Loading...
HomeMy WebLinkAboutLetter No. 2 from Clint Boyle PINN 1\ CLE LETTER OF TRANSMITTAL RE: Engineers, Inc. 12552 W. EXECUTIVE DR., SUITE B, BOISE, ID 83713 PH (208) 887-7760 (208) 887-7781 FAX TO: o~ 0Jf ~ WE ARE SENDING YOU iJ" Attached 0 Under separate cover via 0 Shop drawings 0 Blueprints 0 SeplaslVeliums 0 11 x 17 drawing(s) 0 3 1/2" disk 0 Mylar/Ammonia Mylar 0 Copy of letter 0 Change Order 0 Calculations City Of Meridian City (',J",.1c Office - the following items 0 Specifications 0 Field Report 0 8-1/2 x 11 Drawing(s) 0 COPIES OATE REV. NO. DESCRIPTION I ::¡.\n.tJ:;!., '.1)1'<' ".r. \";'¡'p"'.' ^ I. . .,.) :¡1.,cfJA. \, qml!.4/L'" -¡'¡".rAL THESE ARE TRANSMITTED as checked below: III For review œ For your use 0 No exceptions taken 0 Make corrections noted 0 Resubmit - copies for approval 0 Submit - copies for distribution 0 As requested 0 For review and comment 0 Revise and Resubmit 0 Retum - corrected prints 0 0 FOR BIDS DUE - 0 PRINTS RETURNED AFTER LOAN TO US COpy TO: ~ I-e SIGNED~{\- PINNACLE Engineers, Inc. TO: Brad Hawkins-Clark, Interim Director Meridian Planning Department 660 E. Watertower, Suite 202 Meridian, 1083642 DATE: February 10,2003 RE: Silvercreek Subdivision (Lee Centers) Approx. 152 acres east of Linder Rd. approx. 1/3. mile south of Victory Rd. Dear Brad: As you are aware, we have been working with Ada County and Meridian staff, as well as the Meridian City Council, to determine a feasible option for the development of the referenced property. The property is currently approximately y., mile from Meridian City limits (within Meridian's Area ofimpact) in Ada County. Various scenarios have been discussed with the parties involved. As we discussed on Wednesday (February 5, 2003), you indicated that the Meridian City Planning staffwas most favorable with the scenario involving rezoning and platting a small portion of the overall site (approx. 39 urban size lots). Further, you were unaware that the developer was willing to limit the number of lots developed per year if the entire property were submitted for preliminary plat. You suggested that we prepare a concept or sketch plat for approval on the enili'e 152 acres (approx. 455 lots). My understanding is that with the approval of the concept or sketch plat by Ada County (with support fÌ'om the City of Meridian), the developer would then have general approval of the project. As you suggested, we are proceeding with the concept or sketch plat for the entire 152 acres. We will strive to have the concept plat prepared within the next two weeks, and would like to meet with Meridian staff to all for review of the concept plat prior to the next Meridian City Council meeting on the project (March 11,2003). I would like your input as to whether or not we should design the concept plat in accordance with Meridian zoning standards, including the R-4 dimensional standards. As we discussed the developer is willing to limit the number of lots that can be developed each year to around 40 lots, until such time as City of Meridian services are available. With the approval of the concept plait, the developer could construct a city sized well and dedicate the same to the city at a negotiated time. Further, the developer would consider other dedications, such as park areas, to the City of Meridian. Finally, the devel,oper would enter into the appropriate agreements and enter any appropriate plat noteS to ensure the annexation of the property when contiguous to city limits. 12552 W. EXECUTIVE DRIVE, SUITE B . BOISE, IDAHO 83713 . (208) 887.7760 . FAX (208) 887-7781 CO26282 Meridian planningltr 02070J.doe If you have any questions or comments regarding this matter, please call me at (208) 887-7760 or via email at clintb@pinnacle-engineers.com. Sincerely, c~ Land Use Planner cc: Lee Centers - Centers Construction, Inc. Mayor Robert Corrie - City of Meridian Gary Smith - Meridian Public Works File #C026282 , i '-". C026282 Meridian planni~g II< 020703.doc ( I I f ~..~_..'....- '. .