Loading...
HomeMy WebLinkAboutACHD Comments (2)~ _ ~ ~ ~~ ~~ AHD ~ion+~w.v'~ca~~o ~ritMe:cri March 28, 2007 To: Moose Creek Construction 1220 North Meridian Road, Suite 13 Meridian, ID 83642 Subject: Moose Creek Subdivision PP ~~-np~ 4275 N. Jones Creek John S. Franden, President Rebecca W. Arnold, Vice President Sherry R. Huber, Commissioner Dave Blvens, Commissioner Carol A. McKee, Commissioner ~uN o r Zoor City OFMeridiara. City Clerk pf~ice On March 21, 2007, the Ada County Highway District Commission acted on your application for the above referenced project. The attached report lists site-specific requirements, conditions of approval and street improvements, which are required. The identified conditions will require a re- design of the current site plan. If you have any questions, please feel free to contact meat (208) 387-6171. Sincerely, ~` on Den Hartog Planning Review Supervisor Right-of-Way & Development Services Ada County Highway District CC: Project file, Utilities City of Meridian Ada County Highway DisMct • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us ~~~ ~ }Right-of--Way & Development Services Department CHD ~ ~~~~ ~~ Project/File: Moose Creek Subdivision / / MPP07-Oa~C This is a Preliminary Plat Subdivision /Annexation and Zoning application for 7- residentiallots and 2 common lots on 8.03 acres Lead Agency: Site address Commission Approval: City of Meridian 4275 North Jones Creek March 21, 2007 Applicant: Moose Creek Construction 1220 North Meridian Road Suite 13 Meridian, ID 83642 Representative: Staff Contact: Tech Review: Briggs Engineering 1$00 West Overland Road Boise, ID $3705 Lori Den Hartog Phone: 387-6171 Email:ldenharto achd.ada.id.us March 15, 2007 Application information: Acreage: 1.96 Current Zoning: R-4 Residential Lots: 7 Common Lots: 1 A. Findings of Fact Existing Conditions ' 1. Site Information: The site is currently used for agricultural purposes. Descri tion of Ad'acent Surroundin Area: Direction Land Use Zonin North Sin le famil dwellin R-4 South Sin le famil dwellin R-1 East Sin le Tamil dwellin R-8 West Single Tamil dwellin R-2 Moose Creek Subdivision 2. Existing Roadway improvements and Right-of-Way Abutting or Near the Site: Cherry Lane is currently improved with 5-traffic lanes, 68-feet of pavement with vertical curb, gutter and sidewalk abutting the site. There is 92-feet of right-of-way existing for Cherry Lane (46-feet from centerline). North Summertree Way was constructed as a half street section and is currently improved with 2-traffic lanes, 28-feet of pavement with curb and gutter abutting the site. There is 40-feet of right-of-way existing for North Summertree Way (15-feet from centerline). 3. Existing Access: There are no access points to North Summertree Way from this property. 4. Site History: ACRD has previously reviewed this site for a preliminary plat subdivision application. The applicant has submitted two previous site plans that have attempted to incorporate an existing access easement for the property to the south of this site. Previous staff level reports have restricted access to Cherry due to the fact that the location does not meet District offset or access management policies. The previous staff reports were written and issued in August 2006. The City of Meridian has not taken a formal action on either of the two previous site design proposals. Development Impacts 5. Trip Generation: 6. Impact Fees: 7 This development is estimated to generate 70 additional vehicle trips per day (0 existing) based on the Institute of Transportation Engineers Trip Generation Single Family Detached Dwelling land use designation. There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. Traffic Study: A traffic impact study was not required with this application. Impacted Roadways: 8 Roadway Frontage Functional Classification Traffic Count Level of Service* Speed Limit Cherry Lane 230-Feet Principal Arterial 7,653 east of Better than 35 MPH McDermott Road on "C" 8/24/05 19,162 west of Linder Road on 5/5/04 North 165-Feet Local Residential N / A Acceptable 20 MPH Summertree planning Way threshold for this Road is 2000 ADT '"Acceptable level of service for afive-lane principal arterial roadway is "E" (37,000 ADT). 9. Capital Improvements Plan/Five Year Work Program There are currently no roadways, bridges or intersections in the general vicinity of the project that are currently in the Five Year Work Program. Cherry Lane is currently listed in the Capital ~ Moose Creek Subdivision Improvements Plan for future expansion to a 5-lane roadway from McDermott Road to Black Cat, to the west of this site. B. Findin s for Consideration Cherry Lane District Right-of-Way Policy: District policy requires 96-feet of right-of-way on arterial roadways (Figure 72-F1 B). This right-of- way allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks and bike lanes. District Sidewalk Policy: District policy requires 7-foot wide attached (or 5-foot detached) concrete sidewalk on all collector roadways and arterial roadways (7204.7.2). Applicant Proposal: The applicant does not propose to dedicate additional right-of-way or improvement construction on Cherry Lane. The applicant proposes to utilize the existing sidewalk on Cherry Lane. Staff CommentlRecommendation: The applicant's proposal for Cherry Lane is approved with this application as proposed. Cherry