Loading...
HomeMy WebLinkAbout2026-05-01 ACHD Miranda Gold,President Alexis Pickering,Vice-President AMI&ACHDKent Goldthorpe,Commissioner Dave McKinney,Commissioner /W — Patricia Nilsson,Commissioner Date: April 29, 2026-DRAFT To: Ethan Mansfield-Hawkins Companies/ Kelly Kehrer, P.E.-KM Engineering/Sonya Allen, Bill Parsons and Brian McClure-City of Meridian Staff Contact: Dawn Battles, Senior Planner Project Description: Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 This is an annexation with rezone from RUT (Rural-Urban Transition) to C-C (Community Business) and a preliminary plat application to allow for the development of a 4-lot commercial subdivision on 4-acres. This application also includes a comprehensive plan map amendment to change the land use designation on the City of Meridian's Future Land Use Map from Medium Density Residential to Commercial. Trip Generation: See findings for consideration 1, page 10 of the report for trip generation, based on the traffic impact study. Proposed Development Traffic Impact Analysis Meets id- All ACHD Policies L RequiresRevisions to meet No ACHD Policies -s, is mitigation • e•u i red Area Roadway Level of ACHD Planned Service Improvements D• area roadways •CHD's LOS Planning Thresholds? • Livable Street Performance Measures Area •.• -- • LOS Planning Thresholds -•- the future with • -• Cyclist • • Available?Is Transit • connecting you to more Ada County Highway District•5800 N Meeker Avenue- Boise,ID•83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org Development Services Department ,--4�' ACHD connecting you to more Project/File: Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 This is an annexation with rezone from RUT (Rural-Urban Transition) to C-C (Community Business) and a preliminary plat application to allow for the development of a 4-lot commercial subdivision on 4-acres. This application also includes a comprehensive plan map amendment to change the land use designation on the City of Meridian's Future Land Use Map from Medium Density Residential to Commercial. This site is located at the northeast corner of Ustick Road and McDermott Bypass. Lead Agency: City of Meridian Site address: 5900 W Ustick Road Staff Approval: XXXX, 202X Applicant: Ethan Mansfield Hawkins Companies 855 W Broad Street Boise, ID 83702 Engineer: Kelly Kehrer, P.E. KM Engineering 5725 N. Discovery Way Boise, ID 83713 Staff Contact: Dawn Battles, Senior Planner Phone: 208-387-6218 E-mail: dbattles(a)achdidaho.org Report Summary: ACHD Planned Improvements............................................2 Level of Service Planning Thresholds.................................2 A. Site Specific Conditions of Approval ............................3 B. Vicinity Map.................................................................4 C. Site Plan......................................................................5 D. Traffic Impact Study—Summary and Findings.............6 E. Findings for Consideration.........................................10 F. Policy.........................................................................13 G. Attachments...............................................................20 H. Standard Conditions of Approval ...............................21 I. Conclusions of Law....................................................21 Request for Appeal of Staff Decision ................................22 1 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 ACHD Planned Improvements 1. Capital Improvements Plan (CIP)/ Five Year Plan (FYP): • Ustick Road is scheduled in the FYP to be widened to 5-lanes from McDermott Bypass to Black Cat Road in 2027. • Ustick Road is scheduled in the FYP to be widened to 5-lanes from Ten Mile Road to Linder Road in 2026. • The intersection of Ustick Road and McDermott Bypass is scheduled in the FYP to be widened to 3-lanes on the north leg, 3-lanes on the south leg, 6-lanes on the east leg, and 6-lanes on the west leg and signalized in 2027. The project includes adding APS (accessible pedestrian signal) with LPI (leading pedestrian interval), pedestrian/bike facilities and intersection lighting. • The intersection of Ustick Road and Owyhee Storm Avenue is scheduled in the FYP as an intersection improvement project to be widened to 3-lanes on the north leg, 6-lanes on the east leg, and 5-lanes on the west leg in 2026. • The intersection of McMillan Road and Black Cat Road is scheduled in the FYP to be constructed as a multi-lane roundabout with 2-lanes on the north bound/southbound legs and 1-lane on the eastbound/westbound legs in 2028. The project includes pedestrian and bike facilities, pedestrian crossings on all legs (RRFB's) and intersection lighting and the reconstruction of bridge #1394 over the Lemp Canal. • Black Cat Road is listed in the CIP to be widened to 5-lanes from Cherry Lane to Ustick Road between 2041 and 2045. • The intersection of Cherry Lane and Black Cat Road is listed in the CIP to be widened to 4- lanes on the north leg, 4-lanes on the south, 4-lanes east, and 4-lanes on the west leg, and signalized between 2031 and 2035. Level of Service Planning Thresholds 1. Condition of Area Roadways Traffic Count is based on Vehicles per hour(VPH) Roadway Frontage Functional PM Peak Hour PM Peak Hour Classification Traffic Count Level of Service Ustick Road 448-feet Principal Arterial 493 Better than "E" McDermott Bypass 363-feet Future Collector N/A ** N/A * Acceptable level of service for a two-lane principal arterial is "E" (690 VPH). ** ACHD does not set level of service thresholds for ITD roadways. 2. Average Daily Traffic Count (VDT) Average daily traffic counts are based on the traffic impact study for Dayspring located on the south side of Ustick Road across from the site. • The average daily traffic count for Ustick Road between McDermott Road and Black Cat Road was 7,032 on May 1, 2024. • There are no existing traffic counts for McDermott Bypass. 2 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 A. Site Specific Conditions of Approval 1. Close the existing 25-foot wide driveway from the site onto Ustick Road located 280-feet east of McDermott Bypass with landscaping and fencing. 2. Dedicate additional right-of-way to total 50-feet from centerline on Ustick Road abutting the site, as proposed. Compensation should be provided. 3. Provide ACHD with a road trust deposit for Ustick Road improvements abutting the site in the amount of $92,400 (17-feet of pavement from centerline, 10-foot wide multi-use pathway and borrow ditch) and should be provided prior to plan approval and ACHD's signature on the first final plat. 4. Provide ACHD with a road trust deposit in the amount of $35,700 for the 95-feet abutting the site on McDermott Bypass prior to plan approval and ACHD's signature on the first final plat. 5. Once McDermott Bypass/Road is under ACHD's jurisdiction, construct the remaining 269-feet abutting the site to tie into the improvements constructed as part of the intersection project as of a 26-foot wide collector street section with vertical curb, gutter, an 8-foot wide landscape strip and a 10-foot wide multi-use pathway. 6. Dedicate right-of-way to 2-feet behind back of multi-use pathway, or reduce the right-of-way width to 2-feet behind back of curb and provide a permanent right-of-way easement from the right-of-way line to 2-feeet behind multi-use pathway. 7. Plans may be submitted for review and approval; however, permits to work in the right-of-way will not be issued until McDermott Bypass roadway has been accepted by ACHD. 8. If building permits are desired prior to ACHD's acceptance of the McDermott Bypass roadway then ACHD should hold a financial surety for the roadway improvements. The amount of the surety shall be determined by ACHD as part of the plan review process. 