ACHD Comments
, <
.-J
.,#f;i~it,,-
~
Co~uttc ~
John S. Franden, President
Rebecca W. Arnold, Vice President
Sherry R. Huber, Commissioner
Dave Bivens, Commissioner
Carol A. McKee, Commissioner
June 28, 2007
To:
Ahlquist Development, LLC
13901 N. Wainwright, STE B
Boise, 1083709
RECEIVED
JUN 2 9 2007
CITY OF MERIDIAN
CITY CLERK OFFICE
Gardner-Ahlquist Gateway South Subdivision
S/E/C of Eagle and Franklin Roads--"--...-
On June 28, 2007, the Ada County Highway District staff acted on your application for the above
referenced project. The attached report lists site-specific requirements, conditions of approval and
street improvements, which are required.
Subject:
If you have any questions, please feel free to contact me at (208) 387-6178.
Sincerely,
4Yl/AlldfwLl/btu
Mindy Wallace
Planner II
Right-of-Way & Development Services
Ada County Highway District
CC: Project file, Utilities
City of Meridian, Horrocks Engineers
Ada County Highway District. 3775 Adams Street. Garden City, ID . 83714 . PH 208.387.6100 · FX 345.7650 · WWW.achd.ada.id.us
.. <
Right-of- Way & Development Services Department
--~-.
.tII'f ~-......7 . ~ ~
~
fJorwnWtred~ ~
On May 24th 2007 District staff received an application for Gardner-Ahlquist Gateway South Subdivision.
This site is directly to the south and abuts Gardner-Ahlquist Gateway Subdivision approved on April 18th,
2007. Due to the close proximity and limited changes in the proposed roadway configurations the original
staff report for Gardner-Ahlquist Gate Subdivision has been revised to reflect the changes made with the
addition of the properties to the south. Comments regarding Gardner-Ahlquist Gateway South Subdivision
are in blue type.
Project/File:
Lead Agency:
Site address:
Commission
Hearing:
Staff Approval:
Applicant:
Ahlquist
Representative:
Staff Contact:
Tech Review:
1
Gardner~Ahlquist Gateway Subdivision
This is an annexation, zoning, and preliminary plat application for 10-cammericallots
on approximately 25 acres.
Gardner-Ahlquist Gateway South
This is an annexation, zoning, and preliminary plat application for 6-commericallots
on approximately 6.67 acres.
City of Meridian
Southeast corner of Eagle and Franklin Roads
April 18, 2007
June 28, 2007
Ahlquist Development, LLC ~ Tom
1263 West Wickshire
Eagle, 1083616
Treasure Valley Engineers - Penelope
Riley
1204 6th Street North
Nampa, 1083678
Horrocks Engineers - Kelly Hoopes
5700 E. Franklin Rd, STE 160
Nampa, 10 83687
Mindy Wallace
Phone: 387-6178
E-mail: mwallace@achd.ada.id.us
March 30, 2007
Gardner~Ahlquist Gateway Subdivision
<- <
Application Information:
Acreage: 25 6.67
Current Zoning: R-1 R-1
Proposed Zoning: CG CG
Commercial Lots: 10 6
General Office: 160,000 sq, ft.
Medical Office: 75,000 sq. ft.
Retail: 34,000 sq. ft.
Hotel: 1
A. Findings of Fact
Existing Conditions
1. Site Information: This site currently consists of 19 single-family dwellings. The south phase of the
development consists of 7 single-family dwellings.
2.
Des . .
crlptlon 0 IJacen urroun Ing rea:
Direction Land Use Zoning
North General Retail & Service Commercial C-G
South Limited Office & St. Luke's Hospital L-O
East Limited Office L-O
West Low Density Residential R-2
fAd'
tS
d' A
3. Existing Roadway Improvements and Right-of-Way Adjacent To and Near the Site
. Eagle Road is currently improved with 6 traffic lanes, and curb, gutter, and sidewalk abutting the
site. There is between 160 and 16B-feet of right-of-way existing for Eagle Road (between 80 to
B4-feet from centerline). Eagle Road is under the jurisdiction of the Idaho Transportation
Department.
. Franklin Road is currently improved with 6 traffic lanes, and curb, gutter, and sidewalk abutting
the site. There is 98..feet of right-of-way existing for Franklin Road (49-feet from centerline).
4. Existing Access: There are several existing access points located off of both Eagle and
Franklin Roads.
5. Site History: ACHD has not previously reviewed this site for a development application.
Development Impacts
6.
