HomeMy WebLinkAboutLandscape Plan 244'-0"
um SITE GENERAL NOTES
1. ALL SITE WORK SHALL BE COORDINATED WITH CIVIL DOCUMENTS.
ANY DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT
i�
_ - AND CIVIL ENGINEER FOR RESOLUTION. NO WORK SHALL BE
, I
PREFORMED ON THE CONTRADICTORY INFORMATION OR ANY
- ,� _ _ __ - � � EXISTING CONDITION NOT IN CONFORMANCE WITH THE
VEHICULAR CONNECTION TO ADJACENT SITE
CONSTRUCTION DOCUMENTS WITHOUT FIRST CONSULTING THE
�, �, ARCHITECT AND ENGINEER.
4 2 COORDINATE ALL LANDSCAPING PARKING STRIPS ND
N SIDEWALKS SHOWN WITH LANDSCAPE DRAWINGS A
• • / ,,,� ,,,..., �_� OPEN SPACE 1 3. CONTRACTOR IS RESPONSIBLE FOR RELOCATION OF DRY
. :__ •- ..-r I.+*►� r --� ._ --__ w ��� UTILITIES. CONTRACTOR TO WORK WITH UTILITY PROVIDER, IE:
,DOG PARK FIBER OPTICS, CABLE CO., FOR RELOCATION OF SHORING,
z WATER FEATURE MAINTENANCE OR REPAIR OF ALL EXISTING UTILITIES. REFER TO
-- o CIVIL AND MECHANICAL DRAWINGS FOR WET UTILITIES.
w
4. FOR SIDEWALK AND PAVING FINISH GRADES, COORDINATE WITH
w O _ ARCHITECTURAL, CIVIL AND LANDSCAPE DRAWINGS.
_ 5. SEE SITE ELECTRICAL PLANS FOR ALL SITE LIGHTING/POST
U' �! ; - w 109'-0" LIGHTS. ARCHITECT AND LANDSCAPE TO VERIFY FINAL
Q LOCATIONS.
LIJ
�. . CLu
-
;,=�-;/ T hf o SHEET NOTES
, ,: ,:: ,: " t •.' �- ' y -ZONING: CURRENRT ZONING FOR THE FOLLOWING PARCELS ARE
'C-C' (COMMUNITY BUSINESS), WE ARE PROPOSING TO CHNAGE THE
ZONING FROM A'C-C'TO'R-40' (HIGH DENSITY RESIDENTIAL)WITH
THE APPROVAL OF A CONDITIONAL USE PERMIT.
LANDSCAPEING ANALYSIS
- - STREET TREE COUNT 18
BIKE PARKING
TOTAL TREE COUNT 43
UNITS: BACH HOMES
e• - .:j _ J
!!R�' . ` '"• -`1 ��' _ ' 20 STUDIOS 480.5 SQFT 11650 South State Street,
Q 44 (1) BEDROOM 646 SQFT Suite 300
24 (2) BEDROOM 958 SQFT Draper,UT 84020
NOTE: ,, p
80 7 7- 500
- PHASE 1 AND 2 HAVE BEEN COMPLETED IN PREVIOUS z PARKING REQUIREMENTS: www.bachhomes.net
PROJECTS, WE ARE PROPOSING TO BUILD PHASE O 1/STUDIO 20 STALLS
COPYRIGHT 2021 BACH HOMES
THREE. F- T T 1.5/(1) BED 66 STALLS THIS PLAN IS THE PROPERTY OF BACH
2/(2) BED 48 STALLS HOMES AND SHALL NOT BE DUPLICATED OR
U 1/10 DWELLING UNITS 9 STALLS USED AS THE BASIS FOR ANY NEW PLANS.
A/ w TOTAL 143STALLS
Q 00 �� �� BICYCLE PARKING REQUIREMENT: Civil:
= PEDESTRIAN CONNECTION TO ADJACENT SITECivil
QCOVERED PARKING 1/25 PROVIDED STALLS Civil Address r
U a- COVERED PARKING REQUIREMENT Civil Phone
w Of =' bo, i U Ll = 1 PER 1 OR 2 BED UNIT 68 STALLS
m m
„-n awi iv 5'-0" 9'-0�� PROVIDED PARKING: Landscape:
�-' v TYP.
