a copy of a recorded access easement among the
parcels for use of the driveways for access to the public streets prior to approval.
The following Site Specific Requirements and Standard Requirements must be met or provided
for prior to ACRD approval of the final plat:
Site Specific Requirements:
1. Dedicate 29-feet of right-of--way from the centerline of Allen Street abutting the parcel by
means of recordation of a final subdivision plat or execution of a warranty deed prior to
issuance of a building pemut (or other required permits), whichever occurs first. Allow up to
30 business days to process the right-of--way dedication after receipt of all requested material.
The owner will not be compensated for this additional right-of--way because Allen Street is a
local commercial street and is to be brought to adopted standards by the developers of abutting
properties.
2. Construct curb, gutter, 5-foot wide concrete sidewalk and match paving on Allen Street
abutting the parcel. Irrtprovements shall be constructed to one-half of a 40-foot street section.
S:~DSTECH~SUBS1Hampton Inn.doc
Page 2
3. Construct curb, gutter, 5-foot wide concrete sidewalk on Freeway Drive abutting the parcel.
Improvements shall be constructed to one-half of a 40-foot street section.
4. Utility street cuts in pavement less than five years old are not allowed unless approved in
writing by the District. Contact ACI3D's Utility Coordinator at 387-2516 or 378-6258 (with
file number) for details.
5. Meet District drainage requirements per section 8000 of the ACRD Development Policy
Manual. Contact District staff at 387-6170 for details.
6. If utility relocation is necessary to construct improvements required with this development, then
all utility relocation costs associated with improving street frontages abutting the site should be
home by the developer.
7. Any existing irrigation facilities should be relocated outside of the right-of--way.
The applicant is proposing two driveways on Allen Street and one driveway on Freeway Drive;
:• Proposed driveway # 1 is located on Allen Street approximately 30-feet south of the northern
property line. This location meets District policy and is approved with this application. Pave the
driveway to its full-required width of 25 to 30-feet and to a point 30-feet beyond the edge of
pavement of Allen Street.
• Proposed driveway # 2 is located on Allen Street approximately 180-feet south of the northern
property line. This location meets District policy and is approved with this application. Pave
the driveway to its full-required width of 25 to 30-feet and to a point 30-feet beyond the edge of
pavement of Allen Street.
• Proposed driveway #3 is located on Freeway Drive approximately 150-feet from the
intersection of Allen Street and Freeway Drive. This location meets District policy and is
approved with this application. Pave the driveway to its full-required width of 25 to 30-feet and
to a point 30-feet beyond the edge of pavement of Freeway Drive:
9. Other than the access point(s) specifically approved with this application, direct lot or parcel
access to Freeway Drive and Allen Street is prohibited. Lot access restrictions, as required with
this application, shall be stated on the final plat.
Standard Requirements:
1. The Commission shall hear and decide appeals by an applicant of the final decision made by the
ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this
section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law,
abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the
ACfID Policy Manual.
S:~DSTECH~SUBS~I-Iampton Inn.doc
Page 3
a. Filing Fee: The Commission may, from three to time, set reasonable fees to be
charged the applicant for the processing of appeals, to cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the
Secretary of Highway Systems, which must be filed within ten (10) working days
from the date of the decision that is the subject of the appeal. The notice of appeal
shall refer to the decision being appealed, identify the appellant by name, address
and telephone number and state the grounds for the appeal. The grounds shall
include a written summary of the provisions of the policy relevant to the appeal
and/or the facts and law relied upon and shall include a written argument in support
of the appeal. The Commission shall not consider a notice of appeal that does not
comply with the provisions of this subsection.
c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the
date of the filing of the notice of appeal to reply to the nofice of the appeal, and may
during such time meet with the appellant to discuss the matter, and may also
consider and/or modify the decision that is being appealed. A copy of the reply, and
any modifications to the decision being appealed will be provided to the appellant
prior to the Commission hearing on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the
appeal will be noticed and scheduled on the Commission agenda at a regulaz
meeting to be held within thirty (30) days following the delivery to the appellant of
the ROWDS Manager's reply to the notice of appeal. A copy of the decision being
appealed, the notice of appeal and the reply shall be delivered to the Commission at
least one (1) week prior to the hearing.
e. Action by Commission: Following the hearing, the Commission shall either affirm
or reverse, in whole or part, or otherwise modify, amend or supplement the decision
being appealed, as such action is adequately supported by the law and evidence
presented at the hearing.