Trip Generation:
This development is estimated to generate 7,210 additional vehicle trips per
day based on the submitted traffic impact study. The south phase of the
development was included for analysis and findings in the original traffic
impact study. No additional information related to the traffic impact study was
requested with this application.
7.
Impact Fees:
There will be an impact fee that is assessed and due prior to issuance of any
building permits. The assessed impact fee will be based on the impact fee
ordinance that is in effect at that time.
2
Gardner-Ahlquist Gateway Subdivision
. '
8. Impacted Roadways:
Roadway Frontage Functional Traffic Count Level of Speed
Classification Service* Limit
Eagle Road 770' Principal 51,999 north of Exceeds 35 MPH
Arterial Franklin Road on "E,t
470' 9/14/05**
Franklin Road 850' Principal 13,529 east of Better 50 MPH
Arterial Eagle Road on than
9/14/05** uC"
*Acceptable level of service for a six-lane principal arterial roadway is "E" (38,000 VTD).
** District staff did look into obtaining a recent traffic counts for this development. New traffic counts
were not collected at the time of this application due to the numerous road closures in the area.
9. Capital Improvements Plan/Five Year Work Program
The following improvements are scheduled in the District's Five Year Work Plan.
. Franklin Road between Touchmark Way and Five Mile Road is scheduled to be widened to
5-lanes in 2009.
. The intersection of Franklin Road and Cloverdale Road is scheduled to be widened to 7-
lanes on the north leg, 6-lanes on the south leg, 9-lanes on the west leg, and 8-lanes on the
east leg, and signalized in 2009.
The following improvement is scheduled in the District's Capital Improvement Plan (CIP).
. Franklin Road between Eagle Road and Cloverdale Road is scheduled to be widened to 7-
lanes in 11 to 20 years.
B. Findings for Consideration
1. Traffic Impact Study
A traffic impact study for Meridian Gateway was prepared by Horrocks Engineers. Below is a
summary of the findings.
o The Meridian Gateway Development is planned to be located south of Franklin Road
and east of Eagle Road in Meridian, Idaho. The intersections counted were Eagle
Road/Franklin Road, Eagle Road/St. Lukes Drive, and Touchmark Way/Franklin Road.
o The Meridian Gateway consists of approximately 160,000 sq. ft. of general offices, ,
75,000 sq. ft. of medical offices, 34,000 sq. ft. of retailers and one hotel.
o The site proposes one right-in/right-out only access on Eagle Road, one full access on
Franklin Road and one full access on St. Luke's Drive. Under full build conditions the
development is expected to generate 7,210 new daily trips. Of these trips 449 will occur
during the AM peak hour and 685 will occur during the PM peak hour.
o During the existing AM peak hour the Eagle Road/Franklin Road intersection operates at
LOSC and Eagle Road/St. Luke's Drive and Franklin RoadlTouchmark Way
intersections operate at LOS B. During the existing PM peak hour the Eagle
Road/Franklin Road intersection operates at LOS 0, the intersection of Eagle Road/St.
Luke's Drive operates at LOS C, and the intersection of Franklin RoadlTouchmark Way
operates at LOS B.
3
Gardner-Ahlquist Gateway Subdivision
o After traffic generated by the project is added to the roadway network the study
intersection of Eagle Road/Franklin Road experience an increase in delay and will
operate at LOS E during the PM peak hour. The intersection of Eagle Road/St. Luke's
Drive operates at LOS C. The Franklin RoadlTouchmark Way intersection is expected
to operate at LOS B.
o The proposed Meridian Gateway is anticipated to impact traffic operating on adjacent
roadways. However, the roadway and intersection improvements listed below will
substantially mitigate the impacts and provide adequate traffic safety and operations on
both Eagle Road and Franklin Road. The following recommendations are given:
· The intersection of Eagle Road/Franklin Road may be reconstructed with three
northbound thru lanes in the future. When and if this occurs, an exclusive right
turn lane in the northbound direction of travel will be required. Right-of-way
should be preserved for this future improvement.
· The intersection of Eagle Road/Franklin Road should also include an exclusive
right turn lane in the westbound direction of travel. This may occur as part of a
future roadway improvement project.
