HomeMy WebLinkAboutCC - Storm Drainage Calcs DRAINAGE CALCULATIONS FOR TANNER CREEK SUBDIVISION N0.1 MERIDIAN, IDAHO November 5, 2024 ENGINEERING SOLUTIONS, LLP 1029 N. Rosario Street, Suite 100 Meridian, Idaho 83642 (208) 938 -0980 ��5g10NAL FN 0 ENSFo C� 20305 A l OF 10PP�� H. M Job Number: 231201 Areas 1, IA and 2 will be picked up in drop inlets and piped into three 1000 - gallon sand and grease traps. Areas 3 and 4 will be picked up in drop inlets and piped into a manhole. From the manhole it is piped to the sand and grease traps where it splits into three pipes to the seepage bed. Three 18" PVC pipes goes 5' into seepage bed 1.1. Three 18" top only perforated pipes extend through the seepage bed. The seepage bed has 1.5' of filter sand below it. The seepage bed is designed to have 3' of separation from high groundwater. Areas 5 and 6 will be picked up in drop inlets and piped into a 1000 - gallon sand and grease trap. An 18"pipe from the sand and grease trap goes 5' into seepage bed 1.2. An 18" top only perforated pipe extends through the seepage bed. The seepage bed has 1.5' of filter sand below it. The seepage bed is designed to have 3' of separation from high groundwater. Areas 7, 8 and 8A will be picked up in drop inlets and piped into two 1000 - gallon sand and grease traps. Areas 9 and 10 will be picked up in future drop inlets and piped into the sand and grease traps. Two 18" PVC pipes go 5' into seepage bed 1.3. Two 18" top only perforated pipes extend through the seepage bed. The seepage bed has 1.5' of filter sand below it. The seepage bed is designed to have 3' of separation from high groundwater (groundwater was not encountered). Areas 11 and 12 will be picked up in drop inlets and piped into a 1000 - gallon sand and grease trap. An 18" PVC pipe goes 5' into seepage bed 1.4. An 18" top only perforated pipe extends through the seepage bed. The seepage bed has 1.5' of filter sand below it. The seepage bed is designed to have 3' of separation from high groundwater (groundwater was not encountered). Seepage Beds The seepage beds are sized for the 100-year storm per ACHD Stormwater Design Spreadsheet. The seepage beds use clean drain rock wrapped in filter fabric to facilitate drainage, top half perforated pipes, perforated pipes and 1.5' of sand underneath the clean drain rock. The seepage beds also contain a monitoring well inside the beds and one outside the beds. The seepage beds were sized using a percolation rate of 1"/hr through the bottom of the beds. The seepage bed drains 90% of the 100-year storm within 48 hours. The beds were designed to have a minimum of 3' of separation from high groundwater based on the geotechnical report provided by Atlas Technical Consultants, LLC. �> z N g o O $ I I 1 I' I iiciiiiiiiii ,��^N,g$mu� �m o : VO?o w V U �j gg yy 3g Quo Z Q w V Z Z W z ttpp m W 'i N O N P v� $o N �n c� A y m>>1 y s eroo aI c3 o� s�� �o S o dim oo 00000� o00 oo aVj = I ayy��� '",yob soy d n all rn1 u ci ou ou s e''"�oo ov v$o �AvYn S"av vSv �3dd gg I p! d c o d o d d 3p �00000u ooGo o or �ee n� 68odC90 C7 �� - . Zit&L, a o d 6 o m w 91 � 3 i Sm �vIr 3StlHd 3Hfllna e°R 3SVHd 3arun-4 ! —L_I J �L—IT L!7 l f_I n II V� TTTT'T'T— TT1--p\\ DI I 01 III - m FFFR IIII - j6 W �n I $$ F I CD LU l -' z •' � $�—L L J 00f6 � I l vrmnu �l— TTJIL �T I-----� _01 m- 01 8 o1 a I W I I U I W-------$ I O -s Iry ma x x 1 Mll 19l 61 N O O N O O ee w M O 1) M N CO 1) 1l- LO O) r- N 'r CO (O M M O _ Lo _ (O M N LO N C,) _ 1- C) r- p O O p 0 V t` W CD r M Cl) N (O I� O M M 11 I I I I I I I I I N V M O r 0 M O M M N Cl) r