HomeMy WebLinkAboutCC - Department Report STAFF REPORT E COMMUNITY
N --
COMMUNITY DEVELOPMENT DEPARTMENT .►A H O
HEARING 6/16/2026
DATE:
TO: Mayor&City Council
FROM: Sonya Allen,Associate Planner
208-884-5533 fi
SUBJECT: Creek No. 2 Tanner r k �o I AN N
FP-2026-0011 0 ®
mg
LOCATION: Generally located on the north side of I-
84, 1/4 mile west of S. Meridian Rd., in SITE
the NE 1/4 of Section 13, T.3N.,R.ON. INTERSTATE 84
D
KLAN ROA OVE
�I� �i,�Tf��
I. PROJECT DESCRIPTION
Final plat consisting of 76 buildable lots and 7 common lots on 10.65 acres in the R-8 and R-15
zoning districts. This is the second phase of Tanner Creek Subdivision.
II. APPLICANT INFORMATION
A. Applicant
Shari Stiles, Engineering Solutions— 1029 N. Rosario Street, Suite 100,Meridian,ID 83642
B. Owner:
Corey Barton— 1977 E. Overland Road,Meridian, ID 83642
C. Representative:
Same as Applicant
III. STAFF ANALYSIS
For the proposed final plat to be deemed in substantial compliance with the approved preliminary plat
as set forth in UDC 11-6B-3C.2,the number of buildable lots cannot increase,and the amount of
common area cannot decrease. Because there is no change to the number of buildable lots and no
decrease in common open space in this phase, Staff deems the proposed final plat to be in substantial
compliance with the approved preliminary plat(H-2022-0048), as required. The proposed plat is also
consistent with the provisions in the development agreement.
This phase of development was depicted as Phase 3 on the phasing plan approved with the
preliminary plat. The development agreement(DA) allows flexibility in the phasing unless otherwise
Page 1
restricted in the Cooperative DA with ACHD—the Applicant stated the proposed change to the
phasing plan is allowed by ACHD. Therefore, Staff is amenable to the change.
IV. DECISION
Staff recommends approval of the proposed final plat with the conditions noted in Section VI of this
report.
V. EXHIBITS
A. Preliminary Plat(dated: 7/5/23)
.�.uL� _ _ rpge[Wd�m•^Y WM'Wig1 g1511R61 A+10
ua-��� YRRI..'W � � Vul 3un6"eFc cwa�ou'w Ro YL W 3 fJ�i/1 b 31LL A�1(�u Ml � � LLf
SN01!l170 lYnd><adwwn3ddR a�^ � � _
�a '"�"' ����� 1�V1N00ltl3NNYld � NOISIA1490S e
aaa33tl 3o stl3NMa tl3dMIA K 9N!lI�dNI.9N�
IR
MLMI
! yK pp
r2�� `s {y���yy�yy�v� �J�p,'� j@{ �+ �'� a�s■� 6®� � � @_" gg �e
3T�3 Oil
ii qq�
I �
R
r
13
� I
✓a ba v 6a e
awi � L' aiw• 6 IY C Q
.msa a.ss,md - •� 1
Sl4`I�1.Up .. i ,iR'CLO iSF OAR R �a as
Page 3
B. Final Plat@(dated: 6/4/26)
$ `J' ` "S n rh e a �' � �3 .WIG e
$ $$ @I�� Oil �s MR ���� 5g � +� ��ga
se x���€�aa�LL�W� � �� g°I!
n s Iz3 ;fie t � t'
d $tl g s.
sn 9t g
a� a ya d
Ruh - � ��u f- a ����sa # ` Ei y
s e 14 I �2. sa :s 3❑ $ g s
I ° w ka€ eg �
g `x =R WR y €i5 u
a3 � VO
0 s � � 04€ g o a
C��4e4 pg6S— €3dgq gg€ " 9€'a
..nS
Q
5 I o
hgay ¢ �Ci
R A k s E '1 ffi 7 a k S B
a i k si � a v p 5 k 4 p ! pi 2 p i
is a 2 gL Y
8 is '.9 �ti is13aa13s. � s. � 13s
p F: F- K C p R F= F: 4
�l C E C p t K S i z k R 3 -t kI z
o� Hass it, sa � a � � � ❑ � hs � s
L
� R�4 wnuxi Z7t5a IA.sZ.ecas ®•+v*� ��1
CC O .r ruv_or� mw, r'0 � 5-91� rp'—ni p4?� �mn, p�"' _ v� f.-.-----n„�-�---F� xv;
l f� .s e� f�oo-e �
r7Q I $ I! II- il� asaa . �e bsg " •..� 9 i
>7$-a�gte�51's_���Sg-aR'sa� �F,' R '!