· The development should provide exclusive right-turn and left-turn outbound lanes
and exclusive right-turn and left turn inbound lanes at all projected access to
improvement to improved traffic operations. Left turn lanes are not required at
.the right-in/right-out access.
o The intersection of Eagle Road/St. Luke's Drive may need to be reconstructed with
exclusive right turn lanes for the westbound and northbound direction of travel. Right-of-
way should be preserved for this future improvement (to be completed by the developers
of the south-west corner of the site).
o No additional off-site mitigations are required to provide adequate traffic operations.
o With the recommended mitigations it is expected that all study intersections will operate
at LOS D or better with the exception of the Eagle Road/Franklin Road intersection.
Staff Comment/Recommendation: Staff comments are provided by District Traffic Services Staff.
. Field observations indicate that the intersection of Eagle/Franklin and Eagle/St. Luke's
operate worse than LOS D and C respectively in the PM peak hour and LOS Band C in the
AM peak hour. While the TIS does not give the HCM output, it is suspected that this is
because they set the initial unmet demand to 0 which is the default. This value assumes
that all vehicles in the queue make it through the intersection on the green phase. In reality,
both of these intersections back up 1f2 to 1 mile during peak hours and should be reflected in
the initial unmet demand values. This would affect the analysis for the build-out year as
well.
. ITD has no plans to construct three northbound lanes as the TIS suggests.
. ACHD does not have any plans to add an eastbound right turn lane as the TIS suggests.
. Split phasing of the signal at St. Luke's/Eagle Road intersection as the TIS suggests will not
happen due to the excessive delay it would create.
4 Gardner-Ahlquist Gateway Subdivision
. The pass-by and internal capture percentages are consistent with ITE procedures.
2. Eagle Road
Staff Comment/Recommendation: Eagle Road is under the jurisdiction of the Idaho
Transportation Department (ITD). The applicant, the City of Meridian, and ITD should work
together to determine if additional right-of-way or improvements are necessary on Eagle Road.
3. Franklin Road
Right-of-Way Policy: District policy requires 96-feet of right-of-way on arterial roadways (Figure
72-F1 B). This right-of-way allows for the construction of a 5-lane roadway with curb, gutter, 5-foot
concrete detached sidewalks and bike lanes.
Sidewalk Policy: District policy requires 7-foot wide attached (or 5-foot detached) concrete
sidewalk on all collector roadways and arterial roadways (7204.7.2).
Applicant's Proposal: The applicant has proposed to dedicate additional right-of-way along
Franklin Road abutting the site.
Staff Comment/Recommendation: The applicant will be required to dedicate 60-feet of right-of-
way from the centerline Franklin Road abutting the site. The 60-feet of right-of-way will
accommodate the road widening project scheduled in the District's Capital Improvement Program.
The applicant will not be required to construct a sidewalk with this application, as it already exists.
Franklin Road between Eagle Road and Touchmark Way is on a 5-year no cut moratorium until
2010, due to its reconstruction in 2005. Submit all pavement cut requests to Chuck Rinaldi at 387-
6258. Additionally, Franklin Road is scheduled to be chip-sealed in 2007. Any work (pre-approved
though cut panel) will need to be completed prior to the chip-seal operation or contact District
Maintenance and Operations to the delay the chip-seal process.
4. Internal Streets
Right-of-Way Policy: District policy requires 54-feet of right-of-way on industrial/commercial
roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 3-lane roadway with
curb, gutter and 5-foot wide concrete sidewalks.
40-foot Street Section Policy: District policy 7202.8 and 72-F1A, requires roadways abutting
commercial developments to be constructed as a 40-foot street section with curb, gutter and 5-foot
concrete sidewalk within 54.;.feet of right-of-way.
Applicant Proposal (Internal streets): The applicant is proposing to construct the internal streets
as a 40-foot street section with two 20-foot travel lanes, vertical curb, gutter, and 5-foot concrete
sidewalks within 54-feet of right-of-way. One of the new internal streets (E. Louise Drive) is
proposed to tie into existing E. Louise Drive, a stub street which was constructed as part of
Touchmark Living Center Subdivision. This roadway connection provide access to the signal at
Touchmark and Franklin Road.
The applicant has proposed to tie into one other existing loop roadway (N. Montvue Drive), located
approximately 340-feet east of the west property line (measured property line to centerline). The
loop road (N. Montvue Drive) is then proposed to terminate with a temporary turnaround easement
on lot 2. The section of N. Montvue Drive located north of the temporary turnaround is proposed to
be vacated, approximately 220-linear feet.