N N V' (O 7 O O to cn y w 0 N M r- V N M O O Cl) N �O NLo M) LO M N 1- V (O �Ce) CO N O 1- M 0) 0) LO c0 R V O Ln M N V 1` V (O (O N 0) V O LO O 3 d co I- N NLO N N r O r co M C� CJ 3 r V N N >c0 (II O O O IO rO �O O O O O O O II II II II II II d U U U U U U (.) co M N CO W O � OMD M rO I� r oo � V ( Ce) N N N 0) � N > r N N N M r N O CO O V M In r LU 7 7 O 7 7 7 V Q Q Q Q Q Q Q W V' N Q N co CD O Z M N ON N Q V r k r- k " N r (O u-) 00 (O CO (O vO 1- u-) co O V LO r N k k k (p CJ y w N (O V (O CO (O (O M O V (O (O 0 0 LO O f� O Q co co N V M O O D V r O N O r 0 LO O N N (1) Q a' Q Q Q Q Q to O IN N > > co> > > # # k M M I- V co OD u-) O V co 1l- co V co V aD N CM M ;rM r N V M O N M CO M (O CO (O O N 0 0 0 Cl) r 0 O r 6 (M O r M V �- V { CO V O co LO N N (O N w CM CO r N V O (O V V t0 N N N CO (O N V O O O O O r O O O O O O O O r O O O X V N 1` N N JI 0 Cl) 00 00 00 00 co W W 00 N CO W 00 LO (O LO (O 00 OD OD (O 10 CO OO (O 10 U? U m (9 m O O O O O J J J (O O N N N M N Q Q Q E E E T T T LL LL LL E E E N r-- LOO U') N 0) r- V r U') co M V N m N V N r (O 11- V V N N N V r N N N r CM 0) 0) N LL LL LL CD CD m _ _ ( C C C_ 7 7 n 0Cn O O O (O (O (O O O O O O O II It II II II II U U U U U U NM U-) CO LO N O co N C' N O mU') N Co C) M _ V LO CO UO LO V V V V U? V (O V V V V (O V N N N N N N 0 0 0 0 0 O O O O 0 0 0 O O O O O O E E E E E E V fA N N N C7b Q Q Q Q Q Q O V M O O M r (O co M V O CO r 'IT 'IT CID J O Lq O � U� 1-- C O V r r I_ M O N N I_: 1` r 0 I� O O 10 LL 10 U 0 L 0 0 N r N N r N N N N N r N Y p 0 II II it W IN N O N N a a 0 ( Lu cJ cJ cJ I- 0) U) CO CO N (O 00 CO CO 1- O 1- CO C) CD CO N _ V10 N (Y) -S (O O N N V V O CO V (O M N Cfl CO Q r 0 00 V - 0 O r O r 0 (O N (00 (O 0 N II O U U U o r N_ O M N Z N Z c- r r fn O ¢ N M V O O (O a) ^ N a O Z r O Z LL m Z m k k r k Y Z N m CO m m ►a) 0 0) OCPI a) N U (0 (n Q.m cm m 0. C � (n o C R F ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Tanner Creek Areas 1,3A,2,3,&4 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100 4 Enter number of storage facilities(25 max) Click to Show More Subbasins ❑ Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 5 Area of Drainage Subbasin(SF or Acres) Acres 1.57 1.89 0.35 0.53 0.61 Acres 4.95 6 Determine the Weighted Runoff Coefficient(C) 0.50 0.75 0.50 0.50 0.50 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg1 0.60 7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 user Calculate min 10 Min. Estimated Runoff Coefficients for Various Surface Type of Surface Runoff Coefficients"t Business Downtown areas 0.70-0.95 Hydraulic Urban neighborhoods 0.50-0.70 Radius FlowLFlowTime Residential Intercept A/Wet Velocity V Single Family 0.35-0.50 Multi-family 0.60-0.75 ID Pipe Size(in) Slope(ft/ft) Coeff. Length Manning n Perm (fps) Residential(rural) 0.25-0.40 Segment 1:Pipe Flow Apartment Dwelling Areas 0.70 a Industrial and Commercial Light areas 0.80 Segment 2:Gutter Shallow Concentrated Flow Heavy areas 0. 90 Se g Parks,Cemeteries 0.10-0.25 b 0.004 0.619 876 1.3 11.1 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Segment 3:Overland Sheet Flow By TR-55,<300-ft c 0.020 60 0.240 3.9 15.5 Computed Tc= 26.6 User-Entered Tc= 26.6 8 Determine the average rainfall intensity(i)from IDF Curve based on Tc i 1.58 in r y Calculate the Post-Development peak discharge(QPeak) C peak 4.66 cfs 10 Calculate total runoff vol(V)(for sizing primary storage) V 10,187 ft V=Ci(Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm 1(95th percentile=0.60 in) 95th 0.60 in Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) V,r 6,367 