Lane is fully improved at this time. 2. North Summertree Way District Street Section and Right-of-Way Policy: District policy 7204.4.2 states, "developments with any buildable lot that is less that 1-acre in size will typically provide streets having a minimum pavement width of 32-feet with curb, gutter and sidewalks. The total street width shall be 36-feet from back-of-curb to back-of-curb. Variations of this width may be allowed, depending on traffic volumes forecast to be generated by the development. Concrete sidewalks shall be a minimum of 5-feet in width unless they are separated from the curb 5-feet or more in which case the sidewalk shall be a minimum of 4-feet in width. Applicant Proposal: The applicant proposes to dedicate 10-feet of right-of-way to total 25-feet from center or 50-feet far the entire local roadway. The applicant proposes to construct the other half of the half street improvements existing along the entire sites frontage on North Summertree Way: thereby completing this portion of North Summertree Way as a 36-foot street section within 50-feet of right- af-way with vertical curb, gutter and 5-fast attached concrete sidewalk. Staff Comment/Recommendation: The applicant is required to dedicate right-of-way to total 50-feet from centerline (an additional 10- feet) and complete North Summertree Way as a 36-foot street section (measured back of existing curb to back of new curb) and construct curb, gutter and 5-foot attached concrete sidewalk within 50-feet of right-of-way. 3. District Tree Planters District's Tree Planter Width Policy prohibits all trees in planters less than 6-feet in width. In addition to prohibiting trees in planters less than 6-feet in width, the policy requires a minimum planter width of 6-feet for class II tress with the installation of root barriers on both sides of the 3 Moose Creek Subdivision planter strip or a minimum planter width of 8-feet without the installation of a root barrier. The policy also requires Class I and Class III trees to provide a minimum planter width of 10-feet. Applicant Proposal: The applicant has not specifically identified trees on the Preliminary Plat application or site plan. Staff Comment/Recommendation: Staff understands that the use of trees may be determined at a later time. The applicant is being provided the current policy in effect at this time and is directed to work with Development Review Staff in regard to the planning of trees in the right-of-way. 4. Internal Private Roadways District Private Street Policy: District policy 7205.6, other jurisdictions in Ada County establish the requirements for private streets. The District retains authority and will review the proposed intersection of a private and public street for compliance with District intersection policies and standards. District Access Management Policy: Access Policy: District policy 7207.8 states that direct access to arterials and collectors is normally restricted. The developer shall try to use combined access points. If the developer can show that the use of a combined access point to a collector or arterial street is impractical, the District may consider direct access points. Access points for proposed developments at intersections should be located as far from the intersection as practical, and in no case closer than as illustrated on Figure 72-F4, unless a waiver for the access point has been approved by the District Commission. District Offset Policy: • Local Street: District policy 7204.11.6, requires local roadways to align or offset a minimum of 125-feet from another local roadway (measured centerline to centerline). Principal Arterial: District policy 7204.11.6, requires local roadways to align or offset a minimum of 300-feet from an arterial roadway (measured centerline to centerline). Applicant Proposal: The applicant has proposed to construct a 24-foot wide private road intersecting Summertree Way approximately 215-feet south of Cherry lane (measured centerline to centerline). The proposed roadway offsets another local street by approximately 40-feet. The applicant is requesting a modification of District policy to allow the existing access to Cherry Lane to remain and to add additional vehicle trips to that access. The proposal is to construct a 24- foot wide private road intersecting Cherry Lane at the northwest property line over an existing access easement. The proposed roadway offsets another local street by approximately 210-feet. 4 Moose Creek Subdivision Staff CommentlRecommendation: The proposed private street at the northwest property line offsets another local street by approximately 210-feet. The proposed location does not meet the Districts Offset policy for Principal Arterial roadways and does not meet the Districts Access Management policy because the site has frontage on a local residential roadway. Staff can not approve the private street accessing Cherry Lane and directs the applicant to take primary access from Summertree Way. The proposed private street is located over an existing access easement that serves one single-family residence to the south of the site. District staff would consider allowing the access to Cherry Lane to remain if it were to provide access only to the existing residence to the south. However, the proposal adds approximately 30 additional vehicle trips per day to an existing access that does