5
Gardner-Ahlquist Gateway Subdivision
Additionally, the applicant has proposed vacate or exchange segments ot the existing right-ot-way
tor N. Montvue Drive to accommodate the development. The vacation or exchange ot the existing
right-ot-way will allow the applicant to construct new roadways needed to serve the development
(see Exhibit A & B).
The applicant is no longer proposing to tie into an existing loop roadway (N. Montvue Drive).
Instead the applicant is proposing to take all site access trom the two new roadways being
constructed to serve the development (E. Louise Drive and N. Montvue Park Drive).
The applicant has proposed vacate or exchange all of the existing right-ot-way tor N. Montvue Drive
to accommodate the development. The vacation or exchange of the existing right-of-way will allow
the applicant to construct new roadways needed to serve the development (see Exhibit A & B).
Staff Comment/Recommendation: The applicant's proposals meet District policy. The applicant
will be required to submit a vacation application for the existing right-ot-way to be vacated or
exchanged OR improve the right-ot-way to current public street standards. The vacation/exchange
process is separate and distinct trom this process and staff does not guarantee the outcome ot that
process as it relates to this current proposal.
The applicant's proposals meet District policy. The applicant will be required to submit a vacation
application tor the existing right-ot-way to be vacated or exchanged OR improve the right-ot-way to
current public street standards. The vacation/exchange process is separate and distinct from this
process and staff does not guarantee the outcome of that process as it relates to this current
proposal.
5. Roadway Offsets
Roadway Offset Policy: District policy 7204.11.6, requires local roadways to align or offset a
minimum of 300-feet from an arterial roadway (measured centerline to centerline).
District policy 7204.11.6, requires local roadways to align or offset a minimum ot 125-teet trom
another local roadway (measured centerline to centerline).
Applicant Proposal: The applicant has proposed one roadway (E. Louise Drive) to intersect Eagle
Road located approximately 200-teet north ot the south property line (measured property line to
centerline). This roadway would be restricted to right-in/right-out due to the recently installed
concrete median on Eagle Road.The applicant has proposed to construct one roadway to intersect
Franklin Road located approximately 360-feet west of the east property line (measured property line
to centerline).
Staff Comment/Recommendation: Eagle Road is under the jurisdiction ot the Idaho
Transportation Department (ITD). The applicant should coordinate ITD to determine the exact
location ot access on to Eagle Road.
The applicant's proposal to allow one roadway (N. Montvue Park Dr.) to intersect Franklin Road
meets District policy. During the pre-application meeting, ACHD staff agreed to a left-in/right-
in/right-out only at this intersection. The applicant will be required to design a median to restrict this
roadway to left-inlright-in/right-out only and will be required to coordinate the design with District
Traffic Service staff.
6. Tree Planters
Tree Planter Policy: The District's Tree Planter Width Interim Policy prohibits all trees in planters
less than 6-feet in width. In addition to prohibiting trees in planters less than 6-teet in width, the
policy requires a minimum planter width of 6-feet for class II tress with the installation ot root
barriers on both sides of the planter strip or a minimum planter width of 8-feet without the
6 Gardner-Ahlquist Gateway Subdivision
installation of a root barrier. The policy also requires Class I and Class III trees to provide a
minimum planter width of 10-feet.
7. Other Access
Eagle Road and Franklin Road are classified as principal arterial roadways. Other than the access
specifically approved with this application, direct lot access is prohibited to these roadways and
should be noted on the final plat.
C. Special Notice to the City of Meridian
All of the identified roadway and transportation mitigation proposals in the submitted Traffic Impact
Study are either not in any public agency plans to construct (ACHD & ITD) or proposed by the
applicant to be constructed. Therefore, the impacts of this development cannot be adequately
mitigated and surrounding intersections will not operate at an acceptable level of service.
D. Site Specific Conditions of Awroval
1. Comply with requirements of ITD and City of Meridian for the Eagle Road frontage. Submit to the
District a letter from ITD regarding said requirements prior to District approval of the final plat or
issuance of a building permit (or other required permits), whichever occurs first. Contact the District
III Traffic Engineer at 334-8340.
2. Dedicate 60-feet of right-of-way from the centerline Franklin Road abutting the site.
3. Construct the internal streets as a 40-foot street section with two 20-foot travel lanes, vertical curb,
gutter, and 5-foot concrete sidewalks within 54-feet of right-of-way, as proposed.