9. If ITD does not allow a driveway to be constructed onto McDermott Bypass, then once ACHD accepts the roadway as ACHD public right-of-way, construct a 25-foot wide curb return type driveway, as proposed, onto McDermott Bypass located 380-feet north of Ustick Road. 10. Direct lot access is prohibited to Ustick Road and other than the access specifically approved with this application, direct lot access is prohibited to McDermott Bypass and should be noted on the final plat. 11. If a multi-use pathway is to be constructed within or adjacent to the site, then the design of those facilities shall be consistent with ACHD's Multi-Use Path & Raised Bike Lane Tool Kit. Additional right-of-way dedication may be required at all intersections(streets and driveways)to accommodate setbacks. Contact Development Review with questions prior to plan submittal. 12. Submit civil plans to ACHD Development Services for review and approval. The impact fee assessment will not be released until the civil plans are approved by ACHD. 13. There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. The impact fee assessment will not be released until the civil plans are approved by ACHD. 14. Comply with all Standard Conditions of Approval. 3 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 B. Vicinity Map T, �., i' 6 G - V 2: w-usuck.ea I C n3 G'. A: S' - . 1_ I6YiiVli � _ w 4 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 C. Site Plan yr„ P 1 1 1 �lys.ewooaoa — 1 I-1 I s yyI � x - 5 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 D. Traffic Impact Study - Summary and Findings 1. Traffic Impact Study Kimley-Horn and Associates, Inc. prepared a traffic impact study (TIS)for the proposed 5900 Ustick Road Mixed-Use development. ACHD specifically requested a driveway analysis due to a proposed driveway onto Ustick Road and City of Meridian requested a full traffic study be provided for this project since a comprehensive plan map amendment is proposed to change the future land use map from medium density residential to commercial land uses. Below are comments on the full traffic impact study, comments on the trip generation can be found as findings for consideration 1, and on the proposed driveway onto Ustick Road as findings for consideration 2. An executive summary of the findings as presented by Kimley-Horn can be found under attachments on page 20. ACHD has reviewed the submitted traffic impact study for consistency with ACHD policies and practices and may have additional requirements beyond what is noted in the TIS. Staff comments and recommendations on the submitted traffic impact study can be found below. Becky Drive #"• JV j r• r � � 4 Dayspring Way Project LOC2tl011 = (Proposed Future Road) 00 • Ustick Haad �+ co ' -. a a_ °C Morgan Grove Lane Cd F F (Realignment) INTERSECTION ANO , y 0 DRIVEWAYS ROADWAY SEGMENT 6 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 a. Policy: Mitigation Proposals: Mitigation recommendations shall be provided within the report. At a minimum, for each roadway segment and intersection that does not meet the minimum acceptable level of service planning threshold or v/c ratio, the report must discuss feasible measures to avoid or reduce the impact to the system. To be considered adequate, measures should be specific and feasible. Mitigation may also include: • Revision to the Phasing Plan to coincide with the District's planning Capital Projects. • Reducing the scope and/or scale of the project. Alternative Mitigation Measures: 7106.7.3 states that if traditional mitigation measures such as roadway widening and intersection improvements are infeasible as determined by ACHD, the TIS may recommend alternative mitigation measures. Alternative mitigation measures shall demonstrate that impacts from the project will be offset. • If the impacted roadway segments and/or intersections are programmed as funded in the Five Year Plan (FYP) or the Capital Improvements Plan (CIP); no alternative mitigation is required. • If the impacted roadway segments and/or intersections are not programmed in either the FYP or the CIP; the applicant may (i) analyze the shoulder hour, defined as the hour prior to after the determined peak hour within the two-hour peak period, (sometime analyzed as hour before or after peak period) and (ii) provide a safety analysis to determine alternative mitigation requirements. o If the impacted roadway segments and intersections meet the minimum acceptable level of service planning thresholds in the shoulder hour, the applicant may suggest feasible alternative mitigation measures beyond improvements from District policy, such as: off-site sidewalks, off-site bike facilities, connectivity, safety improvements, etc. within 1.5 miles of the proposed development. o If the shoulder hour planning thresholds are exceeded the applicant may request to enter into a Development Agreement and pay into the Priority Corridor Fund an amount determined by the ACHD to offset impacts from the project. • Alternative Mitigation may also include: o Revision to the Phasing Plan to coincide with the District's future Capital Projects. o Reducing the scope and/or scale of the project. Level of Service Planning Thresholds: District Policy 7205.3.1 states that Level of Service Planning Thresholds have been established for principal arterials and minor arterials within ACHD's Capital Improvement Plan and are also listed in section 7106. Unless otherwise required to provide a Traffic Impact Study under section 7106, a proposed development with site traffic less than 10% of the existing downstream roadway or intersection peak hour traffic shall not be required to provide mitigation for a roadway or intersection that currently exceeds the minimum acceptable level of service planning threshold or V/C ratio. b. TIS Findings: Due to the construction of the Ustick Road/SH-16 interchange and the closure of Ustick Road east of the site, an existing conditions analysis was not required, as traffic counts would not provide an accurate representation of existing or future traffic patterns. All study area intersections and roadway segments are expected to operate at an acceptable level of service planning thresholds in the AM/PM peak hours under 2032 background and 2032 total traffic conditions, except for those listed below. 7 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 The recommended mitigation for total traffic conditions (2032) coupled with the percentage of site traffic contributions relative to the PM peak hour under total traffic is shown in parenthesis and staff's recommendations are noted below. Alternate Site Access Evaluation: The traffic impact study provided three alternate access scenarios as follows: Scenario 1 • With Site Access A on Ustick Road located 460-feet east of McDermott Bypass and 470- feet west of Dayspring Way, with Site Access B on McDermott Bypass located 380-feet north of Ustick Road and with Site Access C on Dayspring Way a proposed north/south roadway approved as part of the Durango subdivision located directly adjacent to the east of the site. Scenario 2 • With Site Access B and Site Access C Scenario 3 • With Site Access B Intersections: • Ustick Road/ SH-16 Southbound (1%) and Northbound Ramps (1.5%) There is no recommended mitigation as the interchange is currently under construction. • Ustick Road/Dayspring Way (2%) The recommended mitigation is a signalized intersection with dedicated protected- permissive left-turn lanes on each approach (traffic