Loading...
HomeMy WebLinkAboutACHD Comments~~~~ "'~ ~ D ~,. IPoawsvva~e~~o cvi July 12, 2007 To: James Prather 707 E. United Heritage Parkway, #150 Meridian, ID 83642 Subject: MAZ-07-009 Queenland Acres s/e/c Overland Rd. & Stoddard Rd. john S. Franden, President Rebecca W. Arnpld, Vice President Sherry R. Huber, Commissioner Dave 8ivens, Commissioner Carol A. McKee, Commissioner ~~~~~.J JUL 13 20G7 City Qf Meridian City Clerk Office On 7-11-2007, the Ada County Highway District acted on your application for the above referenced project. The attached report lists site-specific requirements, conditions of approval and street improvements, which are required. If you have any questions, please feel free to contact. me at (208) 387-6171. Sincerely, c- Chelsee Kucera Right-of-Way & Development Services Ada County Highway District CC: Project file, Utilities City of Meridian Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.ld.us ~~~~ "'~ C D ~ ~~~~~ ~ Right-of--Way & Development Department Planning Review Division Project/File: Lead Agency: Site address: Commission Approval: Regular Agenda Applicant: MAZ-07-009-Queenland Acres This is an annexation and zoning application for a future commercial development project. City of Meridian s/e/c Overland Road and Stoddard Road July 11, 2007 James Prather 707 E. United Heritage Parkway, #150 Meridian, ID 83642 Staff Contact: Lori Den Hartog Phone: 387-6171 E-mail: Idenhartog[c~achd. ada. id. us Tech Review: June 15, 2007 Application Information: Acreage: 22.67 Existing Zoning: RUT Proposed Zoning: C-G A. Findings of Fact Existing Conditions 1. Site Information: The site is currently vacant. 2. Description of Adjacent Surroundincl Area: Direction Land Use Zonin North Roarin S rin s Water Park/Commercial C-G South Sin le-famil residential R-4 East Future commercial-Lowe's Home Im rovement C-G West Future commercial C-G 1 MAZ-07-009 3. Existing Roadway Improvements and Right-of-Way Adjacent To and Near the Site • Overland Road is currently under construction abutting the site. Prior to construction Overland Road was a 2-lane roadway with no curb, gutter, ar sidewalk abutting the site. The current project is widening the road to a 5-lane facility with bike lanes and curb, gutter, and sidewalk from Meridian Road to Linder Road. • Stoddard Road is currently a 2 to 3 lane roadway near the site. There is sidewalk abutting the developed portions of Stoddard Raad and curb and gutter. Directly abutting the site, there is no curb, gutter, or sidewalk. The Overland Road project that is currently under construction includes the widening and signalization of the Stoddard/Overland Road intersection. • Meridian Road (SH 69) is a 5-lane roadway with no curb and gutter. There is sidewalk abutting some of the developed portions of Meridian Road. Meridian Road is a state highway under the jurisdiction of the Idaho Transportation Department. 4. Existing Access: Prior to the reconstruction of Overland Road, there were several existing access points on Overland Road to serve the previous uses. 5. Site History: ACHD has not previously reviewed this site for a development application. Development Impacts 6. Trip Generation: This development is estimated to generate 8,600 additional vehicle trips per day based on the Institute of Transportation Engineers Trip Generation Manual, specialty retail land use designation. 7. Impact Fees: There will be an impact fee that is assessed and. due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 8. Impacted Roadways: Roadway Frontage Functional Traffic Count Level of Speed Classification Service* Limit Overland 1,263' Principal 21,591 west of Exceeded 40 MPH Road Arterial Meridian Road on "E" as a 2- 6/18/06 lane road With construction Improvement Better than ~~C» Stoddard 710' Collector 2,670 south of Better than 40 MPH Overland on "C" 8/22/06 Meridian None Principal 62,504 north of Exceeds "E" 35-55 MPH Road Arterial Overland Road on 6/18/06 "Acceptable level of service for afive-lane principal arterial roadway is "E" (37,000 VTD). 9. Capital Improvements Plan/Five Year Work Program Overland Road is currently under construction abutting the site. The project includes the widening of the roadway to a 5-lane facility with bike lanes, and it also includes the Overland Road/Meridian Road intersection to seven lanes on all legs. The Overland Road project also includes the 2 MAZ-07-009 signalization of the Stoddard Road/Overland Road intersection and the widening of the Linder Road/Overland Road intersection. B. Findin s for Consideration THIS APPLICATION IS FOR A REZONE AND ANNEXATION ONLY. UPON SUBMITTAL OF A DEVELOPMENT APPLICATION ACHD WILL REVIEW THE TRANSMITTED 51TE PLAN AND APPLICATION, AND LEVY FORMAL REQUIREMENTS AT THAT TIME. Overland Road Right-of-Way Policy: District policy requires 96-feet of right-of-way on arterial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks and bike lanes. Sidewalk Policy: District policy requires 7-foot wide attached (or 5-foot detached) concrete sidewalk on all collector roadways and arterial roadways (7204.7.2). Staff Comment/Recommendation: Due to the fact that Overland Road is currently under construction, the District has no street improvement requirements for this site's frontage. 2. Stoddard Road Right-of-Way and Street Section Policy: District policy 72-F1 B requires collector roadways to be constructed as 46-fioot street sections with vertical curb, gutter, and 5-foot detached (or 7-foot attached) concrete sidewalks within 70-feet of right-of-way. This street section allows for the construction of a 3-lane roadway with bike lanes. Applicant Proposal: The submitted conceptual plan does not identify street improvements to Stoddard.Road. Staff Comment/Recommendation: The applicant will be required to widen the pavement on Stoddard Road abutting the site to one-half of a 46-foot street section and construct vertical curb, gutter, and 7-foot attached (or 5-foot detached) concrete sidewalk. 