4. Construct one temporary turnaround on lot 2, as proposed.
5. Submit a vacation application for the existing right-of-way on N. Montvue Drive to be vacated or
exchanged. If the vacation/exchange is not approved by the District through the separate process,
the applicant will be required to improve the existing roadways to current public street standards
6. Construct one roadway (E. Louise Drive) to intersect Eagle Road located approximately 200-feet
north of the south property line (measured property line to centerline).
7. Construct one roadway to intersect Franklin Road located approximately 360-feet west of the east
property line (measured property line to centerline). Design and install a median to construct on
Franklin Road that will restrict this roadway to left-in/right-in/right-out only.
8. Other than the access specifically approved with this application, direct lot access is prohibited to
Eagle Road and Franklin Road and shall be noted on the final plat.
9. Comply with all Standard Conditions of Approval.
E. Standard Conditions of AQProval
1. Any existing irrigation facilities shall be relocated outside of the right-of-way.
2. Private sewer or water systems are prohibited from being located within any ACHD roadway or
right-of-way.
7 Gardner-Ahlquist Gateway Subdivision
3. All utility relocation costs associated with improving street frontages abutting the site shall be borne
by the developer.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file
number) for details.
5. Comply with the District's Tree Planter Width Interim Policy.
6. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by
the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details.
7. All design and construction shall be in accordance with the Ada County Highway District Policy
Manual, ISPWC Standards and approved supplements, Construction Services procedures and all
applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State
of Idaho shall prepare and certify all improvement plans.
8. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or
other required permits), which incorporates any required design changes.
9. Construction, use and property development shall be in conformance with all applicable
requirements of the Ada County Highway District prior to District approval for occupancy.
10. Payment of applicable road impact fees are required prior to building construction. The assessed
impact fee will be based on the impact fee ordinance that is in effect at that time.
11. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The
applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant
shall be required to call DIGLlNE (1-800-342-1585) at least two full business days prior to breaking
ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in
the event any ACHD conduits (spare or filled) are compromised during any phase of construction.
12. No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized
representative of the Ada County Highway District. The burden shall be upon the applicant to
obtain written confirmation of any change from the Ada County Highway District.
13. Any change by the applicant in the planned use of the property which is the subject of this
application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or
other regulatory and legal restrictions in force at the time the applicant or its successors in interest
advises the Highway District of its intent to change the planned use of the subject property unless a
waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at
the time the change in use is sought.
8 Gardner-Ahlquist Gateway Subdivision
F. Conclusions of Law
1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval
are satisfied.
2. ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
9 Gardner-Ahlquist Gateway Subdivision
Attachments
1 . Vicinity Map
2. Site Plan
3. Exhibit A
4. Exhibit B
5. Request for Reconsideration Guidelines OR Appeal Guidelines
6. Development Process Checklist
','" '1\'1 :
j:" ".,ti
,,~.\, '
i\:t', .,.""
t'i,: ","-,
," ",14 '
..,'~
" 1,/
". '...
. ,'~..
. ,;F";'~1I
\ ,~ I' ~:' 'I' .
... ..; '"'~. I ., ~
I
~~ '.~.
10
Gardner-Ahlquist Gateway Subdivision
"
,- ...-
.- ~
~~
~
~
'!\',Mllddi HO.~ >>.:o::;r
XOI.LdIUJS:=l<I
C\21
I
.1
a'
~I
"l
?
c3
..........
C/J
t;:
..........
ql
~
...:;)
Crj
--
~ ,~
~~ ~ ~
_:1:~ ;.-:
;:: ~-: ..:-";
, . j
1--'11:1
;. ; I :~I
i .:.rL'l:l/~ll tIM ..: z!
1 3:.1 YI1 IAFlI'ON: it..
ji
if ,
i i~.:. ,l
: l~~; e~ ,,1';
i jd~~~~il~~~~!~~ ~~
" ~~~~jhMij"'~f' ~<
~ ~.p;~'L..il.r~_L~.:\__""_""
~ ! I
I
.,
~+ 3
I
}'I
.. . ,', i
:J~:~J~r [~j1
'. '1':'
"
i
,Ii,
II"G'
!j
f~ .
,:A
j'
P' ---I
i
~ ::.'
~~;~~;~:;:~;( f~~~~
lN3ndOu.<ao JSln01HV
'I.:,
,-:
,.1,
'1'<'
"::,
.'
'"
~\"'~;- -
I
(;C~ ~k
it~ . {
ih ..-
_ .;l'-'" ',---> I
~~~,:nl.''':~(~'''\-i~Kit.I;
?
0;
! :,.;
Ii
. c-,~ 'Or~.7
.' '~:"t:. I..:.