signal warrants met) or a multi-lane roundabout. Turn Lanes: The traffic impact study recommends turn lanes at the following intersections: • Ustick Road/Site Access A ■ Westbound right-turn lane (without Site Access C) • Ustick Road/ Site Access B ■ Northbound right-turn lane (without Site Access A and C) c. Staff Comments/Recommendations: No mitigation is required at the following intersections and roadway segments as the total site generated traffic entering the intersection under total traffic conditions is estimated to be less than 10% and/or listed as funded improvement in the CIP. This is consistent with ACHD's Level of Service Planning Thresholds (7205.3.1) and Alternative Mitigation (7106.7.3) policies which states that if a proposed development with site traffic less than 10% of the existing downstream roadway or intersection peak hour traffic shall not be required to provide mitigation for a roadway or intersection that currently exceeds the minimum acceptable level of service planning thresholds and that no mitigation is required for roadway segments and intersections if the impacted roadway segments and/or intersections are programmed as funded in the Five Year Plan (FYP)or the Capital Improvements Plan (CIP); no alternative mitigation is required. Intersections: • Ustick Road/ SH-16 Southbound and Northbound Ramps 8 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 • Ustick Road/Dayspring Way The TIS notes that the access analysis with only Site Access B onto McDermott Bypass serving the site would not exceed ACHD's threshold of over 5,000 vehicle trips daily. The study did not demonstrate the need for this driveway intersection and the driveway should not be approved (see finding 3.1 below for additional information). 9 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 E. Findings for Consideration 1. Trip Generation As noted above, this application includes a request to amend the City of Meridian's Future Land Use Map (Comprehensive Plan Map Amendment) from Medium Density Residential (R-8) to Commercial to accommodate the proposed commercial uses within the site. As requested by the City of Merdian, the traffic impact study included trip generation information for the current zoning designation of medium density residential and the proposed zoning designation of commercial. The study assumed that 25 single family dwelling units could be constructed on the 3.16-acre site and the commercial uses included a bank with drive-thru, fast-food restaurant with drive-thru, coffee/donut shop with drive-thru (no indoor seating), and a gas station with 10 fueling positions. WLand Use Type Average Daily Trips PM Peak Hour Trips Residential 467 27 Commercial 3,703 396 Increase in Trips 3,236 369 Percent Increase 693% 1,367% Based on the information provided in the TIS, the change from residential to commercial land uses will increase the trips generated by the development. See excerpt from the study under attachments-page 20. 2. Driveways 2.1 Proposed Driveway on Ustick Road The applicant is requesting approval of the driveway noted above as temporary access, if Site Access C located in the Durango Subdivision is not constructed at the time this development moves forward. The applicant is proposing to construct a right-in/right-out only driveway onto Ustick Road generally located at the midpoint between McDermott Bypass and Dayspring way (460-feet east of McDermott Bypass and 470-feet west of Dayspring Way). Additionally, the applicant is proposing to construct a full access driveway onto the McDermott Bypass to access the site. Ustick Road is classified as a principal arterial roadway. District policy 7205.4.7 Driveway Spacing on Principal Arterials notes the following: • Direct lot or parcel access to a principal arterial is typically prohibited. • If a property has frontage on more than one street, access shall be taken from the street having the lesser functional classification. • Driveways located on arterials may be prohibited when the property has frontage on one or more other public streets. • Located a minimum of 520-feet from a signalized intersection (existing or planned). This site does have frontage on a lesser classified roadway, McDermott Bypass, which will be classified as a collector roadway, therefore direct lot access to Ustick Road is prohibited. 10 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 ACHD policy does provide an opportunity for an applicant to demonstrate the need for a driveway onto a principal arterial roadway. ACHD will consider a driveway on a principal arterial if the following criteria are met consistent with District policy 7205.4.4 Number of Driveways on Arterials. The intent of this policy is to limit the number of access points to those that are warranted or necessary to serve the development, while maintaining the function and performance of the arterial. The guidelines below shall be used when more than one access point is being requested with development. Additional driveways may be considered when one or more of the following conditions are met: • The daily volume using one driveway exceeds 5,000 vehicles (total volume for entering and exiting traffic). • Traffic using one driveway exceeds the volume to capacity ratio (v/c) equal to or greater than 1.0 of a STOP controlled intersection during either the peak hour of the street or the peak hour of the site traffic generation. • A District approved traffic impact study and analysis determines that conditions warrant additional driveways. The submitted traffic impact study (TIS) did not demonstrate a need for a driveway onto Ustick Road. Specifically, the analysis did not meet the applicable warrant criteria, including exceeding 5,000 average daily vehicle trips served by a single driveway or identifying deficient operations based on volume to capacity (v/c) ratios for traffic using a single driveway. Furthermore, the proposed driveway location does not meet the minimum offset from a signalized intersection, this site has access to a lesser classified street, McDermott Bypass, which will be classified as a collector roadway, and additional access will be provided through the development (Durango) located directly adjacent to the east. Based on these findings, one access is sufficient to serve this development with the TIS noting an anticipated 3,703 vehicle trips per day, the proposed driveway onto Ustick Road is not supported and is therefore not approved. 2.2 Existing Driveway on Ustick Road There is an existing driveway onto Ustick Road that the applicant is proposing to close with curb, gutter and sidewalk. However, as explained in Finding 3 below, there is an ACHD project scheduled on Ustick Road abutting the site in 2027. Therefore, improvements will not be constructed abutting the site until the Ustick Road widening project. The applicant should be required to close the existing driveway with landscaping and fencing. 