ft' 12 Detention:Approved Discharge Rate to Surface Waters(if applicable) cfs 13 Volume Summary Unimproved areas 0.10-0.30 Surface Storage:Basin Streets Basin Forebay V 1,019 ft Asphalt 0.95 Concrete 0.95 Primary Treatment/Storage Basin V 9,168 ft' Brick 0.95 Subsurface Storage Roofs 0.95 Gravel Volume Without Sediment Factor(See BMP 20 Tab) V 10,187 ft' Fields:Sandy soil Soil Soil Type Slope A B C D Flat:0-2% 0.04 0.07 0.11 0. Average:2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE \\ES-1\Projects\2023\231201\Calcs\ACHD_SD_CALCS_Area No.1-1A-2-3-4.xlsm 11/5/2024,2:54 PM Version 10.S,November 2018 ACHD Calculation Sheet for Sand/Grease Traps NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. User input in yellow cells. 1 Project Name Tanner Creek Areas 1,1A,2,3,&4 2 Enter number of Sand/Grease Traps(25 max) 1 Number of Peak Flow Baffle Throat Velocity Is the [71000G Spacing width Area(ft2) 0.5 fps Velocity S/G Traps Q-cfs inch inch max. ok? 3 4.66 20 48 20.00 0.23 Reference for Throat widths(inch) ADS Boise Lar-ken WQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU 1000 n/a n/a 60 WQU 1500 n/a n/a 60 \\ES-1\Projects\2023\231201\Calcs\ACHD_SD_CALCS_Area No.1-1A-2-3-4.x1sm 11/18/2024,2:07 PM Version 10.0, May 2018 ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the"Peak Q,V"tab Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Tanner Creek Areas 1,1A,2,3,&4 2 Enter number of Seepage Beds(25 max) 1 3 Design Storm 100 4 Weighted Runoff Coefficient C 0.60 Link to: Qv 5 Area A(Acres) 4.95 acres QV TR55 6 Approved discharge rate(if applicable) 0.00 cfs lI 7 Is Seepage Bed in Common Lot? Yes V 10,187 ft3 0%Sediment 8 Set Total Design Width of All Drain Rock W 40.0 ft 9 Set Total Design Depth of All Drain Rock D 5.5 ft Rock Only,Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2"drain rock and 3/4"Chips 11 Design Infiltration Rate(8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe(Pert 1801) Dia pipe 18 in 13 Size of Overflow Perf Pipe(Perfs 3601),READ if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 114.8 ft3/ft 15 Calculate Design Length L 89 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 89 ft 17 Variable Infiltration Window W SWW 40.0 ft 18 Time to Drain 3.9 hours 90%volume in 48-hours minimum 19 Length of WQ&Overflow Perf Pipes 89 ft 20 Perf Pipe Checks.Qperf>=Qpeak; where Qperf=CdxAxV(2xgxH) Optional Storage chambers Note:This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume,Without Rock,Per Manuf 45.90 ft'/Unit 6 Chamber Storage Volume,With Rock,Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90%volume in 48-hours minimum \\ES-1\Projects\2023\231201\Calcs\ACHD_SD_CALCS_Area No.1-1A-2-3-4.xlsm 11/5/2024,2:55 PM Version 10.0,May 2018 ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. for Peak` t Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Tanner Creek Areas 5&6 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100 4 Enter number of storage facilities(25 max) Click to Show More Subbasins ❑ Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 5 Area of Drainage Subbasin(SF or Acres) Acres 1.22 0.26 Acres 1.48 6 Determine the Weighted Runoff Coefficient(C) 0.75 0.75 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg1 0.75 7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 User Calculate min 10 Min. Estimated Runoff Coefficients for Various Surface Type of Surface Runoff Coefficients"t Business Downtown areas 0.70-0.95 Hydraulic Urban neighborhoods 0.50-0.70 Radius Flow Residential Intercept A/Wet Velocity V Flow Time Single Family 0.35-0.50 ID Pipe Size(in) Slope(ft/ft) Coeff. Length Manning n Perm (fps) (min) Multi-family 0.60-0.75Residential rural 0.25-0.40 Segment 1:Pipe Flow Apartment Dwelling Areas 0.70 a Industrial and Commercial Light areas 0.80 Segment 2:Gutter Shallow Concentrated Flow Heavy areas 0. 