2. Payment of applicable road impact fees are required prior to building construction in
accordance with Ordinance #195, also known as Ada County Highway District Road Impact
Fee Ordinance.
3. All design and construction shall be in accordance with the Ada County Highway District
Policy Manual, ISPWC Standazds and approved supplements, Construction Services procedures
and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered
in the State of Idaho shall prepare and certify all improvement plans.
4. The applicant shall submit revised plans for staff approval, prior to issuance of building permit
(or other required permits), which incorporates any required design changes.
5. Construction, use and properly development shall be in conformance with all applicable
requirements of the Ada County Highway District prior to District approval for occupancy.
S:IDSTECH~SUBS1Hampton Inn.doc
Page 4
6. Any change by the applicant in the planned use of the property which is the subject of this
application, shall require the applicant to comply with all rules, regulations, ordinances, plans,
or other regulatory and legal restrictions in force at the time the applicant or its successors in
interest advises the Highway District of its intent to change the planned use of the subject
property unless awaiver/variance of said requirements or other legal relief is granted pursuant
to the law in effect at the time the change in use is sought.
7. No change in the terms and conditions of this approval shall be valid unless they are in writing
and signed by the applicant or the applicant's authorized representative and an authorized
representative of the Ada County Highway District. The burden shall be upon the applicant to
obtain written confirmation of any change from the Ada County Highway District.
Conclusion of Law:
1. ACHD requirements are intended to assure that the proposed use/developmenttyill not place an
undue burden on the existing vehicular and pedestrian transportation system within the vicinity
impacted by the proposed development.
Should you have any questions or comments, please contact the ACRD Planning and Development
staff at 387-6170.
Sincerely,
Christy Richardson
Planning Review Supervisor
Right-of--Way & Development
cc: Project file
ACRD Construction Services
Lead Agency/City of Meridian
Chron
John & Alberta Sonntag
3373 Tumbleweed Ave.
Boise, ID 83713
Habitec Architects
Wes Steele
1250 E. Iron Eagle Dr. #200
Eagle, ID 83616
S:~DSTECI3~SUBS~iIampton Inn.doc
Page 5
Pinnacle Engineers, Inc.
Clinton E. Boyle
12252 W. Executive Dr., Ste. B
Boise, ID 83713
S:~DSTECH~SUBS~IIampton Im.doc
Page 6
~r I ~
~...~.I
i J
i
~ I
' ~i
~. .
I~
~~
- ~ f ~ .)I
E~
C~
D
m
N
.~ ~. ~ ~
,~.
~\ \
'~
~k
Q~
~\ \
~ \
~ \
r
Ic
~ \
~s \
s2~Rroy
'~
~~i
~ \ v~ h P _
. _~ ,.
\ ,~ ~
~ ` 1-.= - --- --
~-----
~ ---e-~----'- --~
~ ,
t~
~ ~ `It
~iE
~~~
?~~ it
~t
j[~~i9ti~3 ~ +.at.ate+ve. e~
+ ih;i~t '
';~~ •if ; ;'`e~~~~d~iiRi~i~it°irl~~~j;s'i;{~ ~~~[~iiiE,~ ~tj @ ~ ~
i ~ ~ i
~~~ii~i~ ~ t~j'~ji;{ ~{~~i~{~'t' i ~ ~r~~ fF~;~i~~#(~' j3 m
~~iFlt ;~ ~~ ` i i i t
~ iai ~~ a
t'
t ll~tj :i¢iteiiiii :i .. .... .... ~
3 ~. .E
f~i I!
i t
~--~/~
1 • i 1 . fi
~ '.:. ~ ~ S
0 9',