3. Ustick Road a. Existing Conditions: Ustick Road is improved with 2-travel lanes, with 3-travel lanes at the intersection with McDermott Bypass, 24 to 38-feet of pavement and no curb, gutter or sidewalk abutting the site. There is 48-feet of prescriptive right-of-way for Ustick Road (24-feet from centerline). b. Applicant Proposal: The applicant is proposing to improve Ustick Road with 13 to 21-feet of pavement from centerline, vertical curb, gutter, a 5-foot wide landscape strip and 10-foot wide detached concrete sidewalk abutting the site. The applicant is proposing to dedicate additional right-of-way to total 50-feet from centerline on Ustick Road abutting the site. c. Staff Comments/Recommendations: The applicant's proposal exceeds District Frontage Improvements policy which requires Ustick Road to be improved with 17-feet of pavement from centerline, a 3-foot gravel shoulder, borrow ditch and a 10-foot wide multi-use pathway and should not be approved, as proposed. Ustick Road is scheduled in the FYP to be widened to 5-lanes between McDermott Bypass and Black Cat Road in 2027. Therefore, in lieu of improving Ustick Road abutting the site, the applicant should be required to provide ACHD with a road 11 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 trust deposit in the amount of$92,400 (17-feet of pavement from centerline, 10-foot wide multi- use pathway and borrow ditch) and should be provided prior to plan approval and ACHD's signature on the first final plat. The applicant's proposal to dedicate additional right-of-way meets District policy and should be approved as proposed. Compensation should be provided. 4. McDermot Bypass a. Existing Conditions: McDermott Bypass was constructed abutting the site as part of the Idaho Transportation Department's (ITD) State Highway 16 (SH-16) extension project. This roadway was constructed to maintain local access previously provided by McDermott Road, which has been replaced in this area with the extension of SH-16. ITD has constructed the McDermott Bypass abutting this site as a 2-lane rural street section, with 3-lanes at the intersection with Ustick Road, 37 to 43-feet of pavement, gravel shoulders, and no curb, gutter, or sidewalk. Because McDermott Bypass has not been accepted as an ACHD roadway at this time, ACHD has no jurisdiction of this roadway. b. Applicant Proposal: The applicant is proposing to improve McDermott Bypass with vertical curb, gutter, a 5-foot wide landscape strip and 10-foot wide detached concrete sidewalk abutting the site. c. Staff Comments/Recommendations: As noted above, McDermott Bypass is not currently ACHD right-of-way. Additionally, the Ustick Road/McDermott Bypass intersection is scheduled in the FYP to be signalized and pedestrian improvements are to be constructed (see page 2 for details) abutting 95-feet of this site. Therefore, in lieu of improvements abutting 95-feet of the site, the applicant should be required to provide ACHD with a road trust deposit in the amount of$35,700 ('/2 of a 36-foot wide collector street section and 10-foot wide multi-use pathway)and should be provided prior to plan approval and ACHD's signature on the first final plat. Once the roadway is under ACHD's jurisdiction, the applicant should be required to construct the remaining 269-feet of McDermott Bypass abutting the site to tie into the improvements constructed as part of the intersection project as '/2 of a 26-foot wide collector street section with vertical curb, gutter, an 8-foot wide landscape strip and a 10-foot wide multi-use pathway. The applicant should be required to dedicate right-of-way to 2-feet behind back of multi-use pathway, or the applicant may reduce the right-of-way width to 2-feet behind back of curb and provide a permanent right-of-way easement from the right-of-way line to 2-feet behind multi-use pathway. The applicant may submit plans for review and approval; however, permits to work in the right- of-way will not be issued until McDermott Bypass roadway has been accepted by ACHD. If building permits are desired prior to ACHD's acceptance of the roadway then ACHD should hold a financial surety for the roadway improvements abutting the entire frontage. The amount of the surety should be determined by ACHD as part of the plan review process. The applicant is proposing to construct a driveway to intersect the McDermott Bypass roadway. The applicant may need to wait to develop until ACHD accepts the roadway (see Driveway finding 5.1 for requirements). 5. Driveways 5.1 McDermott Bypass a. Existing Conditions: There are no existing driveways from the site onto McDermott Bypass. 12 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 b. Applicant's Proposal: The applicant is proposing to construct a 25-foot wide full access curb return type driveway from the site onto McDermott Bypass located 380-feet north of Ustick Road (measured centerline-to-centerline). c. Staff Comments/Recommendations: The applicant's proposal meets District policy for a full access driveway near a signalized intersection, as it is proposed to be located outside the area of influence of the intersection and should be approved, as proposed. If ITD does not allow the driveway to be constructed, then once ACHD accepts the roadway, the applicant should be required to construct the driveway to intersect McDermott Bypass, as proposed. 6. Other Access Ustick Road is classified as a principal arterial roadway and McDermott Bypass will be classified as a collector street once under the jurisdiction of ACHD. Other than the access specifically approved with this application, direct lot access is prohibited to these roadways and should be noted on the final plat. F. Policy 1. Federal Accessibility Design Guidelines and Standards District policy 7203.1.1 states that developers shall follow the current version of the U.S. Access Board's Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way(PROWAG), 36 CFR Part 1190, September 7, 2023; (Also see, https//www.access-board.gov/prowag and https//www.access-board.gov/files/prowag/planning-and-design-for-alternatives.pdf for additional information). 2. Minor Improvements Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing Highways adjacent to a proposed development may be required. These needed transportation facilities are to correct deficiencies or replace deteriorated facilities. Included are sidewalk and/or bike lane construction or replacement (with physical buffers if missing and needed); construction of transitional sidewalk segments; crosswalk construction or replacement; curb and gutter construction or replacement; repair, replacement or expansion of curb extensions; replacement of unused driveways with curb, gutter, sidewalk, repair or addition of traffic calming or speed mitigation features; installation or reconstruction of pedestrian ramps; pavement repairs; signs, motor vehicle, pedestrian and bicycle traffic control devices; and other similar items. The current version of PROWAG will determine the applicable accessibility requirements for alterations and elements added to existing streets. ACHD staff is responsible for identifying the minor improvements that would be proportionate to the size and complexity of the development. 3. Livable Street Performance Measures District policy 7203.8 states that ACHD has adopted performance measures (level of stress) for evaluating the experience of bicyclists and pedestrians. ACHD seeks to create a transportation network that serves all ages and abilities. Bike and pedestrian facilities built through development should achieve a bike and pedestrian level of traffic stress 1 or 2, with no new bike lane below a minimum of 5-feet. 4. Driveways 4.1 Ustick Road Access Points Policy: District Policy 7205.4.1 states that all access points associated with development applications shall be determined in accordance with the policies in this section and Section 7202. Access points shall be reviewed only for a development application that is being considered by the lead land use agency. Approved access points may be relocated and/or restricted in the future if the land use intensifies, changes, or the property redevelops. 