not meet District policy. Relocate the proposed private street accessing Summertree Way to align with the local roadway on the east side of Summertree Way. If the City of Meridian approves the private road, the applicant shall be required to pave the private roadway a minimum of 20 to 24-feet wide and at least 30-feet into the site beyond the edge of pavement of Summertree Way and install pavement tapers with 15- faot curb radii abutting the existing roadway edge. The applicant should provide a plan showing how the private road grade meets the public road. District Policy requires a design approach speed of 20 MPH. Street name and stop signs are required for the private road. The signs may be ordered through the District. Verification of the correct, approved name of the road is required. ACRD does not make any assurances that the private road, which is a part of this application, will be accepted as a public road if such a request is made in the future. Substantial redesign and reconstruction costs may be necessary in order to qualify this road for public ownership and maintenance. The following requirements must be met if the applicant wishes to dedicate the roadway to ACHD: • Dedicate a minimum of 50-feet of right-of-way for the road. • Construct the roadway to the minimum ACHD requirements. . Construct a stub street to the surrounding parcels. 5. Stub Streets District Stub Street Policy: District policy 7203.5.1 states that the street design in a proposed development shall cause no undue hardship to adjoining property. An adequate and convenient access to adjoining property for use in future development may be required. If a street ends at the development boundary, it shall meet the requirements of sub section 7205, "non-continuous streets." District policy 7205.5 states that stub streets will be required to provide intro-neighborhood circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7204.5, 7204.6 and 7204.7, except a temporary cul-de-sac will not be required if the stub street has a length no greater than 150-feet. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". Applicant Proposal: The applicant has not proposed any stub streets but has proposed a private road on the west property line. Staff Comment/Recommendation: The District does not have jurisdiction over private road interconnectivity. 5 Moose Creek Subdivision 6. Special Note to the City of Meridian District staff recognizes that the last two proposals for Moose Creek Subdivision included stub street access to the parcel to the west, which only has frontage on Cherry Lane. The previous proposals were desirable to the District because the internal roadways would effectively provide access to Cherry Lane through Summertree Way. The current proposal would nvt satisfy that intent because the proposed private roadways show bollards restricting access to Summertree Way. District staff does not support direct lot access to Cherry Lane and does not support the bollard restriction to Summertree Way. Staff would support across-access agreement among these parcels that would restrict the number of access points to Cherry Lane. 7. Other Access Cherry Lane is classified as an arterial roadway: all access points to Cherry Lane will be closed except the access specifically approved with this applicatian: direct lot access to Cherry Lane is prohibited and should be noted on the final plat. C. Site .Specific Conditions of Approval 1. Dedicate 10-feet of additional right-of-way on North Summertree Way to total 25-feet from center or 50-feet for the entire local roadway. 2. Construct North Summertree Way as a complete 36-foot street section (measured back of existing curb to back of new curb) and construct curb, gutter and 5-foot attached concrete sidewalk within 5D-feet of right-of-way. 3. Construct a 24-foot wide private road intersecting Summertree Way in alignment with the local street on the east side of Summertree Way. Pave the private street the minimum 30-feet into the site and construct the private roadway not wider than 24feet. 4. Cherry Lane is classified as an arterial roadway: all access points to Cherry Lane will be closed except the access specifically approved with this application: direct lot access to Cherry Lane is prohibited and shall be noted on the final plat. 5. Comply with all Standard Conditions of Approval. D. Standard Conditions of Approval Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. Private sewer or water systems are prohibited from being located within any ACHD roadway or right-of-way. 3. All utility relocation casts associated with improving street frontages abutting the site shall be borne by the developer. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. Comply with the District's Tree Planter Width Interim Policy. 6 Moose Creek Subdivision 6. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 7. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACRD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. $. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 9. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 10. Payment of applicable road impact fees is required prior to building construction in accordance with Ordinance #200, also known as Ada County Highway District Road Impact Fee Ordinance. 11. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACRD conduits (spare or filled) are compromised during any phase of construction. 12. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 13. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. E. Conclusions of Law The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACRD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. 7 Moose Creek Subdivision Attachments 1. Vicinity Map 2. Site Plan Moose Creek Subdivision 3. Request for Reconsideration Guidelines U `L''` , , ~. ~ ~~ ~ ""y ~ ~ Y~ , i ~ ~f99 !~ ~ : eE g~ d~ s 0 p 1r 1: ~~ ~ ^ y M !I p _ s '~~ ~~ ! ® r ~ i ~ ~1 ~JM aE~l~~ii~iiial~li~l~!!Illlilllllsllllllili1ii1111 1 I I I I I ~ I V I I I II I II I II I ~~I II I I rop.e..akl II iK ' 6I I:II I ~Il..iew..eP~~ II I II I Illllil i IiI ~~// __. ~_, , 1 Rai ~ !i I I I I 1 g~ ~ I ; I I ~i I / ~---r~l I ~~-~----1, ~ t e I ~ I I ~~~ I I ~, I 1 1 _- . I i I la I I I ggi '~ I Ig I ~9~ I ~y I ~ , ~~i I & r-------____+_ ._______i I , I ~ I ~i I I~ I ~~~ I 9~ I Iii ___. 017%Q3CJ N ~~-~1 I ~` I 4~ I lip I I I 9 I 9 I ~!; ~ Ai ,__._ ~; .I I .--7~ ~ • I ,' ;'I I / - >w -,~I f~l i L-----I~ M~ ~ i l~ i l I ~ ~~ I I ~ r ~}"'..... ~i~ I ~}~, I ~~ I I I ~I - I - ~ ~ I~ I I I~~~ 1 1 ~ I 1 1 ~ I ~!E I 1 ---I (eL 1 ~2i j ii tt ~ I I, _~_~ ~~; ~ __ _-- -- ,, r~____ i _____; ---; I G) I I ~i ~ ~~~ ~ , I 1 1. ~~~ I ~11 i + I I L 1 1 1 1 . - "-~ I 3 1 3, i I 3 I 1 ~~~ I i t ~ 1 iii ~ ~~ ~~ 4 ~~l r ~gg e ~~ ~~ ~$ ~~~~ ~ ~~ ~~~~~~ ~~~ .~ i ~~~ ~~ ~~ Y ~ 3 B ~~ R 9 Moose Creek Subdivision Request for Reconsideration of Commission Action Request for Reconsideration of Commission Action: A Commissioner, a member of ACRD staff or any other person objecting to any final action taken by the Commission may request reconsideration of that action, provided the request is not for a reconsideration of an action previously requested to be reconsidered, an action whose provisions have been partly and materially carried out, or an action that has created a contractual relationship with third parties. a. Only a Commission member who voted with the prevailing side can move for reconsideration, but the motion may be seconded by any Commissioner and is voted on by all Commissioners present. If a motion to reconsider is made and seconded it is subject to a motion to postpone to a certain time. b. The request must be in writing and delivered to the Secretary of the Highway District no later than 3:00 p.m. on the day prior to the Commission's next scheduled regular meeting following the meeting at which the action to be reconsidered was taken. Upon receipt of the request, the Secretary shall cause the same to be placed on the agenda for that next scheduled regular Commission meeting. c. The request for reconsideration must be supported by written documentation setting forth new facts and information not presented at the earlier meeting, or a changed situation that has developed since the taking of the earlier vote, or information establishing an error of fact or law in the earlier action. The request may also be supported by oral testimony at the meeting. d. If a motion to reconsider passes, the effect is the original matter is in the exact position it occupied the moment before it was voted on originally. It will normally be returned to ACRD staff far further review. The Commission may set the date of the meeting at which the matter is to be returned. The Commission shall only take action on the original matter at a meeting where the agenda notice so provides. e. At the meeting where the original matter is again on the agenda for Commission action, interested persons and ACRD staff may present such written and oral testimony as the President of the Commission determines to be appropriate, and the Commission may take any action the majority of the Commission deems advisable. f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover administrative costs, as established by the Commission. 10 Moose Creek Subdivision Development Process Checklist ®Submit a development application to a City or to the County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Division will receive the development application to review ®The Planning Review Division will do one of the fallowing: ^Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time ^Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ^Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®The Planning Review Division will hold a Technical Review meeting far all Staff and Commission Level reports. ^For ALL development applications, including those receiving a "No Review" or "Comply With" letter: • The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. ^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. D/D YOU REMEMBER? Construction Zone ^ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ^ Working in the ACHD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction -Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is X50' or you are placing X600 s.f. of concrete or asphalt. Construction (subdivisions) ^ Sediment & Erosion Submittal • At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction -Subdivision to be reviewed and approved by the ACHD Stormwater Division. ^ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ^ Final Approval from Development Services ACHD Construction -Subdivision must have received approval from Development Services prior to scheduling aPre-Con. 11 MOOSe Creek Subdivision