HomeMy WebLinkAbout2026-06-16 Pathway Conditions Revised COWEND
Parks and Recreation
Reviewer: Kim Warren/ Pathways Project Manager
Planner Assigned: Sonya Allen
Project Name: Syring Crossing Mixed Use Dev File No: H-2025-0007—AZ, CUP, PP
Date: revised 6.16.26/orig.3.20.2025
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL- PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location and
specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document
Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways
Project Manager. Interactive Pathways Map
2. Prior to final approval the applicant shall dedicate a public access easement for a detached, 10'wide multi-
use pathway (concrete sidewalk) within the landscape buffer along S. Meridian Rd. for the length of the
project. 10'wide detached multi-use pathway will also be required along both sides of W Amity Rd.
For the project phase north of Amity Rd,10'wide multi-use pathway will also be required along the Williams
Pipeline easement between S Meridian Rd and the far northwest corner of the project, to eventually
connect beyond the site.
All pathways shall be located outside of irrigation district easements unless permission is specifically
obtained from the governing irrigation district.
For pathway segments and other improvements within the Pipeline easement,work with Williams Pipeline
company to secure necessary permissions and approvals.
Easements shall be a minimum of 14'wide (10' pathway+2' shoulder each side). Easement need only be
dedicated for multi-use pathways that lie outside the public ROW. Use standard City template for public
access easement. Submit all easements online through Citizen's Access Portal.
3. Construct multi-use pathways per paving section based on existing site conditions as recommended by
project civil engineer in accord with UDC 11-3A-8 and 11-36-12. Prior to final approval the applicant's
engineer shall provide written documentation that the pathway segment was constructed per the
recommended specifications.
4. The owner (or representative association) of the property affected by each public access easement shall
have an ongoing obligation to maintain the multi-use pathway.
5. 6'high open vision fencing shall be installed between pathways and(live)water irrigation canals and laterals
as detailed in the Meridian Pathways Master Plan,Chapter 3, page 3-5. All other fence details per UDC 11-
3A-7.
6. Project developer shall be responsible for obtaining license agreement and other permission(s)as required
for constructing within irrigation district easements.
7. Should any discrepancy exist between these conditions of approval and the requirements of the irrigation
district, the developer shall work with Pathways Project Manager to achieve a pathway design that meets
Rev.01.07.25
both City and irrigation district objectives. City requirements as stated shall not (nor are they intended to)
override those of the irrigation district having jurisdiction over the project area.
Rev.01.07.25