13 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 Number of Driveways on Arterials: District policy 7205.4.4 The intent of this policy is to limit the number of access points to those that are warranted or necessary to serve the development, while maintaining the function and performance of the arterial. The guidelines below shall be used when more than one access point is being requested with a development. Additional driveways may be considered when one or more of the following conditions are met: • The daily volume using one driveway exceeds 5,000 vehicles (total volume for entering and exiting traffic). • Traffic using one driveway exceeds the volume to capacity ratio (v/c) equal to or greater than 1 of a STOP controlled intersection during either the peak hour of the street or the peak hour of the site traffic generation. • A District approved traffic impact study and analysis determines that conditions warrant additional driveways. Access Policy: District policy 7205.4.7 states that direct access to principal arterials is typically prohibited. If a property has frontage on more than one street, access shall be taken from the street having the lesser functional classification. If it is necessary to take access to the higher classified street due to a lack of frontage, the minimum allowable spacing shall be based on Table 1 b under District policy 7205.4.7, unless a waiver for the access point has been approved by the District Commission. Driveways, when approved on a principal arterial shall operate as a right-in/right-out only, and the District will require the construction of a raised median to restrict the left turning movements. Driveway Location Policy: District policy 7205.4.7 requires driveways located on principal arterial roadways to be located a minimum of 520-feet from the nearest intersection for a right-in/right-out only driveway. Full-access driveways are not allowed on principal arterial roadways. Successive Driveways: District policy 7205.4.7 Table 1 b, requires driveways located on principal arterial roadways with a speed limit of 50 MPH to align or offset a minimum of 520-feet from any existing or proposed driveway. Driveway Width Policy: District policy 7205.4.8 restricts high-volume driveways (100 VTD or more)to a maximum width of 36-feet and low-volume driveways (less than 100 VTD)to a maximum width of 30-feet. Curb return type driveways with 30-foot radii will be required for high-volume driveways with 100 VTD or more. Curb return type driveways with 15-foot radii will be required for low-volume driveways with less than 100 VTD. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7205.4.8, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers in accordance with Table 2 under District Policy 7205.4.8. Temporary Access Policy: District Policy 7202.4.2 identifies a temporary access as that which "is permitted for use until appropriate alternative access becomes available". Temporary access may be granted through a development agreement or similar method, and the developer shall be responsible for providing a financial guarantee for the future closure of the driveway. Cross Access Easements/Shared Access Policy: District Policy 7202.4.1 states that cross access utilizes a single vehicular connection that serves two or more adjoining lots or parcels so that the driver does not need to re-enter the public street system. 5. Ustick Road Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for improving all street frontages adjacent to the site regardless of whether or not access is taken to all 14 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 of the adjacent streets. Improvements shall include transitional segments in accordance with the current version of PROWAG. Master Street Map and Typology Policy: District Policy 7205.5 states that the design of improvements for arterials shall be in accordance with District standards, including the Master Street Map, Livable Streets Design Guide, and the most current ACHD Livable Streets Performance Measures Plan as adopted by the ACHD Commission. The developer or engineer should contact the District before starting any design. Street Section and Right-of-Way Width Policy: District Policies 7205.2.1 & 7205.5.2 state The standard 5-lane street section shall be 59-feet (back-of-curb to back-of-curb). This width typically accommodates two travel lanes in each direction, a continuous center left-turn lane or landscaped median with intermittent turn lanes, and curbs and gutters. A 5-lane road shall also include a minimum 10-foot wide multi-use path on both sides with an 8-foot wide buffer from back-of-curb. Other bike facility treatments as defined in the ACHD Bike Master Plan may be approved at the discretion of the ACHD Development Review Supervisor. If an interim on-street bike lane is required in order to connect to existing facilities, the street section shall be 75-feet to allow for a 5-foot wide bike lane and 3-foot wide painted buffer. The standard right-of-way width for a 5-lane arterial is 100- feet. Right-of-Way Dedication: District Policy 7205.2 states that The District will provide compensation for additional right-of-way dedicated beyond the existing right-of-way along arterials listed as impact fee eligible in the adopted Capital Improvements Plan using available impact fee revenue in the Impact Fee Service Area. No compensation will be provided for right-of-way on an arterial that is not listed as impact fee eligible in the Capital Improvements Plan. The District may acquire additional right-of-way beyond the site-related needs to preserve a corridor for future capacity improvements, as provided in Section 7300. Pedestrian Facilities: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide are required on both sides of all arterial streets. A parkway strip at least 8-feet wide between the back- of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Alternatively, on roadways identified for improvement in the Capital Improvement Plan, a minimum 10-foot wide multi-use path may be required. The path shall be placed in accordance with planned buildout in the Master Street Map with a minimum 8-foot wide planter strip as measured to the closest edge of the path. Street trees are encouraged between the pedestrian facility and the roadway when irrigation and maintenance will occur by the adjacent property owner or HOA through an approved license agreement. Consult the District's planter width policy if trees are to be placed within the parkway strip. In some instances, to match existing conditions, a minimum 7-foot wide sidewalk may be constructed next to the back-of-curb. ACHD Development Review staff will be responsible for determining the required facility. Vertical hardscape alternatives to street trees may be considered in the buffer space when street trees are not practicable. Detached sidewalks and multi-use paths are encouraged and should be parallel to the adjacent roadway. Pedestrian facilities will only be allowed to deviate from a straight line parallel to the roadway when authorized by Development Review staff to accommodate site specific conditions (i.e., street trees, utilities, etc.). Appropriate easements shall be provided if public pedestrian facilities are placed out of the right-of- way. The easement shall encompass the entire area between the right-of-way line and 2-feet behind the back edge of the pedestrian facility. Pedestrian facilities shall either be located wholly within the public right-of-way or wholly within an easement. 