90 Se g Parks,Cemeteries 0.10-0.25 b 0.005 0.619 216 1.5 2.5 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Segment 3:Overland Sheet Flow By TR-55,<300-ft c 0.020 75 0.240 4.1 18.5 Computed Tc= 21.0 User-Entered Tc= 21.0 8 Determine the average rainfall intensity(i)from IDF Curve based on Tc i 1.81 in r y Calculate the Post-Development peak discharge(QPeak) Qpeak 2.01 cfs 10 Calculate total runoff vol(V)(for sizing primary storage) V 3,836 ft V=Ci(Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I(95th percentile=0.60 in) 95th 0.60 in Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) Vrr 2,398 ft, 12 Detention:Approved Discharge Rate to Surface Waters(if applicable) cfs 13 Volume Summary Unimproved areas 0.10-0.30 Surface Storage:Basin Streets Basin Forebay V 384 ft Asphalt 0.95 Concrete 0.95 Primary Treatment/Storage Basin V 3,453 W Brick 0.95 Subsurface Storage Roofs 0.95 Volume Without Sediment Factor(See BMP 20 Tab) V 3,836 ft' Gravel Fields:Sandy soil Soil Soil Type Slope A B C D Flat:0-2% 0.04 0.07 0.11 0. Average:2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE \\ES-1\Projects\2023\231201\Calcs\ACHD_SD_CALCS_Area No.5-6.xlsm 11/5/2024,3:03 PM Version 10.5,November 2018 ACHD Calculation Sheet for Sand/Grease Traps NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Sand/Grease Trap Velocity Calculation User input in yellow cells. 1 Project Name Tanner Creek Areas 5&6 2 Enter number of Sand/Grease Traps(25 max) 1 Number of Peak Flow Baffle Throat Velocity Q0k? Vault Size Spacing width Area(ft2) 0.5 fps V S/G Traps Q-cfs inch inch max. 1000 G 1 2.01 20 48 6.67 0.30 Reference for Throat widths(inch) Boise ADS Vault Lar-ken WQU, BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU 1000 n/a n/a 60 WQU1500 n/a n/a 60 \\ES-1\Projects\2023\231201\Calcs\ACHD_SD_CALCS_Area No.5-6.xlsm 11/5/2024,3:04 PM Version 10.0, May 2018 ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the"Peak QV"tab Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Tanner Creek Areas 5&6 2 Enter number of Seepage Beds(25 max) 1 3 Design Storm 100 4 Weighted Runoff Coefficient C 0.75 Link to: Lav QV TR55 5 Area A(Acres) 1.48 acres 6 Approved discharge rate(if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 3,836 ft 3 0%Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 5.5 ft Rock Only,Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2"drain rock and 3/4"Chips 11 Design Infiltration Rate(8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe(Perf 1800) Dia pipe 18 in 13 Size of Overflow Perf Pipe(Perfs 3601),REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 28.8 ft3/ft 15 Calculate Design Length L 133 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 133 ft 17 Variable Infiltration Window W SWW 10.0 ft 18 Time to Drain 3.9 hours 90%volume in 48-hours minimum 19 Length of WQ&Overflow Perf Pipes 133 ft 20 Perf Pipe Checks.Qperf>=Qpeak; where Qperf=CdxAxV(2x,gxH) Optional Storage Chambers Note:This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume,Without Rock,Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume,With Rock,Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90%volume in 48-hours minimum \\ES-1\Projects\2023\231201\Calcs\ACHD_SD_CALCS_Area No.5-6.xlsm 11/5/2024,3:04 PM Version 10.0,May 2018 ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Tanner Creek Areas 7,8,8A,9&10 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100 4 Enter number of storage facilities(25 max) Click to Show More Subbasins ❑ Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 5 Area of Drainage Subbasin(SF or Acres) Acres 0.43 1.96 0.87 1.40 0.67 Acres 5.33 6 Determine the Weighted Runoff Coefficient(C) 0.75 0.50 0.75 0.75 0.75 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg1 0.66 7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 User Calculate min to Min. Estimated Runoff Coefficients for Various Surface Type of Surface Runoff Coefficients"I Business Downtown areas 0.70-0.95 Hydraulic Urban neighborhoods 0.50-0.70 Radius Flow Residential Intercept A/Wet Velocity V Flow Time single Family 0.35-0.50 ID Pipe Size(in) Slope(ft ft) Coeff. Length Manning n Perm (fps) (min) Multi-family 0.60-0.75 Residential rural 0.25-0.40 Segment 1:Pipe Flow Apartment Dwelling Areas 0.70 a Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Segment 2:Gutter Shallow Concentrated Flow Parks,Cemeteries 0.10-0.25 b 0.005 0.619 915 1.5 10.3 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Segment 3:Overland Sheet Flow By TR-55,<300-ft c 0.020 68 0.240 4.0 17.1 Computed Tc= 27.4 User-Entered Tc= 27.4 8 Determine the average rainfall intensity(i)from IDF Curve based on Tc i 1.58 in r y Calculate the Post-Development peak discharge(QPeak) Qpeak 5.54 cfs 10 Calculate total runoff vol(V)(for sizing primary storage) V 12,122 ft V=Ci(Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm 1(95th percentile=0.60 in) 95th 0.60 in Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) Vrr 7,576 ft' 12 Detention:Approved Discharge Rate to Surface Waters(if applicable) cfs 13 Volume Summary Unimproved areas 0.10-0.30 Surface Storage:Basin Streets Basin Forebay V 1,212 ft' Asphalt 0.95 Concrete 0.95 Primary Treatment/Storage Basin V 10,910 ft' Brick 0.95 Subsurface Storage Roofs 0.95 Volume Without Sediment Factor(See BMP 20 Tab) V 12,122 ft' Gravel 0.75 Fields:Sandy soil Soil Type Slope A B C D Flat:0-2% 0.04 0.07 0.11 0. Average:2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE \\ES-1\Projects\2023\231201\Calcs\ACHD_SD_CALCS_Area No.7-8-8A-9-10.xlsm 11/5/2024,3:05 PM Version 10.5,November 2018 ACHD Calculation Sheet for Sand/Grease Traps NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Sand/Grease Trap Velocity Calculation User input in yellow cells. 1 Project Name Tanner Creek Areas 7,8,8A,9&10 2 Enter number of Sand/Grease Traps(25 max) 1 Number of Peak Flow Baffle Throat Velocity Is the F1000 S/G Traps Q-cfs Spacing width Area(ft2) 0.5 fps Velocity inch inch max. ok? 2 5.54 20 48 13.33 0.42 Reference for Throat widths(inch) ADS Boise Lar-ken WQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 \\ES-1\Projects\2023\231201\Calcs\ACHD_SD_CALCS_Area No.7-8-8A-9-10.xlsm 11/5/2024,3:05 PM Version 10.0, May 2018 ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the"Peak Q,V"tab Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Tanner Creek Areas 7,8,8A,9&10 2 Enter number of Seepage Beds(25 max) 1 3 Design Storm 100 4 Weighted Runoff Coefficient C 0.66 Link to: Qv QV TR55 S Area A(Acres) 5.33 acres 6 Approved discharge rate(if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 12,122 ft, 0%Sediment 8 Set Total Design Width of All Drain Rock W 30.0 ft 9 Set Total Design Depth of All Drain Rock D 3.2 ft Rock Only,Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2"drain rock and 3/4"Chips 11 Design Infiltration