Loading...
HomeMy WebLinkAbout2026-04-16 Meridian Pathways COWEND Parks and Recreation Reviewer: Kim Warren/ Pathways Project Manager Planner Assigned: Linda Ritter Project Name: Rackham Microhospital File No: H-2026-0011—ACUP, MDA, PP Date: 4.13.2026 The following will be required for development of the proposed project: CONDITIONS OF APPROVAL- PATHWAYS 1. The project developer shall design and construct multi-use pathways consistent with the location and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways Project Manager. See Interactive Pathways Map on City Website. 2. Prior to final project approval the applicant shall dedicate a public access easement for a detached multi- use pathway(10'concrete sidewalk)along W Overland Rd. 10'detached sidewalk shall also be constructed along N Eagle Rd from the intersection at Overland Rd north as far as the extent of the existing [attached] sidewalk to be removed,where it shall then curve to the northeast to connect with future 10'sidewalk along S Rackham Way. Easements shall be a minimum of 14' wide (10' pathway + 2' shoulder each side). All pathways shall be located outside of irrigation district easements unless permission is specifically obtained from the governing irrigation district. Easement need only be dedicated for multi-use pathways that lie outside the public ROW. Follow ACHD easement requirements for detached sidewalks along public roadways. Use standard City template for public access easement. Submit all easements online through Citizen's Access Portal. 3. Construct multi-use pathways per paving section based on existing site conditions as recommended by project civil engineer in accord with UDC 11-3A-8 and 11-313-12. Prior to final approval the applicant's engineer shall provide written documentation (stamped plans depicting recommended paving section)that the pathway segment was constructed per the recommended specifications. 4. The owner (or representative association) of the property affected by each public access easement shall have an ongoing obligation to maintain the multi-use pathway. S. 6'high open vision fencing shall be installed between pathways and(live)water irrigation canals and laterals as detailed in the Meridian Pathways Master Plan,Chapter 3, page 3-5. All other fence details per UDC 11- 3A-7. 6. Project developer shall be responsible for obtaining license agreement and other permission(s)as required for constructing within irrigation district easements. 7. Should any discrepancy exist between these conditions of approval and the requirements of the irrigation district, the developer shall work with Pathways Project Manager to achieve a pathway design that meets both City and irrigation district objectives. City requirements as stated shall not(nor are they intended to) override those of the irrigation district having jurisdiction over the project area. Rev.02.26.26