15 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 Curb ramps or blended transitions shall be provided to connect the pedestrian access route at each pedestrian street crossing in accordance with the current version of PROWAG. Provide detectable warning surface in accordance with the current version of PROWAG. Frontage Improvements Policy: District Policy 7205.2.1 states that the developer shall widen the pavement to a minimum of 17-feet from centerline plus a 3-foot wide gravel shoulder adjacent to the entire site. Curb, gutter and additional pavement widening may be required (See Section 7205.5.5). ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway features required through development. This segment of Ustick Road is designated in the MSM as a Residential Arterial with 5-lanes, a 59-foot street section with a 10-foot wide multi-use pathway within 100-feet of right-of-way. 6. McDermott Bypass Collector Street Policy: District policy 7206.2.1 states that the developer is responsible for improving all collector frontages adjacent to the site or internal to the development as required below, regardless of whether access is taken to all of the adjacent streets. Improvements shall include transitional segments in accordance with ADA and the current version of PROWAG. Master Street Map and Typologies Policy: District policy 7206.5 states that if the collector street is designated with a typology on the Master Street Map, that typology shall be considered for the required street improvements. If there is no typology listed in the Master Street Map, then standard street sections shall serve as the default. ACHD reserves the right to require bicycle and pedestrian facilities above those identified in the Livable Streets Design Guide and Master Street Map to ensure the safest facility possible based on current best practice. Street Section and Right-of-Way Policy: District policy 7206.5.2 states that the standard right- of-way width for collector streets shall typically be 50 to 70-feet, depending on the location and width of the sidewalk or multi-use path and the location and use of the roadway. The right-of-way width may be reduced, with District approval, if the sidewalk or multi-use path is located within an easement; in which case the District will require a minimum right-of-way width that extends 2-feet behind the back-of-curb on each side. The standard street section shall be 47-feet (back-of-curb to back-of-curb). This width typically accommodates a single travel lane in each direction, a continuous center left-turn lane, and bike lanes. If a multi-use path is determined to be the required treatment, the street section shall be reduced to 37-feet. If it is determined a continuous center left-turn lane is not appropriate and a path is installed, the street section may be reduced to 26-feet. Residential Collector Policy: District policy 7206.5.2 states that the standard street section for a collector in a residential area shall be 36-feet (back-of-curb to back-of-curb). The District will consider a 33-foot or 29-foot street section with written fire department approval and taking into consideration the needs of the adjacent land use, the projected volumes, the need for bicycle lanes, and on-street parking. At the discretion of Traffic Engineering staff, adjustments may be made to the street section, including removal of the continuous center turn lanes or modification to lane widths, where no driveways or intersections are present or to ensure adequate space for pathways and buffers. Pedestrian Facilities: District policy 7206.5.6 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all collector streets. A parkway strip at least 8-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District's planter width policy if trees are to be placed within the parkway strip. Sidewalk constructed next to the back-of-curb shall be a minimum of 7-feet wide. Alternatively, on roadways identified as low-stress bikeways in ACHD's Bike Master Plan, a 16 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 minimum 10-foot wide multi-use path may be required in lieu of sidewalks. ACHD Development Review staff will be responsible for determining the required facility. The path shall be built 8-feet behind the back-of-curb as measured to the closest edge of the path. Street trees are encouraged between the pedestrian facility and the roadway when irrigation and maintenance will occur by the adjacent property owner or HOA through an approved license agreement. Vertical hardscape alternatives to street trees may be considered in the buffer space when street trees are not practicable. Pedestrian facilities should be parallel to the adjacent roadway. Pedestrian facilities will only be allowed to deviate from a straight line when authorized by Development Review staff to meet site specific conditions (i.e., street trees, utilities, etc.). Appropriate easements shall be provided if public sidewalks or multi-use paths are placed out of the right-of-way. The easement shall encompass the entire area between the right-of-way line and 2-feet behind the back edge of the sidewalk or multi-use path. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Curb ramps or blended transitions shall be provided to connect the pedestrian access route at each pedestrian street crossing in accordance with the current version of PROWAG. Provide detectable warning surface in accordance with the current version of PROWAG. ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, collector street requirements, and specific roadway features required through development. This segment of McDermott Bypass is designated in the MSM as a Residential Collector, 36-foot wide street section with on-street bike lanes. Sidewalk Policy: District Policy 7207.5.7 states that five-foot wide concrete sidewalk is required on both sides of all local street, except those in rural developments with net densities of one dwelling unit per 1.0 acre or less, or in hillside conditions where there is no direct lot frontage, in which case a sidewalk shall be constructed along one side of the street. Some local jurisdictions may require wider sidewalks. The sidewalk may be placed next to the back-of-curb. Where feasible, a parkway strip at least 8- feet wide between the back-of-curb and the street edge of the sidewalk is recommended to provide increased safety and protection of pedestrians and to allow for the planting of trees in accordance with the District's Tree Planting Policy. If no trees are to be planted in the parkway strip, the applicant may submit a request to the District, with justification, to reduce the width of the parkway strip. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right-of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. 7. Driveways 7.1 McDermott Bypass Access Policy: District Policy 7206.4.1 states that all access points associated with development applications shall be determined in accordance with the policies in this section and Section 7202. Access points shall be reviewed only for a development application that is being considered by the lead land use agency. Approved access points may be relocated and/or restricted in the future if the land use intensifies, changes, or the property redevelops. District Policy 7206.1 states that the primary function of a collector is to intercept traffic from the local street system and carry that traffic to the nearest arterial. A secondary function is to service 17 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 adjacent property. Access will be limited or controlled. Collectors may also be designated at bicycle and bus routes. Driveway Location Policy (Signalized Intersection): District policy 7206.4.3 requires driveways located on collector roadways near a signalized intersection to be located outside the area of influence; OR a minimum of 440-feet from the signalized intersection for a full-access driveway and a minimum of 