J L J L J L1 J L J L—J L
$Z ,I 1dU1 7d7R ypgij ASA7 p68F .ppy ]tliN
Nl o O ° �rxr ieanuYSl s �
NJ
oLL,ID
N w
9
Nil �n
b �.._..-•max.-- �
W z - IIIIl
aw ; .u- tl9 bsa - plus I$ .-•man----J I S @°`
ow I av 7[�Rg117 s - iN
L---'m ce,----� � a 9
op � '-w.>arK> Ronx�`
�I I i ��
NJ
w i �I rni a.-4
m is mroa— mx x � RR
L.---mffiI__._.:J I �e
V `� R — ') F. m}a.�3° r otr�¢ gra,xr h > s^.
n � �i `�� ��I _�I . I :�I al ,�I �I �I �I a � �, �. .__apyl---J
xx.-- g`
x aI RlI �: 19ca;-
g1 I I�l I -I �.--tea - M.Hr
s +aXw
& J L j 1 1 Ig
_36�..J L.��..Jm'IN'I � �x
n o•»rvx5 anwi r� 1:G•asn®'a:xan-yll
C. Common Driveway Exhibits
NOTE:IF A 6'SOLID FENCE IS INSTALLED
ADJACENT TO THE COMMON DRNE A 5' �'_�
LANDSCAPE BUFFER SHALL BE REQUIRED
in \
LOT 9 �g�a
10 N CDRIVE o N W.JASCKSNIPE DR. N
= 5
a DRNEWAY
15'{LNING)FROM - _ 15(LNING)FRONT- _
o 20'(GARAGE)FRONT r L 20'(GARAGE) RON FT1pr
15'---FRONT WILL NOT EXTEND PAST " 20'(C^RAGE)PROM
V FRONT PLANE OF DWELLING,
" ACCESS FROM "
JACKSNIPE DR.PER
- - r CITY OF MERIDIAN "
UDC 11-6C-3D.5 io ie
I i
HOME ORIENTATION " HOME ORIENTATION HOME ORIENTATION HOME ORIENTATION
r 10 � i 11 i � 12 i i 13 r 14
" BLOCK 7
i
R
_-E
REAR `---- J --
12' EAR---� L---12'REAR T
12' AR 12'REAR
LOT LINE LOT LINE
X X X X X X X X X
TITIRXINATE LOCATION OF FENCE(SEE LANDSCAPE PLAN) TANNER CREEK
25 SUBDIVISION NO 2
(COMMON DRIVE EXHIBIT B)
- - I-84 - - - - - - - - _ 1„ = 30'
NOTE IF A 6'SOLID FENCE IS INSTALLED
QS�,; ADJACENT TO THE COMMON DRIVE A 5' 28 g
i LANDSCAPE BUFFER SHALL BE REQUIRED m
/ 5'CONIC.PATH
<27
W.JASCKSNIPE DR. a N
�� LOT 26 ii
N s z COMMON 24 `4' -
�� DRIVE
.DDRIVEWAY
IS'(LNING)FRONT 15'jLMI FRONT 15'(UMNG)FRONT 15'(LNING FRONT z
o'
261 FRONT " 20"(GARAGE)FRONT 20'(GPRACE)FRONT 20'(CARACE)FRONT
ACCESS FROM FENCE WILL NOT E)TENO PAST
JACKSNIPE DR. PER FRONT PLANE OF DWELLING,(TYP.) "
r CITY OF MERIDIAN
UDC 11-6C-3D.5 "
HOME ORIENTATION , HOME ORIENTATION �i HOME ORIENTATION , HOME ORIENTATION
21 , 22 23 , 24
" BLOCK7
r i r r
J L_ -J L________ J L-___ ____J
12'REAR 12'REAR 12'REAR IT REAR
LOT LINE LOT LINE
•x x x x x x x x
APPROAIMATE LOCATION OF FENCE(SEE LANDSCAPE PLAN) TANNER CREEK
25 SUBDIVISION NO 2
(COMMON DRIVE EXHIBIT A)
I-84 - -- -- - - -, 1" = 30,
Page 5
D. Landscape Plan(dated: 5/29/2026)
OHVGI 'NVICIIH3N
3dV3S(3NV'l iV
2 3!RVHd
l-
Lbuui
-L-L—I
---------1T7.4.---..