':"1nHt~. 'w1If0lj"
~,,""r, Y """'1""<w I,j....
].~''':2 _ ~ .:1""'";" .:t:....<ti(.{.~
.HlJjJ.\';l;l'" ...~;'rclkri
.I
~ ~
St ; ~
;: ::: j!: ~'
~ i ~
~
1 ~ ,
~ ~ '
~' ~ ~ ~
'" ; ? i
~ ~ :.
~~ s~
~~ :~~ ~,
~~~ ~t 2
\II...t"'...Ittu.t........~'&a1Ul'.oJJU. ~,
~~. ~~:- (~~i";'
,.~.:::',:- ...J1Tt~~m)~ . '{~'i:'?';-
; ~
it,
'~ 1.. ; ~ L~ ~, ,d d
I ; ~~ ." ! ~ ;; ~ ~< ~ i ~. ~~*
:.~~ :.: ~ L~ ;,~ ~_..i:; H" :! !~~
. ~~~ ';~i "',, ~, 1~~~~ '"j" ~~;
'ill !l! 1I!!!l !~UI~Mli
L". ~'" '1"'" ",<""",.',..,
~ ~~~ ~~~<~;~~~~!~;ii~~j~~m~~i
L,...h l:l~i~..'l;"~,,,~'~":i'':''!l:'F:';:>~ .~~_LJ.
"';11 :;"',":F~l,}~~~r,~~;'~~~l!;~~ ;;~~~1~~~g:,
~ ~~~~~~~!'~;~'~~~l;m~l~i~~~'~~
. ; ~ ;r.)~~:~~~:~!~:~~~H!~ ;~l~ ~ 1~1
. ; . . ::
"':.:
[
....~: ':;.-.:
.~.<:>"~~...
..I....,;~.:
.~, .~....::':
I
~:
~I
."
".
'{
;
'n '. ~
"':r :::l'
.;c: :-:.)
. ;
J
.::fdH;
:~t~~. V',\lI.i
-L'/1d AKTlIlJlIW:d
(,'01\ _'IIO]~\lQBf1~ ).J.a:uv~
LSW~IlI"'IIlI~alll'" 'T,.;~
!
I
I
h
f
~ !
;. ~ r- .
~Bi
~~i
I~I
_3J
~~ .." .....~
'-"''-..
:~ ::..,..:.-.:.
-.,""
'-~ C~', :=:
~; .~,~:
~-:-~ ..<
E-< ".
~I ~~:~
~~ .;:::
::;::j
>-l..;
~
I
R:
~
?
~I
231
,
>.
,
I ....
...__.~ .-'.--.-~
;'}.""III\l)1MMI
7l:.l1ti1l .
~,.
"'."('.
, .~. .;\
,'8'
~i
,"Ii;
1
~I---
.;
'..,!---
i"
1-
,~
~:!
it ~
'~.
. ~~ ,; .. . <:j
,..':~, l'~.c. ~.~,;:~_~.,
,';,
- ._---. ~_.
).
\-
..........,;,.
'h
.....
'::4"..-c-
.:t~;'i.
\.
T,
....
, '.
i i-
r--
I
-~"':
;; u
'il"~--f' .;
~J1&1" ,.
0' -::t '''''-
g( ~:j.' :r:/.',:.. -~';r'-~.'~;YA ..
- .-:~j
:- .,'
.!"'!.'..~T.":7"~__.~:.;=:....:....--::-i_"""'"'"~ ~.:l.
;il~ E2""T_~',
":"'~
~=~~
r ! ~
H~
d~
Exhibit A
Right-of-Way to be Vacated .
1~ ..-.. _.=j.:...-....:.~ t-...:',=- f:;",-~'~:':':'~"r" - ..-.. -.. r"-"-"~
r4~ I : I I . I
I"(f) : 1&\ I <5> ; n\: I'J\
I \21. I~I >.,;v I
1--..-..--,-.._ -l' . : c'/l.. '\ I
! .... I a\.o ~
~! @ '-"i-"-"~,, ~f.. f1~~ (D I'
'- . ,'~ . ': - ",-, ~'^S\O"\ ,,01'
f ,..;,;.@ 5'1 l''''~: II
'; I I ,', '000"';" "-..J
! I ,(Doc'/.. '2 i ..,............... '
. 1 a\.J Ii\ " ",
...... I ur
. c.--
"'1 ..-:::t::-..... "'" '. -' '
I I I 1'..:::...... f.. .:.... i (fi) I
I :@II"CIDlI i:!l ,._".~:.~,_ : ,
. I I: , a,\.OC": '.',. J
. I I : ", '.'::. I . , " .