220-feet from the signalized intersection for a right-in/right-out only driveway. Dimensions shall be measured from the centerline of the intersection to the centerline of the driveway. Driveway Location Policy (Stop Controlled Intersection): District policy 7206.4.4 requires driveways located on collector roadways near a STOP controlled intersection to be located outside of the area of influence; OR a minimum of 150-feet from the intersection, whichever is greater. Dimensions shall be measured from the centerline of the intersection to the centerline of the driveway. Successive Driveways: District policy 7206.4.5 Table 1 requires driveways located on collector roadways with a speed limit of 25 MPH and daily traffic volumes greater than 100 VTD to align or offset a minimum of 285-feet from any existing or proposed driveway. Driveway Width Policy: District policy 7206.4.6 restricts high-volume driveways (100 VTD or more)to a maximum width of 36-feet and low-volume driveways (less than 100 VTD)to a maximum width of 30-feet. Curb return type driveways with 30-foot radii will be required for high-volume driveways with 100 VTD or more. Curb return type driveways with 15-foot radii will be required for low-volume driveways with less than 100 VTD. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7206.4.6, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers in accordance with Table 2 under District Policy 7206.4.6. 8. Tree Planters Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in planters less than 8-feet in width without the installation of root barriers. Class II trees may be allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed in planters with a minimum width of 10-feet. 9. Landscaping Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop signs. Landscape plans are required with the submittal of civil plans and must meet all District requirements prior to signature of the final plat and/or approval of the civil plans. 10. Pathway Crossings United States Access Board R304.5.1.2 Shared Use Paths. In shared use paths, the width of curb ramps runs and blended transitions shall be equal to the width of the shared use path. AASHTO's Guidelines for the Development of Bicycle Facilities 5.3.5 Other Intersection Treatments: The opening of a shared use path at the roadway should be at least the same width as the shared use path itself. If a curb ramp is provided, the ramp should be the full width of the path, not including any flared sides if utilized. . . . Detectable warnings should be placed across the full width of the ramp. 18 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 FHWA's "Designing Sidewalks and Trails for Access" (1999) reflected common ADA-related concepts: Chapter 6, Page 16-6: The width of the ramp should be at least as wide as the average width of the trail to improve safety for users who will be traveling at various speeds. In addition, the overall width of the trail should be increased, so the curb ramp can be slightly offset to the side. The increased width reduces conflict at the intersection by providing more space for users at the bottom of the ramp. 19 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 G. Attachments Kimle }>)Horn Table 4—Project Trip Generation ITE AM Peak P M!P e!a k Land Use Typo f Quantity Unfts Daify Use Total In Out Total In Out Total Code Drive-In Dank 912 6 1.000 SF 593 21) 60 63 63 12s Fast-Food Restaurant wl q3; 2 1,000 SF 896 3.1 32 66 33 30 63 Drive-Thru CoffeelDonut Shop with Dnue- Drive-ThrulNo Indoor Seating 938 1 Thru 179 18 F 36 8 7 15 Lanes Conven i a nce StorelGas 945 F10 Fuel 2035 102 c+7 199 96 96 192 Station(GFA 4-5.5k SF) Positions Total Trips 3,703 189 172 361 200 146 396 internal Capture-Restaurant tolfrom Durango Commercial -241 -7 -11 -10 -12 -22 Total Trips after Internal Capture 3,462 182 168 340 i9a 184 374 Pass-By Trip Reduction 912: pally—32%,RIM—29%,PM—35%; 934:Daily—52%,AM—50%,PM—55%: -2 094 -118 -111 -229 -115 -111 -226 938:Daily—94%,AM—90%,PM—98%; 945:Dai# --75%,AM—76%. PM—75% Grand Total New Trips 1,368 1 64 57 121 75 73 148 The proposed development before pass-by trip reduction is expected to generate 3,703 daily trips, with 361 trips occurring in the AM peak hour and 396 trips occurring in the PM peak hour. After internal capture,the total number of trips to the development are 3,462 daily trips,with 340 trips occurring in the AM peak hour and 374 trips occurring in the PM peak hour. A large portion of these trips are pass-by trips, and with pass-by trip reductions, the proposed development is expected to generate 1,368 new daily trips,with 121 new trips occurring in the AM peak hour and 148 new trips occurring in the PM peak hour. 4.6. Medium Density Residential Trip Generation Comparison Table 5 shows the expected trip generation for the current zoning of the proposed site(medium density residential (R-S)). For R-8 zoning, eight dwelling units per acre is the assumed density. The site consists of 3.16 acres,so it could potentially have up to 25 dwelling units constructed on it. ITE land use 210, Single Family Detached Housing was assumed. ITE trip generation information for the residential land use is provided in Appendix I. Table 5—Medium Density Residential Trip Generation QuantityITE AM Peak PM Peak Land Use Type Land Use Total In Out Out Total ..- Single Family detached 210 25 Dwelling 467 6 16 22 17 110 27 Housing Unit Single Family Attached 215 25 Dwelling 167 3 9 1 12 4 2 1 H Housing Unit 193088003 5900 Ustick—Traffic Impact Study 5900 Ustick TIS.docx February 2026 Pane 24 20 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 I imle ) Horn 1 . EXECUTIVE SUMMARY 1.1. Project Description This report documents a traffic impact study (TIS)for a proposed mixed-use development located on the northeast corner of the Ustick Road / McDermott Road intersection in the City of Meridian, Ada County, Idaho. The proposed 5900 Ustick mixed-use development includes a convenience store/gas station with 10 fuel positions, a drive-in bank, a coffee shop with drive-thru/no indoor seating, and a fast-food restaurant with a drive-thru. The project is anticipated to be completed in 2026. With the construction of the Ustick Road / SH-16 traffic interchange 0.4 miles to the west, field collected traffic counts would not provide an accurate representation of existing or future traffic patterns. In scoping discussions with ACHD and City of Meridian staff, it was determined that 2025 existing and 2026 plus project conditions would be impractical to analyze because of the construction. The analysis presented in this TIS will consist of 2032 traffic conditions based off the analysis found in the Dayspring Subdivision TIS, dated February 2025 and Transportation Environmental Impact Statement, Idaho 16, 1-84 to Idaho 44 Environmental Study, dated December 2008. Access to the site is proposed via three accesses, one right-in/right-out (RIRO) on Ustick Road (Access A), one full movement access on McDermott Road (Access B), and one full movement access on Dayspring Way (Access C). In scoping with reviewing agencies, it was requested that two scenarios for the 2032 Plus Project conditions be analyzed, including the following scenarios: • 2032 Plus Project (three project access locations: Project Access A, B, and C) • 2032 Plus Project (two project access location: Project Access B and C) It should be noted that during initial scoping of the TIS, the development was proposed to have three access locations. In discussion with the client after scoping was completed with the reviewing agencies, the agreement has changed with the owner of the adjacent parcel to the east. With discussion of the developers of the Durango Subdivision, cross-access to Dayspring Way will be available in the future. The purpose of this traffic impact study is to identify trip generation characteristics of the proposed development, evaluate traffic related impacts on the adjacent street system, and recommend measures to mitigate impacts. Study area intersections and roadway segments are shown in Figure ES-1. 