MEMORANDUM
May 21, 2026
To: Planning and Zoning Commission
From: Bill Parsons, Current Planning Supervisor
Re: Ustick Commercial/McUstick Subdivision—H-2025-0059 and H-2026-0007
On May 7, 2026, the Planning and Zoning Commission continued the Ustick
Commercial/McUstick Subdivision project to the May 28, 2026 hearing. The continuance was
required to allow this project to be discussed during the same hearing as the Durango
Subdivision and bring forward draft conditions of approval for the Commission's consideration.
Below are the draft conditions of approval that staff believes are most relevant to the subject
application should the Commission recommend approval. Staff has also identified additional
considerations for the Commission to evaluate during deliberations on the application.
Further, the applicant has provided exhibits demonstrating how the proposed commercial
development is intended to transition and integrate with the proposed residential development
known as Durango Subdivision(see attachments below).
Draft Conditions of Approval
A. Meridian Planning Division
1. A Development Agreement(DA) is required as a provision of annexation of this
property. Prior to approval of the annexation ordinance, a DA shall be entered into
between the City of Meridian, the property owner(s) at the time of annexation
ordinance adoption, and the developer.
A fee for the DA shall be paid by the Applicant to the Planning Division prior to
commencement of the DA. The DA shall be signed by the property owner and
returned to the Planning Division within six(6) months of the date of City Council
approval of the Findings of Fact, Conclusions of Law and Decision & Order for the
Annexation request. The DA shall, at minimum, incorporate the following provisions:
i. Future development of this site shall be generally consistent with the conceptual
development plan and building elevations,preliminary plat, landscape plan, and
buffer exhibits included below in Section VII and the provisions contained herein.
ii. The final design of all structures shall comply with the design standards in the
Architectural Standards Manual (ASM).
iii. The development is subject to the Oaks lift station&West Ada School District
reimbursement agreements.
Page 12
iv. The site design shall comply with the site design standards in UDC 11-3A-
19.B.2b, which require a minimum of thirty (30)percent of the buildable frontage
of the property to be occupied by building facades and/or public space.
v. Business hours of operation in the C-C zoning district shall be limited from 6:00
am to 11:00 pm when the property abuts a residential use or district as set forth in
UDC 11-2B-3B. Extended hours of operation may be requested through a
conditional use permit.
vi. Access to W. Ustick Rd is prohibited in accord with UDC 11-3A-3.
vii.Any future development of the site must comply with the City of Meridian
ordinances in effect at the time of the development.
2. The final plat(s) shall include the following revisions:
i. Depict cross-access/ingress-egress easements between all lots in the subdivision
and to adjoining properties either by recorded easement or as a note on the final
plat asset forth in UDC 11-3A-3A.2.
ii. Depict a minimum 20-foot wide drive aisle connection with pedestrian facilities
on each side to the property to the north.
3. The landscape plan submitted with the final plat application(s) shall include the
following revisions:
i. Where pedestrian pathways are proposed from perimeter sidewalks to the main
building entrances, pathways shall be distinguished from vehicular driving
surfaces through the use of pavers, colored or scored concrete, or bricks, per UDC
11-3A-19B.4b.
ii. Lawn and other grasses requiring regular mowing shall comprise no more than
sixty-five (65)percent of the vegetated coverage of a landscape (street)buffer per
UDC 11-3B-7C.3e; calculations or a note demonstrating compliance should be
included on the plan.
iii. Mitigation information shall be included for all existing trees four-inch caliper or
greater that are removed from the site as set forth in UDC 11-3B-10.
iv. Depict a 25-foot-wide buffer to adjoining residential land uses with landscaping
per the standards in UDC 11-3B-9C.
4. Additional design features consisting of a dry creek bed with river rock and boulders
shall be included in the street buffer along W. Ustick Rd., an entryway corridor, as
proposed, in accord with UDC 11-3B-7C.3f.
5. A public use easement shall be submitted for all multi-use pathways/sidewalks
located outside of the adjacent ACHD right-of-way, as required by the Park's Dept.
6. Staff s failure to cite all relevant UDC requirements does not relieve the applicant
from compliance.
7. A Certificate of Zoning Compliance and Design Review application shall be
submitted for the commercial development and approved by the Planning Division
prior to submittal of application(s) for building permits.
8. The preliminary plat approval shall become null and void if the applicant fails to
either: 1) obtain the City Engineer's signature on a final plat within two years of the
date of the approved findings; or obtain approval of a time extension as set forth in
UDC 11-6B-7.
Ph:208.884.5533 • www.meridiancity.orq
Rev:01/2011
Page 13
Other Considerations for the Commission
1. Draft Condition of Approval 2.ii above requires a northern vehicular connection to the
Durango Subdivision in lieu of pedestrian connectivity only. The applicant believes
adequate access is already being provided to the commercial property without the
addition of the northern vehicular connection. The condition should be removed if the
Commission finds additional vehicular connectivity is warranted.
2. DA provision v. restricts the operating hours between 6 am and 11 pm unless otherwise
approved by a CUP. The applicant has indicated the future tenant of Lot 1, Block 1
operates 24 hours a day, 7 days a week. The applicant is requesting that the Commission
allow a 24 hour use on said lot because the property isn't currently adjacent to a
residential use/district. This DA provision should be modified if Commission supports
the 24hr operation.
3. The applicant is requesting that the Commission allow one building permit to be issued
for the site prior to recording the plat. The applicant would like the ability to begin site
work and prepare the property for development prior to recording the final plat. A new
DA provision should be added if this request is supported by the Commission.
Landscape Buffer Exhibits
lit
LLJ
� q
f
nI COMMERCIAL TO RESIDENTIAL BUFFER 11 HIBIT
°� lar
I;M `
Ph:208.884.5533 • www.meridiancity.orq
Rev:01/2011
Page i4
-------------------- -------
{{
�(\GOMMERCVLL TO RESIUENUAL BUFFER
III w a
A _
T II
—I llr J I I
II
A[OMMERCN L TORESIDENTIAL[ROSS=ON as mo xos�nw ow ws
MCSTICI(SIIBOINSION
MERIOIAN,IOAHO Q�km
COMMERCIALT� NUA�PERATION L L��m �� III II�� ,f(— J Ilr J IL.Ik „LL,��I�— �'
Bxrs ORESIUE �LL
Ph:208.884.5533 • www.meridiancity.orq
Rev:O1/2011