Rate(8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe(Pert 1801) Dia pipe 18 in 13 Size of Overflow Perf Pipe(Perfs 3600),READ if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 58.6 ft3/ft 15 Calculate Design Length L 207 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 207 ft 17 Variable Infiltration Window W SWW 30.0 ft 18 Time to Drain 2.6 hours 90%volume in 48-hours minimum 19 Length of WQ&Overflow Perf Pipes 207 ft 20 Perf Pipe Checks.Qperf>=Qpeak; where Qperf=CdxAxV(2xgxH) _-- _ - -__-—- __---- Optional Storage Chambers Note:This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume,Without Rock,Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume,With Rock,Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90%volume in 48-hours minimum \\ES-1\Projects\2023\231201\Calcs\ACHD_SD_CALCS_Area No.7-8-8A-9-10.xlsm 11/5/2024,3:05 PM Version 10.0,May 2018 ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. t thod calculated for post-devefopment Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Tanner Creek Areas 11&12 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100 4 Enter number of storage facilities(25 max) Click to Show More Subbasins ❑ Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 5 Area of Drainage Subbasin(SF or Acres) Acres 1.20 1.66 Acres 2.86 6 Determine the Weighted Runoff Coefficient(C) 0.50 0.75 C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg1 0.65 7 Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 user Calculate min 10 Min. Estimated Runoff Coefficients for Various Surface Type of Surface Runoff Coefficients"I Business Downtown areas 0.70-0.95 Hydraulic Urban neighborhoods 0.50-0.70 Radius FlowLFlowTime Residential Intercept A/Wet Velocity V Single Family 0.35-0.50 Multi-family 0.60-0.75 ID Pipe Size(in) Slope(ft/ft) Coeff. Length Manning n Perm (fps) Residential(rural) 0.25-0.40 Segment 1:Pipe Flow Apartment Dwelling Areas 0.70 a Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Segment 2:Gutter Shallow Concentrated Flow Parks,Cemeteries 0.1010 -0.25 b 0.004 0.619 635 1.3 1 Playgrounds 0.20-0.35 Railroad yard areas 0.20-0.40 Segment 3:Overland Sheet Flow By TR-55,<300-ft c 0.020 68 0.240 4.0 17.1 Computed Tc= 25.4 User-Entered Tc= 25.4 8 Determine the average rainfall intensity(i)from IDF Curve based on Tc i 1.58 in r y Calculate the Post-Development peak discharge(QPeak) Qpeak 2.92 cfs 10 Calculate total runoff vol(V)(for sizing primary storage) V 6,376 ft V=Ci(Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I(95th percentile=0.60 in) 95th 0.60 in Enter Runoff Reduction Vol(95th Percentile=0.60-in x Area x C) Vrr 3,985 ft' 12 Detention:Approved Discharge Rate to Surface Waters(if applicable) cfs 13 Volume Summary Unimproved areas 0.10-0.30 Surface Storage:Basin Streets Basin Forebay V 638 fe Asphalt 0.95 Concrete 0.95 Primary Treatment/Storage Basin V 5,739 ft' Brick 0.95 Subsurface Storage Roofs 0.95 Volume Without Sediment Factor(See BMP 20 Tab) V 6,376 ft' Gravel 0.75 Fields:Sandy soil Soil Type Slope A B C D Flat:0-2% 0.04 0.07 0.11 0. Average:2-6% 0.09 0.12 0.15 0. Steep:>6% 0.13 0.18 0.23 0. Adapted from ASCE \\ES-1\Projects\2023\231201\Calcs\ACHD_SD_CALCS_Area No.11-12.xlsm 11/5/2024,3:06 PM Version 10.5,November 2018 ACHD Calculation Sheet for Sand/Grease Traps NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. User input in yellow cells. 