I I .L' I ..' CD \ ,_"-"--- 01
~"r -----T'"'''- ...., . .r' , .-
I I t-..-..-..-:. "<:-..l. :t;; q ~
r----1 (9) ........:::::-__.. ,: Q)! .-
II (1) Q) i ---.. ::::......... I
C"f.. 4 I . "
I I i: a\.O: i; ",",:', I J.I
H-SI89'30'07-E I 589'JO'24-E: t.! I :.' .,:.~:;1
~r:-~- ~- if~.._.._.._ ....J' . .-
1226.03' 179.37' . r-"-"--' :~ b
I I <2>: ": I'&l
· I I CD : .
I I@B !. ~.!~~l;t-: S89'30'09-J; CD I
I IUI' 200 23 ----- I
I .. SOO,:t19" 199.73'
I I . 16.12 I ' . , PO
II r+----T----- _ · - ,~... ~4~-V
I I I . · ....... " ~ I~
~I ! l@!@OC\(If)Q)1401NOTA PART ~i~
i I ! 'O\.J I i + 51,111 sa. "-:I: NI~
: ~-------1-----------i------------1.1-----------.J
, N89"28'41.W 1011 7?'
12
Gardner-Ahlquist Gateway Subdivision
Exhibit B
New Roadways to be Constructed
.
oj_,
~A.-rr4 .
..~ .
I..t
; :.r" 2':'S:-: 2." .
i' 1'; ;--1, - ~~6---=-'=-=-:_--~~.i-~~'
i:i I / ..." !J'osro Pl.i~p
I\B-W ./" I'~ I l.NFI'i'p'-;e-[ S ~.4.':'I0N' 55) 'a-
S 'Y)' ,-.:1 (:J.~.o.~' ........... (\.c,~ ,~
\ ,,.: I ~5' \..') '9\" c,;'
, ,,_l.ll<NDSC.\PE ~_o" '0 .,... \'
!ffl : .'$ "..~^
I-~~': ~..J'I----' -- ---, -
'( I " S6~"'O:~", ,g~ -~--
I -' ," ".
'U " . ~
iii, ! ! " ' . I '."""0-'-
~' ,. I '0"'"
~i li:l . ,. -
al 'i.!.
",' :,'1
.j '"
I \~:
I .:'
I 1.'1
, -' "
.,
r I:j
!
,Jng '2.~ - --, _, "C' ;- - ... . ..,- ... - ", 'I,"'" . _...':!'!,-'="~;---"-'_ -- __ .
/l.,e2.ot ( . E.. FJW(tClJN -AD (PuBUC) C(X(~ECT (~5J;NG ,"\ ~-~ -- - .~ :"M_--"":' ~.~..:=-..:~j.ifii:A~
eo ~ N.~7.'H.r ~".. - '-".-0\ ' .. _ ~~- .... 10" "AI...'" .. -\-- 4-' .. ~,o,
· ;..~'.,.. '~"~~0~~f~~i~~'~;.:-.... ~_::;[~;~[~~~~
'<lJ . .....~"t I . ~ 35
3 ~G,86}io_ rT. b ". 'UI.~~~~E
t'.jll Al'::!:('E3 . ...._..*SSUUf;O l("!CJ..TlOI1l Or PROPosm
Sf(PAG( lJf:O .v ~,At"AGr SlOR1f yfl. ~
~ rno\l J,1)1l,) RtC.l,i"~-WAY.
CH.-.or R~AO~ 1Q .Sr.(i:'ACF ~m
.1.
-j
!
~:)
'9\''''~! -
. .
'1
PRO,:)OSro t~~
_ ,__ ~;_~~f~V~R :~:':':'~__.~~
I --!~ _n .~ --- "..,--"
( . ';-,,-
" ~J
100,092 so: Vi.
..:... 4"'J ACfll:::S
(---,
"
'..j
IOJ,~6 ):C. F"r.
;!.J7 A\~RE.s
-;
I
m
j
I
]
W' pr..OUf; Ul11lT:, InAI{;A"'i"!C~~ &:
t_~~~_lANO:$CAPE. ~AS(ME}'f
'l'l.~C ~.C.w, ("....)
r" ~,- '!1~-M~l
t (~ r:
ll,':)o!. sQ_ F"l'_ t:;=;.
n~"~7~;~,rtiS C ?-2~A5. I
"~ ;.1:;:;1' - .~ _'r"_ - ~ --'
...
