Loading...
HomeMy WebLinkAboutLandscape Plan 244'-0" um SITE GENERAL NOTES 1. ALL SITE WORK SHALL BE COORDINATED WITH CIVIL DOCUMENTS. ANY DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT i� _ - AND CIVIL ENGINEER FOR RESOLUTION. NO WORK SHALL BE , I PREFORMED ON THE CONTRADICTORY INFORMATION OR ANY - ,� _ _ __ - � � EXISTING CONDITION NOT IN CONFORMANCE WITH THE VEHICULAR CONNECTION TO ADJACENT SITE CONSTRUCTION DOCUMENTS WITHOUT FIRST CONSULTING THE �, �, ARCHITECT AND ENGINEER. 4 2 COORDINATE ALL LANDSCAPING PARKING STRIPS ND N SIDEWALKS SHOWN WITH LANDSCAPE DRAWINGS A • • / ,,,� ,,,..., �_� OPEN SPACE 1 3. CONTRACTOR IS RESPONSIBLE FOR RELOCATION OF DRY . :__ •- ..-r I.+*►� r --� ._ --__ w ��� UTILITIES. CONTRACTOR TO WORK WITH UTILITY PROVIDER, IE: ,DOG PARK FIBER OPTICS, CABLE CO., FOR RELOCATION OF SHORING, z WATER FEATURE MAINTENANCE OR REPAIR OF ALL EXISTING UTILITIES. REFER TO -- o CIVIL AND MECHANICAL DRAWINGS FOR WET UTILITIES. w 4. FOR SIDEWALK AND PAVING FINISH GRADES, COORDINATE WITH w O _ ARCHITECTURAL, CIVIL AND LANDSCAPE DRAWINGS. _ 5. SEE SITE ELECTRICAL PLANS FOR ALL SITE LIGHTING/POST U' �! ; - w 109'-0" LIGHTS. ARCHITECT AND LANDSCAPE TO VERIFY FINAL Q LOCATIONS. LIJ �. . CLu - ;,=�-;/ T hf o SHEET NOTES , ,: ,:: ,: " t •.' �- ' y -ZONING: CURRENRT ZONING FOR THE FOLLOWING PARCELS ARE 'C-C' (COMMUNITY BUSINESS), WE ARE PROPOSING TO CHNAGE THE ZONING FROM A'C-C'TO'R-40' (HIGH DENSITY RESIDENTIAL)WITH THE APPROVAL OF A CONDITIONAL USE PERMIT. LANDSCAPEING ANALYSIS - - STREET TREE COUNT 18 BIKE PARKING TOTAL TREE COUNT 43 UNITS: BACH HOMES e• - .:j _ J !!R�' . ` '"• -`1 ��' _ ' 20 STUDIOS 480.5 SQFT 11650 South State Street, Q 44 (1) BEDROOM 646 SQFT Suite 300 24 (2) BEDROOM 958 SQFT Draper,UT 84020 NOTE: ,, p 80 7 7- 500 - PHASE 1 AND 2 HAVE BEEN COMPLETED IN PREVIOUS z PARKING REQUIREMENTS: www.bachhomes.net PROJECTS, WE ARE PROPOSING TO BUILD PHASE O 1/STUDIO 20 STALLS COPYRIGHT 2021 BACH HOMES THREE. F- T T 1.5/(1) BED 66 STALLS THIS PLAN IS THE PROPERTY OF BACH 2/(2) BED 48 STALLS HOMES AND SHALL NOT BE DUPLICATED OR U 1/10 DWELLING UNITS 9 STALLS USED AS THE BASIS FOR ANY NEW PLANS. A/ w TOTAL 143STALLS Q 00 �� �� BICYCLE PARKING REQUIREMENT: Civil: = PEDESTRIAN CONNECTION TO ADJACENT SITECivil QCOVERED PARKING 1/25 PROVIDED STALLS Civil Address r U a- COVERED PARKING REQUIREMENT Civil Phone w Of =' bo, i U Ll = 1 PER 1 OR 2 BED UNIT 68 STALLS m m „-n awi