3. Driveways Access Policy: District policy 7207.8 states that direct access to arterials and collectors is normally restricted. The developer shall try to use combined access points. If the developer can show that the use of a combined access paint to a collector or arterial street is impractical, the District may consider direct access points. Access points for proposed developments at intersections should be located as far from the intersection as practical, and in no case closer than as illustrated on Figure 72-F4, unless a waiver for the access point has been approved by the District Commission. Driveway Offset Policy: District policy 72-F5, requires driveways located on collector or arterial roadways with a speed limit of 40 to align or offset a minimum of 185-feet from any existing or proposed driveway. District policy 72-F4 (1) requires driveways located on collector roadways near a signalized intersection to be located a minimum of 175-feet firom the signalized intersection for afull-access driveway and a minimum of 85-feet from the signalized intersection for aright-in/right-out only driveway. 3 MAZ-07-009 Applicant Proposal: The applicant has proposed two full access driveways on Stoddard Road. The first driveway is located approximately 350-feet south of the signalized intersection with Overland Road, and the second driveway is located at the south property line. The applicant has proposed two full-access driveway locations on Overland Road (in addition the shared access to the signalized intersection with Lowe's). The first driveway is proposed approximately 435-feet east of the Stoddard/Overland intersection and is in alignment with the easternmost driveway for the Mountain View Equipment site on the north side of Overland Road. The second driveway is proposed in alignment with the private road, Blue Marlin Drive. Staff Comment/Recommendatian: District staff is supportive of the proposed Stoddard Road driveway locations which should be approved with this application. There is an existing driveway on the west of Stoddard Road located approximately 445-feet south of the intersection; however, this driveway serves as a secondary driveway for the storage facility on the west side of the roadway. Staff is also supportive of the driveway locations on Overland Road which are consistent with the driveway locations negotiated as part of the right-of-way purchase for the Overland Road project. 4. Drive Aisle/Stub Street Stub Street Policy: District policy 7203,5.1 states that the street design in a proposed development shall cause no undue hardship to adjoining property. An adequate and convenient access to adjoining property for use in future development may be required. If a street ends at the development boundary, it shall meet the requirements of sub section 7205, "non-continuous streets." District policy 7205.5 states that stub streets will be required to provide intro-neighborhood circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7204.5, 7204.6 and 7204.7, except a temporary cul-de-sac will not be required if the stub street has a length no greater than 150-feet. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." Applicant Proposal: The applicant is not proposing to construct a public stub street through the site. Staff Comment/Recommendation: The public stub street, Alaska Street, was required with the development of the Bear Creek Subdivision to the south of this site. The stub street was required at a time when the City of Meridian's Comprehensive Plan identified this property and the adjacent properties for commercial uses. It has been the long-term intent of bath the City and the Highway District to provide same form of connectivity between the commercial and residential uses. In reviewing the site plans for the two applications (adjacent development is Brighton, Lowe's MCZC-07-054), District staff and the City of Meridian determined that having a connection to the existing public stub street to the south would be beneficial to the residents of the development to the south by allowing them access to the commercial developments without having to travel on the collector or arterial street system. However, staff from both agencies and the applicants agreed that the desire was not to have the commercial traffic be directed to travel through the residential neighborhood to the south. Therefore, a circuitous and non-public street connection appeared to be the most viable alternative. In lieu of constructing, dedicating, and extending a public street through the site, staff recommends the applicant grant a cross access easement for drive aisles within the development to the property owner to the east (Brighton, MCZC-07-054), and that the property owner to the east (Lowe's/Brighton) grant a cross access easement to Prather's property to connect the drive aisle at the signalized intersection on Overland Road. The applicant should grant a cross access easement 4 MAZ-07-009 for drive aisles to the public stub street (Alaska Street) located at the south property line of the adjacent parcels. The easement may be for drive aisles within the parking lots of both developments. The intent of the easement is to provide assurance that the traveling public from the subdivisions to the south will have the right to drive through these developments to access the commercial uses and the signalized intersection on Overland Road. The easement ensures that the drive aisles cannot be closed to the public in the future. Commission Hearing: At the ACRD Commission Hearing on July 11, 2007, the Commission heard testimony from staff, the applicant, and a representative of the Bear Creek Home Owner's Association regarding the proposed connection between Alaska Avenue and the new signalized intersection on Overland Road at the main entrance for Lowe's. The Commission determined that the interconnectivity between the residential and commercial uses was appropriate and approved the staff report as submitted. 