Loading...
HomeMy WebLinkAboutResponse to Staff ReportMessage Machelle Hill From: Bill Parsons Sent: Thursday, September 06, 2007 8:16 AM To: Machelle Hill Subject: FW: Intermountain Outdoor Subdivision PFP-07-003 (Comments from the Applicant) Good Morning Machelle, Page 1 of 2 Here are some comments the applicant submitted to Planning regarding the Intermountain Outdoor Subdivision PFP-07-003. Have a nice day, Bill Parsons Associate City Planner Meridian Planning Department 660 East Watertower Lane Suite 202 Meridian, Idaho 83642 PHONE: (208) 884-5533 FAX: (208) 888-6854 parsonsb~merdiancty. org From: Jane Suggs [mailto:jbsuggs@cableone.net] Sent: Wednesday, September 05, 2007 4:06 PM To: Bill Parsons Cc: 'Bill Strite'; denise.lauerman@ehmengineers.com; paul@harvestdesign.ty; Todd R. Waite'; brian.martens@ehmengineers.com Subject: Intermountain Outdoor Subdivision PFP-07-003 Hi Bill, Thanks for the sending the staff report on Friday and for our phone conversation today. We have the following comments on the conditions of approval: Condition 1.2.4: Just a clarification: The subdivision is located within the NMID and Settlers' District, but the property owners will own and maintain the on-site pressurized irrigation system. Condition 1.2.2: As we discussed, the 25' landscape buffer along the south property line of Lot 4 will be located almost entirely within the Jackson Drain (NMID). As noted in the staff report, the code "allows a 5' buffer width where the buffer is encumbered by easements or other restrictions". We plan to provide at least 5 feet of landscape buffer along the top of the bank and as noted in the condition, will submit the revised landscape plan to show the 5' buffer and plantings. However, we request that these plantings be installed at the time Lot 4 is developed. Lot 4 is a "tight" lot and landscaping materials will likely be destroyed during construction on the lot. Until Lot 4 is developed the apartments to the south are "buffered" by the empty lot. The building currently under construction on Lot 3 is 100 to 200 feet from the south property line. Please note that the landscaping along the Stonehenge Way street frontage of Lot 4 will not be delayed. Condition 1.2.13: We agree that cross-access to the property to the east should be provided at the time that property re-develops. We agree to add a note to the plat to address that condition. However, since the location of the cross-access connection is best constructed in cooperation with the re-development of that lot, we request that the driveway stub not be required at this time. Please let me know if you have questions about or problems with these requested changes to the conditions of approval. I can discuss them with the Commissioners on Thursday, but would like to know of your concerns, if 9/6/2007 Message any Thanks and see you Thursday, Jane Jane B. Suggs JBS Enterprises, LLC Land Development Consulting (208)342-6941 phone (208)342-6946 fax jbsuggs(a~cableone.net Page 2 of 2 9/6/2007