1 Project Name Tanner Creek Areas 11&12 2 Enter number of Sand/Grease Traps(25 max) 1 Number of Peak Flow Baffle Throat Velocity Is the [10 ault Size Spacing width Area(ft2) 0.5 fps Velocity S/G Traps Q-cfs inch inch max. ok? 0 GG 1 2.92 20 48 6.67 0.44 Reference for Throat widths(inch) ADS Boise Lar-ken WQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 \\ES-1\Projects\2023\231201\Calcs\ACHD_SD_CALCS_Area No.11-12.xlsm 11/5/2024,3:06 PM Version 10.0, May 2018 ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the"Peak QV"tab Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Tanner Creek Areas 11&12 2 Enter number of Seepage Beds(25 max) 1 3 Design Storm 100 4 Weighted Runoff Coefficient C 0.65 Link to: LCLV QV TR55 5 Area A(Acres) 2.86 acres 6 Approved discharge rate(if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 6,376 ft3 0%Sediment 8 Set Total Design Width of All Drain Rock W 15.0 ft 9 Set Total Design Depth of All Drain Rock D 4.5 ft Rock Only,Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2"drain rock and 3/4"Chips 11 Design Infiltration Rate(8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe(Pert 1801) Dia pipe 18 in 13 Size of Overflow Perf Pipe(Perfs 3600),REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 37.2 ft3/ft 15 Calculate Design Length L 172 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 172 ft 17 Variable Infiltration Window W SWW 15.0 ft 18 Time to Drain 3.3 hours 90%volume in 48-hours minimum 19 Length of WQ&Overflow Perf Pipes 172 ft 20 Perf Pipe Checks.Qperf>=Qpeak; where Qperf=CdxAxV(2xgxH) Optional Storage Chambers Note:This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume,Without Rock,Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume,With Rock,Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain hours 90%volume in 48-hours minimum \\ES-1\Projects\2023\231201\Calcs\ACHD_SD_CALCS_Area No.11-12.xlsm 11/5/2024,3:07 PM Version 10.0,May 2018 .. Lz_iii. ,L. 6°PIR 6"PIR 6HPIR ...... 62PIR ............j BLOCK 1 ........... °C �•. � 1 • 2 3 4 5 s 7 8 t T.P.#1 T.P.#2 g 1 11 GND=2f5.06 GND=2606.33 A: w GND WTR=2599.86± GND WTR=N/A NOT A PART U `o 1 1.6 Ac. ;f' p '' o W.BROWN TROUT DR. po o TC 10 p TC C) co CID12 TCCD . �TC • d c, c 1 A 36 55 - F ....... ............. UJ 14 U FU ....-....... TI 12 0 0 0 1 t t io Q ... o 0 8 ,� _ 60 30 0 60 120 180 1 - 2 3 4 ::::: s 7 >3 9 a t 't BLOCK w 13 00 13 W SCALE 1N FEET 36 004 1 i T.P.#5.. 2 rrT.P.#4 GND=2606.74 GND=2605.03 GND WTR=N/Acli r ®.6 AC. GND WTR=22595.3± o 4+8 ' >9 d '/�) PUBLIC ALLEY o �' 14 U. U U 4"PIR 15 0 4epIR 4¢P 6 ►R 6°PIR 1 A 1.9 AC. s 15 U U .BLOCK3 2 �- 3 4 5 s 7 8 g LEGEND 1�4 'a0 2 3 35 00 QL DRAINAGE BASIN NUMBER ` T.P.#6 3 t: w'.t GND=2607.08 3 1.4 AC. WITH ACRE AND BASIN I a - TANNER CREEK SUB NO. t t `s GND WTR=NSA BOUNDARY LINE i Y 3 6 16 as 17 ° :. 4 ��-GND 2�6 zsTEST HOLE NUMBER AND ......... .... ° e• d .. - - 4 , .�. e. /�O 0.5 AC. L a W.EIDER DR. o 0 1 26.� GROUND ELEVATION AT T.H. } = ,� '. + .................. -�' + 1--+-- p CV 15 0oTC TIME OF CONCENTRATION 34 00' I a... j•- 5 VALLEY GUTTER V U = C L.� T t t19 STORM DRAINAGE COLLECTION SYSTEM s 17 00 �'C BLOCK 4 V V r I STORM DRAIN BED La U 3 4 I-F- 1 .20 o a s I- 7 .►- p s s B m �, SURFACE FLOW DIRECTION �6 P -- } . - - --- SUBDIVISION BOUNDARY T.P.#9 0.4 AC. a GND=2606.2s 33a0 1 -®.: GND WTR=2596.7s± 7 . 4'PIR - - - - - - - - - - - ......2540 ........ ........ 5 CONTOUR LINE T.P.#12 �.. y L1 1 GND=2607.66 :4"PiR y y �, ND WTR=2599.9± J 2539 CONTOURN ®.... o • �� .° T.P.#11 �� �� T P #14 .o .a GND=2607.07 ob 32+42.39 y GND=2607.33 •- GND WTR=2600�o± W.RU DY DR. '( Q GND WTR=2599.63± a C) F_ 1 BLOCK 7 t 32 0 BLOCK 4 nn T.P.#10 - - - - - - a i GND=2607.10 GND WTR=2597.50± ' FQ F- :-` t t = Tanner Creek No. 1 PEAK FLOW STORM DRAINAGE VOLUME 4°PIR T.P.