Loading...
HomeMy WebLinkAboutOption4ExplanationThe Pathway Network is entirely removed from the Future Land Use Map and a new note is added directing people to the Pathways Master Plan. Current Wording in Draft Plan: “From Ten Mile to Cherry there are two pathway options. A long-term vision and an on-street route. Long-Term Pathway route: The long-term…” Proposed Re-Wording in Draft Plan: “From Ten Mile to Cherry there are two pathway options; a long-term vision and an on-street route. The on-street route is identified in acknowledgment of the impacts a creekside pathway will have on adjacent land owners and current land uses. The long-term pathway is intended for construction upon redevelopment of adjacent properties. Long-Term Pathway route: The long-term…” Option 4