..... ..........................................
.....................................................................................................................
..............................................................
............................
............
.....................
....................
..:..........:........PI......t..;........
.......
�..........
.......
......
.............
,............
...............—........—
.....N....N...
..........-.....-I.......
—..........
.......
..................................
..........
........
................
......-..-........--........-P--.....-...-..........
--........1-0-........
-.....-
..
........
.............
..........
....
-
Ley Rai i
.....0
2 NOISIMians 192OgVI "0
zo
JU 1 ,
o
L Op .
.
11 .
—'NI I.
. ..............
..................... . . ........
..... .....A,tN
. ........................ .. .....
.. ............
.... .... ...
..... . ............
....... .... ..
C� ...........
. ....... .... .......... . ....
........... ...........
. .......... .
mi T---
x OHtlO1 NVIO183W
3dV a
a 1 OSONV� IV-Id -IVNH
Z 3SVHd
NOISIARIMS M92HO 82NNVI
lu
f@y5
fld
a§k � Q�F pad
- e
T
rvi�«u. - g 3l1Y1
°II
� +I I I I I
t I I I I f I
i 444� I I I I I
_ e�p e _ o 0O ❑ 0° `�� YAM 96h1�
-
' I elm I ele i I I
II ! 0 I I I I I I I
—
e
—
J !
I I I I i I
TITnar
I � —
�� as
I
1+ 114,..'•� ' .
r a��dS
�Ma9
h
Page 7
OHV<31 'NVlUlH3A
3dVOSCINVI IV-ld -IVNlzl
Z 3SVHd = ma = CV
NOISIAiaens >192HO 82NNVI
ka
z
ku
-4
Cl 3NrIH%VW
73 171H;LVW
I sn 1
lk.
Ir'i,
91
4
M o'
V1
yv.L4 A,%,
6L QNNMhl=S9NZ--A4 ----iW
_ OHVal `NVI41a3W
3dVOSONVI ltlld 1tlNH r= m
Z 3SVHd F v W F co
NOISIMian5 M;198 J a3NNdl ao J E
h
- - H
fiLL
tj
+a =k
4:=
MUM
iMo • rtrt § yy s
�
I
�# � "��-�`E � •fir,.
Cl 3NIIH:DIVW
U 3NnH71tlW
Page 9
VI. CITY/AGENCY COMMENTS & CONDITIONS
A. Planning Division
I. Applicant shall comply with all previous conditions of approval associated with this
development [H-2022-0048,Development Agreement Inst. #2024-007677).
2. The applicant shall obtain the City Engineer's signature on the final plat within two (2)years
of the City Engineer's signature on the previous phase final plat as set forth in UDC 11-613-7
in order for the preliminary plat to remain valid; or, a time extension may be requested.
3. Prior to submittal for the City Engineer's signature,have the Certificate of Owners and the
accompanying acknowledgement signed and notarized.
4. The final plat shown in Section V.B prepared by Land Solutions Land Surveying and
Consulting, stamped on 6/4/2026 by Clinton W. Hansen, shall be revised as follows:
a. Note#11: Include the recorded instrument number of the ACHD temporary license
agreement.
b. Note#13: "Common lots Lot 9 and-34 27 in Block 7 are subject to a perpetual ingress
egress shared driveway easement for the benefit of Lots 10, 11,4-2-,22,23, and 24 in
Block 7 . . ."
c. The public alleys shall have a concrete ribbon curb,not a rolled curb and gutter, as set
forth in UDC 11-6C-3B.5—revise the construction drawings accordingly. The entrance to
the alley from the public street shall provide a minimum twenty-eight-foot inside and
forty-eight-foot outside turning radius.No parking shall be allowed on either side of the
street within 50 feet of the alley entrance as measured from the centerline of the alley—
the curb should be painted red to signify no parking or signage shall be erected
accordingly.
d. Include the Book and Page numbers of the Tanner Creek Subdivision No. I plat graphically
depicted on Sheet 1.
e. Include the recorded instrument number of the 33' access easement graphically depicted
on Sheet 1.
f. If Lot 12, Block 7 isn't taking access from the adjacent common driveway, the street
frontage shall be a minimum of 30 feet, measured as a chord measurement, as set forth in
UDC 11-2A-3B.I.
g. The common driveway lots(i.e.Lots 9 and 27,Block 7)shall be extended further in length
to allow for vehicles to back out and turn around.