"
~~~
'"' i~
"'~
18
iDB,'''' SQ. r..
,-,;.0 Acr.!ES
~!
1, ~8$>
iff,,'
s'
t~~'
~~.I
_,,~ 4-
-r<fl"
.,,)0',
, ~c)'.
~I~_~~~= ~ i
I -, ,;;ag.~OV.4~JI!lO:/:" > llL~~ --~-=-r-' __-.1
[:A:S:I'lC ~ ,"" ~, . ~(' / "~~pJE'~i: :7~~,".J I
~~~~~~ ~U'JQ,~~:;:--" ," ,.." '1L~'
,', 1.1 ~,~~!"". "
"-- I
",: '\:-~, \ )
\'---... N. """'T'IU~ PA!lK DR. (Nlluc) - - /1
I . "---...._--!-.~-----_._'_._.----
(:)
, SUI..j" $"'. ;:-;.
" ~'-~.19 ,'GR[t
]
~
"ii
:..~'---- ,
f So!il~14.::f}'( l,=,;I_$t"
~ :)~OPO'SEO ...cc~s~ &
,;;::,r It;~-.Af\'.\A,:I~D
t...WJr.......r
I i I I
I II I
i "t,1 ,i
.LI'
!f
.'
13
Gardner-Ahlquist Gateway Subdivision
II
Development Process Checklist
II
l8lSubmit a development application to a City or to the County
l8lThe City or the County will transmit the development application to ACHD
l8lThe ACHD Planning Review Division will receive the development application to review
l8lThe Planning Review Division will do one of the following:
DSend a "No Review" letter to the applicant stating that there are no site specific requirements at this time.
DSend a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part
of a previous development application and that the site specific requirements from the previous development also
apply to this development application.
l8lWrite a Staff Level report analyzing the impacts of the development on the transportation system and evaluating
the proposal for its conformance to District Policy.
DWrite a Commission Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
l8lThe Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports.
DFor ALL development applications, including those receiving a "No Review" or "Comply With" letter:
· The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development
Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required
by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.)
· The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way,
including, but not limited to, driveway approaches, street improvements and utility cuts.
DPay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Zone)
o Driveway or Property Approach(s)
. Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by
Development Services & Traffic Services). There is a one week turnaround for this approval.
o Working in the ACHD Right-of-Way
. Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application"
to ACHD Construction - Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are
placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
o Sediment & Erosion Submittal
. At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan
Designer, must be turned into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Drainage
Division.
o Idaho Power Company
. Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being
scheduled.
o Final Approval from Development Services
ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-Con.
14
Gardner-Ahlquist Gateway Subdivision
Request for Appeal of Staff Decision
1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of
the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did
not properly apply this section 7101.6, did not consider all of the relevant facts presented,
made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the
interpretation or enforcement of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable fees to be
charged the applicant for the processing of appeals, to cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the
Secretary of Highway Systems, which must be filed within ten (10) working days
from the date of the decision that is the subject of the appeal. The notice of appeal
shall refer to the decision being appealed, identify the appellant by name, address
and telephone number and state the grounds for the appeal. The grounds shall
include a written summary of the provisions of the policy relevant to the appeal
and/or the facts and law relied upon and shall include a written argument in support
of the appeal. The Commission shall not consider a notice of appeal that does not
comply with the provisions of this subsection.
c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date
of the filing of the notice of appeal to reply to the notice of the appeal, and may
during such time meet with the appellant to discuss the matter, and may also
consider and/or modify the decision that is being appealed. A copy of the reply and
any modifications to the decision being appealed will be provided to the appellant
prior to the Commission hearing on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the
appeal will be noticed and scheduled on the Commission agenda at a regular meeting
to be held within thirty (30) days following the delivery to the appellant of the
ROWDS Manager's reply to the notice of appeal. A copy of the decision being
appealed, the notice of appeal and the reply shall be delivered to the Commission at
least one (1) week prior to the hearing.
e. Action by Commission: Following the hearing, the Commission shall either affirm or
reverse, in whole or part, or otherwise modify, amend or supplement the decision
being appealed, as such action is adequately supported by the law and evidence
presented at the hearing.
15
Gardner-Ahlquist Gateway Subdivision
16
Gardner-Ahlquist Gateway Subdivision