5. Tree Planters Tree Planter Policy: The District's Tree Planter Width Interim Policy prohibits all trees in planters less than 6-feet in width. In addition to prohibiting trees in planters less than 6-feet in width, the policy requires a minimum planter width of 6-feet for class II tress with the installation of root barriers on both sides of the planter strip or a minimum planter width of 8-feet without the installation of a root barrier. The policy also requires Class I and Class III trees to provide a minimum planter width of 10-feet. 6. Other Access Overland Road is classified as a principal arterial roadway, and Stoddard Road is classified as a collector roadway. Other than the access specifically approved with this application, direct lot access is prohibited to these roadways. C. -Site Specific Conditions of Approval THIS APPLICATION IS FOR A REZONE AND ANNEXATION ONLY. UPON SUBMITTAL OF A DEVELOPMENT APPLICATION ACHD WILL REVIEW THE TRANSMITTED SITE PLAN AND APPLICATION, AND LEVY FORMAL REQUIREMENTS AT THAT TIME. Widen the pavement on Stoddard Road and construct vertical curb, gutter, 7-foot attached (or 5- faot detached) concrete sidewalk to one-half of a 46-foot collector street section abutting the site. 2. Construct two full-access curb return driveways on Stoddard Road to a maximum width of 36-feet. The first driveway shall be located approximately 350-feet south of the signalized intersection with Overland Road, and the second driveway shall be located at the south property line. 3. Construct two full-access curb return driveways on Overland Road to a maximum width of 36-feet. The first driveway shall be located approximately 435-feet east of the Stoddard/Overland intersection and in alignment with the easternmost driveway for the Mountain View Equipment site on the north side of Overland Road. The second driveway shall be in alignment with the private road, Blue Marlin Drive. 4. Grant a cross access easement to the adjacent development (Brighton, MCZC-07-054) to connect the drive aisle at the signalized intersection on Overland Road to the public stub street (Alaska Street) located at the south property line of the adjacent parcels. The easement may be circuitous and may be for drive aisles within the parking lots of bath developments. The District shall review and approve the language of the easement prior to recording to ensure it is meeting the intent of the Findings of this report. 5 MAZ-07-009 5. Other than the access specifically approved with this application, direct lot access is prohibited to Overland Road and Stoddard Road. 6. Comply with all Standard Conditions of Approval. D. Standard Conditions of A royal Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. Private sewer or water systems are prohibited from being located within any ACRD roadway or right-ofi-way. 3. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. Comply with the District's Tree Planter Width Interim Policy. 6. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 7. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 8. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 9. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 10. Payment of applicable road impact fees are required prior to building construction. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 11. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACRD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACRD conduits (spare or filled) are compromised during any phase of construction. 12. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 13. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest 6 MAZ-07-009 advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. E. Conclusions of Law The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Site Plan 3. Reconsideration Guidelines 4. Development Process Checklist 7 MAZ-07-009 MAZ-07-009 3 I I - _~- ,_._. .. - ..~, .-......-.. .--. .-. ..,.~ .. -.,~..~~-.z-.T..-_...~.~....~.aj~an - - - - - ___ _ - - _ _ _ ~ _ ~4L-._---._~f-r --.w,. ~ _ _ _ _ ! flNflilrllmitfittli(flttNlmt mlTrl ~nnrumrrrrrrmrmimlrrrfiiirnmmrrnnrmmrrrrrrnnirt,l ~ .. _ r~_ J~111rTf:ir~ .?_0~.-~~_- _ _-.._ __~- _ .. _ _ _.~ ~ tiYl llllllll .. _ _ _ _ __ - - ~ _ ----- - ~oMx - ~ G~i?27 r"j C- ~I - = .._._...._.. ____-__.~..._.~.__._--- --- _:__..--- - - ~ iuuui - i , ---z- ~~--1--•~- ` ~~{ia+t f ueMx~ai y[ic.~oonwoo ~~~ l~~-. Ll~ y•~"^ I 9 MAZ-07-009 Development Process Checklist ®Submit a development application to a City or to the County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Division will receive the development application to review ®The Planning Review Division will do o~ie of the following: ^Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time ^Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ^Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®Write a Commission L®vel report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ^For ALL development applications, including those receiving a "No Review" or "Comply With" letter: • The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation,) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. ^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DlD YOU REMEMBER: Construction (Zone) ^ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ^ Working in the ACHD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway tJse Permit Application" to ACHD Construction -Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative ~ Plat, done by a Certified Plan Designer, if trench is X50' or you are placing ~t300 sf of concrete or asphalt. Construction (Subdivisions) ^ Sediment ~ Erosion Submittal • At least one week prior to setting up a Pre-Con an Erasion & Sediment Gontrol Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction -Subdivision to be reviewed and approved by the AGHD Drainage Division. ^ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ^ Final Approval from Development Services ACHD Construction --Subdivision must have received approval from Development Services prior to scheduling aPre-Con. 10 MAZ-07-009