143 STALLS Landscape Designer
z w o O VEHICU AR CONNECTION TO ADJACENT SITE 68 COVERED Landscape Address
O 2 COVERED ADA STALLS Landscape Phone
N O 2 ADDITIONAL ADA STALLS
m o
38'-5 5/8" 32' -0 1/2" _ _ 8 BICYCLE PARKING SPACES
5'-0" o 0
Fb PERCENT OF PARKING AREA WITH INTERNAL LANDSCAPING
\V N N 52.78% Structural:
4001 Structural Engineer
OPEN SPACE REQUIREMENTS: Structural Address
UNITS 500 SQFT OR LESS = 150/UNIT Structural Phone
UNITS 500- 1,200 SQFT= 250/UNIT
150 x 20 = 3,000 SQFT
250 x 68 = 17,000 SQFT
10,-0" O TOTAL REQUIRED = 20,000 SQFT MEP Address
MEP Engineer
11 1/2' 19'-0" OPEN SPACE PROVIDED: MEP Phone
STREET BUFFER LANDSCAPE BUFFER o a OPEN SPACE 1 = 7,342 SQFT
OPEN SPACE 2 = 6,220 SQFT
N J OPEN SPACE 3 = 1,893 SQFT
(wj Z Z OPEN SPACE 4 = 50% OF 12,592 SQFT= 6,296
a TOTAL PROVIDED = 21,751 SQFT
CO z
zY a a
� A/ a Q O w w 80 SQFTPRIVATE OPEN SPACE REQUIREMENT:
w O �
Lu
> > PRIVATE OPEN SPACE PROVIDED:
P 1,OPOSED SCREENING C� 0 80 SQFT/UNIT
(GREY REGION) U)
o SITE AMENITIES REQUIRED: L o
w w o GREATER THAN 75 UNITS REQUIRES2 coi
Q coo CD 0 4 FROM 4 DIFFERENT CATEGORIES O LU 1.2
w � = o LU
U) CO C° A. QUALITY OF LIFE - DOG PARK =
}' z THE REGENCY B. OPEN SPACE-WATER FEATURE w
d C. RECREATION -WALKING TRAIL = m o
^ O PARTM E NT COMPLEX D. MULTI-MODAL AMENITY- CAR CHARGING U
N
� CAR CHARGING (E) m
STATIONS
\ 1
(.0 0
5'-0" z z
� 000000° a a
d 26'-0" w 25'- 0" w
— I 1 O O
11'-6"�
o CM
> � � � � _ PEDESTRIAN CONNECTION TO ADJACENT SITE LU
L BIKE PARKING U)
III:
o o Qw MI ,
I..L M p pl
�M
CIO
rw Z -0
J o �-0
J co -0 C
O
O 19'- 0" Q co
TYP.
I
N M W
•L w w >
EXITING BUILDING > CD a
z z co z
MATTRESS FIRM w Y Y Z Y o
ao w
E Q I o I N
> > >
TRASH ENCLOSURE
O O O PROJECT NUMBER: 21.01
DRAWN BY: ABD
DRAWING DATE: 04/09/2026
19'-6" o (D CURRENT REVISION:
19'-0" 19'-01, Zh 19'-0" NO
EOMD D D U NREVISION SCHEDULE
W0 PEDESTRIAN CONNECTION TO ADJACENT SITE O ry N N
F VEHICULAR CONNECTION TO ADJACENT SITE 0
C'M I Z 0
O 0
U) 26'-0" 0 23'-6 7/8" 25'-0" 23'-0 3/8" 22'-9 7/8"
EXISTING PARKING LO 0 VEHICULAR CONNECTION TO PUBLIC RIGHT OF WAY
ND SIDE WALK/ 6'-6 1/211 27 -0
0 N • DATE
6'-0" 30'-0"
N COVERED PARKING z
C) N
0 Q
J
0 0 0 0 M LL
0 0 0 N
000000000 W Q
75
U
o
LO
C10 Q Q
L0 I � J
CYi EAST RIVER VALLEY ST. —
PEDESTRIAN CONNECTION TO PUBLIC RIGHT OF WAY
30'-6"
N
OVERALL LANDSCAPING PLAN
SCALE: 1"=20'-0"
20'-0"
0" 10'-0" 20'-0" 40'- 0" N O
U