#13 19 0o I :. =0.501 A Assumes C = 0.50 Single Family V = Area 468 Assumes C = 0.50 Water Quality Storm I = 0.26" GND 2soe. , _ . FUTURE P 6E TANNER � -•- .. 6 -, GND WTR=2597.71± 1 1 I _ - - * - - �e CREEK s �r� swN _.- °.. . I Job No. 231201 C 5=0.50 125A (Assumes C - 0.50) Single Family V2�- Area 1242 (Assumes C - 0.50) 1 - 0.69 0 o W.BACKWO005 DR. oo 'n 19 . o - • �� p 4@PIRCD 1' 27-Feb-24 Q9oo=0.50 11ooA (Assumes C - 0..50) Single Family V10o- Area * 1728 (Assumes C - 0.50) I - 0 96 : : `' p FUTURE PH 6E TANNER : * - - * - 0.75) - . CN ..-•` Q2-0 50 12A (Assumes C 0 75) Multi Family &Alley Load VZ- Area 702 (Assumes C Water Quality Storm 1 0.26" 0 CREEK S DIVISION ®, •\ o ': . QZs 0.5012�A Assumes C - 0.75 Multi Family &Alley Load V2�- Area 1863 Assumes C - 0.75 I - 0.69 .. �. \ 12 8A *Q1oo=0.5O IiooA (Assumes C = 0.75) Multi Family &Alley Load *V,00= Area * 2592 (Assumes C = 0.75) 1 = 0.96 ..13: 00 I 0.9 AC. 1.4 AC. 2 04 _ U .....: . ::. : ''.'. BASIN AREA Tc 1 1 I Q Q Q V V V a. -. :... - a as 70o z 2s 70o a is goo �� NO. acres minutes cfs cfs cfs cubic feet cubic feet cubic feet .° 1+0 �...... U - 1 1.57 26.6 0.42 1.12 1.58 0.33 0.88 1.24 735 1950 2713 3 00 1 A 1.89 14.8 0.59 1.57 2.58 0.84 2.23 3.66 1327 3521 4899 T.P.#17 -° T.P.#18 GND=2608.06 - GND=2608.67 , GND WTR=NSA $ g TANNER CREEK SUB NO. 3_ _GND WTR=N/A ;'-. `I 2 0.35 11.8 0.65 1.75 2.58 0..11 0.31 0.45 164 435 605 .•.. T.P.#19 GND=2608.18 T_4 GND WTR=N/A a .............. 53 . . . . . :=` 4 0.61 17.1 0.55 1.45 2.18 0.17 0.44 0.66 285 758 1054 g� 2 0nf :p- Seepage Bed No. 1-1 C=0.60 4.95 26.6 0.42 1.12 1.58 1.26 3.33 4.66 2759 7322 10187 3 0 1 2a k a •. - !e , 5 1.22 20.3 0.49 1.29 1.81 0.44 1.18 1.66 856 2273 3162 cli 2 00 W 6 0.26 21 0.48 1.27 1.81 0.09 0.25 0.35 183 484 674 S a e Bed No. 1-2 1.48 21 0.48 1.27 1.81 0.53 1.41 2.01 1039 2757 3836 IL .......... 13-00 U ' 1` I� a'` 7 0.43 17.3 0.54 1.44 2.18 0.12 0.31 0.47 201 534 743 9 10 )2 - 2 00 I--I 10 4 o U 8 1.96 27.4 0.42 1.11 1.58 0.41 1.09 1.55 917 2434 3387 -:.. 3 0� . 8A 0.87 10 0.69 1.85 2.58 0.45 1.21 1.68 611 1621 2255 28+ 9.56 . TC = TC U. 1 40 20 6 0.48 1.28 1.81 0.51 1.34 1 90 983 2608 3629 TC 10 0.67 21.1 0.45 1.26 1.81 0.22 0.63 0.91 470 1248 1737 . ' _ -� �.0 p - Seepage Bed No. 1-3 C=.66 5.33 27.4 0.42 1.11 1.58 1.28 3.37 5.54 3742 9930 12122 o Q 15 � o TC � o �\ _ 15+93.40 N C IIIIPE DR. 14 6.03 TC � `v _ 11 1.20 25 4 0.43 1 4 - -- N 562 4 .......... 12 1.66 19.6 0.50 1.32 2.18 0.62 1.64 2.71 1165 3093 4303 . .............. � 1 • Seepage Bed No. 1 4 C-0.65 2.86 25.4 0.43 1.14 1.58 0.61 1.63 2.92 1338 3552 6376 v. . . .•.....- V• •..... .... I- ENGINEER REVISIONS ENGINEER SCALE 1 -60 T.P.#23 T.P.#24 oNAL TANNERCREEK _ ENGINEERING SOLUTIONS LLP S� F� DWG.DATE 11 14 24 GND=2307.65 GND=2609.42 • 5 _ + _ t c/ O�V � I�s�O I GND WTR 25s7.7 i_ ... .. GND WTR N/A Joshua H. Mann, P.E, 1029 N. ROSARIO ST., Ste. 100 a 0 SUBDIViSION NO. 1 PROJ. N®. 231201 GND-2s;;o Ar MERIDIAN, IDAHO 83642 203UTIONSLLP SE 1, SECTION 13, T.4N., RAW., B.M. SHEET 1 OF 1 GND WTR=2602.90± Phone (208) 938-0980 MERIDIAN, ADA COUNTY, IDAHO tp E-Mail: or �`josh m®en m@engsol.org 9 gTE OF�p@'���' 1029 N. ROSA IO STIR., SUITE 100 -•- ......... THIS DRAINING OR FILE CONTAINS INFORMATION OWNED BY ENGINEERING SOLUTIONS,LLP AND WILL y(� MERIDIAN,I®IAN, IDAHO 83642 - - - - T - - - Vi►. DRAINAO-E PLAN BE GOVERNED ONLY BY ENGINEERING SOLUTIONS. THESE CONTENTS MAY NOT BE REPRODUCED OR Phone (208) 938-0980 Fox (208) 938-0941 MAY ONLY BE USED WITH THE PRIOR WRITTEN CONSENT OF ENGINEERING SOLUTIONS,LLP /231201-DRN.DING