iv 5'-0" 9'-0�� PROVIDED PARKING: Landscape: �-' v TYP. 143 STALLS Landscape Designer z w o O VEHICU AR CONNECTION TO ADJACENT SITE 68 COVERED Landscape Address O 2 COVERED ADA STALLS Landscape Phone N O 2 ADDITIONAL ADA STALLS m o 38'-5 5/8" 32' -0 1/2" _ _ 8 BICYCLE PARKING SPACES 5'-0" o 0 Fb PERCENT OF PARKING AREA WITH INTERNAL LANDSCAPING \V N N 52.78% Structural: 4001 Structural Engineer OPEN SPACE REQUIREMENTS: Structural Address UNITS 500 SQFT OR LESS = 150/UNIT Structural Phone UNITS 500- 1,200 SQFT= 250/UNIT 150 x 20 = 3,000 SQFT 250 x 68 = 17,000 SQFT 10,-0" O TOTAL REQUIRED = 20,000 SQFT MEP Address MEP Engineer 11 1/2' 19'-0" OPEN SPACE PROVIDED: MEP Phone STREET BUFFER LANDSCAPE BUFFER o a OPEN SPACE 1 = 7,342 SQFT OPEN SPACE 2 = 6,220 SQFT N J OPEN SPACE 3 = 1,893 SQFT (wj Z Z OPEN SPACE 4 = 50% OF 12,592 SQFT= 6,296 a TOTAL PROVIDED = 21,751 SQFT CO z zY a a � A/ a Q O w w 80 SQFTPRIVATE OPEN SPACE REQUIREMENT: w O � Lu > > PRIVATE OPEN SPACE PROVIDED: P 1,OPOSED SCREENING C� 0 80 SQFT/UNIT (GREY REGION) U) o SITE AMENITIES REQUIRED: L o w w o GREATER THAN 75 UNITS REQUIRES2 coi Q coo CD 0 4 FROM 4 DIFFERENT CATEGORIES O LU 1.2 w � = o LU U) CO C° A. QUALITY OF LIFE - DOG PARK = }' z THE REGENCY B. OPEN SPACE-WATER FEATURE w d C. RECREATION -WALKING TRAIL = m o ^ O PARTM E NT COMPLEX D. MULTI-MODAL AMENITY- CAR CHARGING U N � CAR CHARGING (E) m STATIONS \ 1 (.0 0 5'-0" z z � 000000° a a d 26'-0" w 25'- 0" w — I 1 O O 11'-6"� o CM > � � � � _ PEDESTRIAN CONNECTION TO ADJACENT SITE LU L BIKE PARKING U) III: o o Qw MI , I..L M p pl �M CIO rw Z -0 J o �-0 J co -0 C O O 19'- 0" Q co TYP. I N M W •L w w > EXITING BUILDING > CD a z z co z MATTRESS FIRM w Y Y Z Y o ao w E Q I o I N > > > TRASH ENCLOSURE O O O PROJECT NUMBER: 21.01 DRAWN BY: ABD DRAWING DATE: 04/09/2026 19'-6" o (D CURRENT REVISION: 19'-0" 19'-01, Zh 19'-0" NO EOMD D D U NREVISION SCHEDULE W0 PEDESTRIAN CONNECTION TO ADJACENT SITE O ry N N F VEHICULAR CONNECTION TO ADJACENT SITE 0 C'M I Z 0 O 0 U) 26'-0" 0 23'-6 7/8" 25'-0" 23'-0 3/8" 22'-9 7/8" EXISTING PARKING LO 0 VEHICULAR CONNECTION TO PUBLIC RIGHT OF WAY ND SIDE WALK/ 6'-6 1/211 27 -0 0 N • DATE 6'-0" 30'-0" N COVERED PARKING z C) N 0 Q J 0 0 0 0 M LL 0 0 0 N 000000000 W Q 75 U o LO C10 Q Q L0 I � J CYi EAST RIVER VALLEY ST. — PEDESTRIAN CONNECTION TO PUBLIC RIGHT OF WAY 30'-6" N OVERALL LANDSCAPING PLAN SCALE: 1"=20'-0" 20'-0" 0" 10'-0" 20'-0" 40'- 0" N O U