An electronic copy of the revised plat shall be submitted with the Final Plat Mylar Signature
application.
5. The landscape plan shown in Section V.C,prepared by Jensen Belts Associates,dated 5/29/26,
shall be revised as follows:
a. The common driveway lots(i.e. Lots 9 and 27,Block 7) shall be extended further in
length to allow for vehicles to back out and turn around.
An electronic copy of the revised landscape plan shall be submitted with the Final Plat Mylar
Signature application.
6. Submit a copy of the"final"Ada County Street Name Review letter for the final plat.
7. A 14-foot wide public pedestrian easement for the multi-use pathway shall be submitted to the
Planning Division for approval by City Council and subsequent recordation prior to submittal
of the final plat for City Engineer signature.
8. Address signage shall be provided at the public street for homes accessed via common
driveways for emergency wayfinding purposes.
9. Comply with the common driveway exhibits included in Section V.0 above and the associated
standards in UDC 11-6C-3D for common driveways.
10. All fencing shall comply with the standards of UDC 11-3A-7C.
11. All development shall comply with the dimensional standards for the R-8 and R-15 zoning
district, as applicable, listed in UDC Tables 11-2A-6 and 11-2A-7,respectively.
12. The Developer shall widen W. Waltman Lane and reconstruct and widen the bridge across the
Ten Mile Creek after the Phase 1 improvements have been made,which include the Corporate
Drive extension, as required in the Cooperative Development Agreement with ACHD, as set
forth in the development agreement.
13. No building permits shall be issued for this development until the property has been subdivided
as set forth in the development agreement.
14. At no time shall construction traffic associated with the development of this site be allowed to
access this site using Ruddy Dr. through The Landing Subdivision, as set forth in the
development agreement.
15. The rear and/or sides of new homes facing Interstate 84 shall incorporate articulation through
changes in two or more of the following: modulation (e.g. projections, recesses, step-backs,
pop-outs), bays, banding, porches, balconies, material types, or other integrated architectural
elements to break up monotonous wall planes and roof lines that are visible from the subject
public streets per the development agreement. Single-story structures are exempt from this
requirement.
16. Staff s failure to cite specific ordinance provisions or conditions from the preliminary plat
and/or development agreement does not relieve the Applicant of responsibility for compliance.
Page 11
B. Public Works
c:,EN ERA L CONDITIONS:
1. Sanitary sewer service to this dcvclopnrcnt is avai lab]e via extension of existing mains adjacent to
the development. The applicant shall install mains to and through this subdivision; applicant shall
coordinate main size and routing with the Public Works Department, and execute standard forms
of easements for any mains that are required to provide service.
2. Water service to this site is available via extension of existing mains adjacent to the development.
The applicant shall be responsible to install water mains to and through this development,
coordinate main size and routing with Public Works.
3_ All Iinlxrovemeats relayed to pkiblic Iife, safety and health shall be completed prior to occupancy of
the structures. Where approved by the City Engineer, an owner may post a performance surety fot
such improvcments in order to obtain City Engineer signature on the final plat as set forth in UDC
1 l-5C-3B,
4. Upon installation of the landscaping and prior to inspection by Planning Department staff, the
applicant shall provide a written certificate orcompletion as set forth in UDC 11-3B-14A,
5. A letter of credit or cash surety in the amount of 110%evil l be required for all incomplete fencing,
landscaping. amenities,pressurized irrigation, prior to signature on the final plat.
6. The City of Meridian requires that the owner post with the City a performance surety in the amount
of 125%of the total construction cost for all incomplete sewer, water infrastructure prior to final
plat signature.This surety will be verified by a line item cost estimate provided by the owner to the
City. Tho applicant shall be required to enter into a Development Surety Agrectnent with the City
of Mendian. The surety can be posted in the form of an irrevocable letter of credit,cash deposit or
bond. Applicant must file an application for surety, which can be found on the Community
Development Depanmcnt websiic. Please contact Land Development Service for more
information at 987.221 1.
7. The City of Meridian requires that the owner post to the City a warranty surety in the amount of
20%of the total construction cost for all completed sewer. and water infrastructure for a duration
of two years_ This surety amount will be verified by a line item final cost invoicing provided by the
owner to the City. The surety can be posted in the fours of an irrevocable letter of credit, cash
deposit or bond. Applicant roust file an application for surety, which can be found on the
Community Development Department website. Please contact Land Development Service for
more information at 887-2211.
8. In the event that an applicant and/or owner cannot complete non-life, non-safety and non-health
improvements,prior to City Engineer signature on the final plat and/or prior to occupancy,a surety
agreement may be appro,•LA as set forth in UDC 11-5C-3C.
9_ Applicant shall be required to pay Public Works development plan review, and construction
inspection fees, as determined during the plan review process, prior to the issuance of a plan
approval letter.
10. It shall be the responsibility of the applicant to ensure that all development features comply with
the Americans with Disabilities Act and the Fair Housing Act.
11. Applicant shall be responsible for application and compliance with any Section 404 Permitting that
may be required by the Army Corps of Engineers.
12. Developer shall coordinate mailbox locations with the Meridian Post Office-
19. All grading of the site shall be performed in conformance with MCC I 1-1-48_
14. Compaction test rosults shall be submitted Lo the Meridian Building Department for all building;
pads receiving engineered backfill, where footing would sit atop fill material-
15. The engineer shall be required to certify that the street centerline elevations are set a niinimum of
3-feet above the highest established peak groundwater elevation. This is to ensure that the bottom
elevation of the crawl spaces of homes is at least 1-foot above.
I& The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage
facility within this project that do not fall under the jurisdiciion of an irrigation district or ACHD.
The design engineer shall provide certification ilia(the faci Iities have been instal led in accordance
with the approved design plans.This certification will be required before a certificate of occupancy
is issued for any structures within the project.
17, At the completion of the project, the applicant shall be responsible to submit record drawings per
the City of Meridian AutoCAD standards. These record drawings must be received and approved
prior to the issuance of a certification of occupancy for any structures within the project.
I& Street light plan requirements are listed in section 6-7 of the Improvement Standards for Street
Lighting (hitp:lfwww.meiidlancity.orgy'public_works.aspx?id=272). All street lights shall be
installed at developer's expense. Final design shall be submitted as part of the development plan
set for approval, which must include the location of any existing street lights. The coutractoris
work and materials shall conform to the 1SPWC and the City of Meridian Supplemental
Specifications to the ISPWC. Contact the City of Meridian Transportation and Utility Coordinator
at 898-5500 for information on the locations of existing street lighting.
19. The applicant shall provide easement(s) for all public waterlsewer mains outside of public right of
way (include all water services and hydrants). The casement widths shall be 20-feet wide for a
single utility,or 30-feet wide for two. Tice easements shall not be dedicated via the plat, but rather
dedicated outside the plat process using the City of Merid1an's standard forms. The easement shall
he graphically depicted on the plat for reference purposes. Submit an executed easement (an the
form available from Public Works),a legal description prepared by an Idaho Licensed Professional
Land Surveyor,which must include the area of the easement(marked.EXHIBIT A)and an 81i2"x
I I- map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be
sea]cd, signed and dated by a Professional i.and Surveyor. DO NOT RECORD. Add a note to the
plat referencing this document, All easements must be submitted,reviewed,and approved prior to
signature of the final plat by the City Engineer,
20. Applicant shall be responsible for application and compliance with and NPDES permitting that
may be required by the. Envirnnmentai Protection Agency.
21, Any -,N.clls that will not continue to be used must be properly abandoned according to Idaho We11
Construction Standards Rules administered by the Idaho Department of Water Resources. The
Developer's Engineer shall provide a statement addressing whether there are any existing wells in
the development, and if so, how they will continue to be used, or provide record of their
abandonment.
22, Any existing septic systems within this project shall be removed from service per City Ordinance
Section 9-14 and 9 4 S. Contact the Central District Health Department for abandonment
procedures and inspections.
23. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round
source of water(UDC 11-3B-6-)- The applicant should be required to use any existing surface or
well water for the primary source. If a surface or well source is not available, a single-point
Page 13
connection to the culinary water system shall be required. if a single-point connection is utilized,
the developer will be responsible for the payment of assessments for the common areas prior to
development plan approval_
24. All irrigation ditches, canals, laterals, or drains, exclusive of natural watenvays, intersecting,
crossing or laying adjacent and contiguous to the area being subdivided shall be addressed per UDC
11-3A-6. In performing such work, the applicant shall comply with Idaho Code 42-1207 and any
other applicable law or regulation.