1.2. Findings 1.2.1. Trip Generation The proposed development before internal capture and pass-by trip reduction is expected to generate 3,703 daily trips, with 361 trips occurring in the AM peak hour and 396 trips occurring in the PM peak hour. After internal capture, the development is expected to generate 3,462 daily trips, with 340 trips occurring in the AM peak hour and 374 trips occurring in the PM peak hour. After pass-by trip reduction, the proposed development is expected to generate 1,368 new daily trips, with 121 new trips occurring in the AM peak hour and 148 new trips occurring in the PM peak hour. 193088003 5900 Ustick—Traffic Impact Study 5900 Ustick TIS.docx February 2026 Page 6 imle Horn 1.2.2. Analysis Findings and Mitigation Recommendations Table ES-1 shows the intersection mitigations summarized by when improvements are required. Analysis findings and mitigations are presented in Table ES-2. 1.2.2.1. 2032 Background Recommended Mitigations It is recommended that the Ustick Road / Morgan Grove Lane intersection be signalized with dedicated protected-permissive left turn lanes and shared through/right lanes for each approach or be converted to a roundabout. No mitigations are recommended at this time for the Ustick Road /SH-16 traffic interchange (TI). It is recommended that ITD monitor the traffic conditions at the TI once it is built and determine if any mitigations are required in the future. 1.2.2.2. 2032 Plus Project Recommended Mitigations It is recommended that all three accesses, Project Access A, B, and C, be constructed, and that Project Access A be constructed with an exclusive westbound right turn lane. Table ES-1 — Intersection Mitigation Summary 2032 Buildout Year BackgroundIntersection Plus Project Plus Project Locations) Locations) 1 Ustick Road/SH-16 SB None* None None Ramps 2 Ustick Road/SH-16 NB None* None None Ramps 3 Ustick Road/McDermott None None None Road Ustick Road/Morgan Grove Traffic signal or 4 Lane multi-lane None None roundabout A Ustick Road/Project N/A Westbound right- N/A Access A turn lane warranted B McDermott Road/ Project N/A None None Access B * No mitigations are recommended for the Ustick Road/SH-16 TI at this time. See Section 1.2.2.1 for further explanation. 193088003 5900 Ustick—Traffic Impact Study 5900 Ustick TIS.docx February 2026 Page 7 .,+. L7 s k i R NORTH Y L 1 Becky Drive F be 14 IN ' Y�R� . y PL 2 - le 1.4 } r , y: •_ Project LocationB CDayspring Way (Proposed Future Road) AI — — - - - Ustick Road Morgan Grove Lane (Realignment) S3LE END Q INTERSECTION AND DRIVEWAYS ® ROADWAY SEGMENT Image Source: Nearmap US, INC. Study Area Intersections: 1. Ustick Road and SH-16 Southbound Ramps 2. Ustick Road and SH-16 Northbound Ramps 3. Ustick Road and McDermott Road 4. Ustick Road and Dayspring Way (Future Proposed Road) A. Ustick Road and Access A B. McDermott Road and Access B C. Dayspring Way and Access C Study Area Roadway Segments: 1. Ustick Road, McDermott Road to Morgan Grove Lane 2. McDermott Road, Ustick Road to Becky Drive 3. McDermott Road, Ustick Road to Gernicka Place Kimle >)Horn Figure ES-1 Y Study Area Intersections and Roadway Segments February 2026 5900 Ustick Development- Meridian, ID I Traffic Impact Study Ili mle Horn Table ES-2 — Findings and Potential Mitigations 2032 Background Conditions • All study area intersections operate at acceptable thresholds except the following: o Ustick Road/SH-16 SB Ramps ■ AM EBT—LOS F,V/C 1.20 ■ PM EBT—LOS F,V/C 1.24 o Ustick Road/SH-16 NB Ramps ■ AM WBT—LOS F, V/C 1.26 ■ AM NBR—LOS F, V/C 1.14 ■ PM WBT—LOS F, V/C 1.30 FindingsPM NBR—LOS F, V/C 1.13 o Ustick Road/Morgan Grove Lane ■ AM NBL—V/C 10.83 ■ AM SBUT/R—V/C 6.74 ■ PM NBL—V/C 6.33 ■ PM SBUT/R—V/C 6.95 • All analyzed roadways segments operate within acceptable thresholds. • A total of 2 crashes were recorded at study area intersections and roadway segments in the most recent five- year period resulting in 2 property damage only, 0 injury, and 0 fatal crashes. • No mitigations are recommended at this time for the Ustick Road / SH-16 traffic interchange (TI). It is recommended that ITD monitor the traffic conditions at the TI once it is built and determine if any mitigations are required in the future. Potential •• • Ustick Road/Morgan Grove Lane o The four-hour and peak hour signal warrants are met. o It is recommended that the intersection be signalized with dedicated left turn lanes and shared through/right lanes for each approach or be converted to a roundabout. • SH-16 Extension from US 20/26(Chinden Boulevard)to I-84 will be constructed over the course of 2 years (2025-2026). • The Ustick Road/McDermott Road intersection is planned to have all legs widened and have enhanced pedestrian and bike facilities, intersection lighting, accessible pedestrian signal with leading pedestrian Planned intervals constructed in 2027. Improvements • Ustick Road from McDermott Road to Black Cat Road is planned to be widened to five lanes, two through lanes in each direction with a center median and turn pockets, along with enhanced pedestrian and bike facilities on both sides in 2027. • Ustick from Star Road to McDermott Road is planned to be widened to five lanes in 2026-2030. Mitigated 2032 Background Conditions • All study area intersections operate at acceptable thresholds except the following: o Ustick Road/SH-16 SB Ramps ■ AM EBT—LOS F,V/C 1.20 ■ PM EBT—LOS F,V/C 1.24 Findings o Ustick Road/SH-16 NB Ramps ■ AM WBT—LOS F, V/C 1.26 ■ AM NBR—LOS F, V/C 1.14 ■ PM WBT—LOS F, V/C 1.30 ■ PM NBR—LOS F, V/C 1.13 193088003 5900 Ustick—Traffic Impact Study 5900 Ustick TIS.docx February 2026 Page 9 KimlerMorn 2032 Plus Project Conditions(Three Access Locations A, B,and C) • All study area intersections operate at acceptable levels except the following: o Ustick Road/SH-16 SIB Ramps • AM EBT—LOS F,V/C 1.21 ■ PM EBT—LOS F,V/C 1.28 Findings o Ustick Road/SH-16 NB Ramps ■ AM WBT—LOS F, V/C 1.32 ■ AM NBR—LOS F, V/C 1.12 ■ PM WBT—LOS F, V/C 1.35 ■ PM NBR—LOS F, V/C 1.20 • All analyzed roadways segments operate within acceptable thresholds. • No mitigations are recommended at this time for the Ustick Road / SH-16 traffic interchange (TI). It is Potential Mitigationsrecommended that ITD monitor the traffic conditions at the TI once it is built and determine if any mitigations are required in the future. Turn Lane Analysis • Westbound right-turn lane warrant is met for Ustick Road/Project Access A. 2032 Plus Project Conditions(Two Access Locations B and C) • All study area intersections operate at acceptable levels except the following: o Ustick Road/SH-16 SB Ramps ■ AM EBT—LOS F,V/C 1.21 ■ PM EBT—LOS F,V/C 1.28 Findings o Ustick Road/SH-16 NB Ramps ■ AM WBT—LOS F, V/C 1.32 ■ AM NBR—LOS F, V/C 1.12 ■ PM WBT—LOS F, V/C 1.32 ■ PM NBR—LOS F, V/C 1.14 • All analyzed roadways segments operate within acceptable thresholds. • No mitigations are recommended at this time for the Ustick Road / SH-16 traffic interchange (TI). It is Potential Mitigationsrecommended that ITD monitor the traffic conditions at the TI once it is built and determine if any mitigations are required in the future. • No turn lane warrants are met. 193088003 5900 Ustick—Traffic Impact Study 5900 Ustick TIS.docx February 2026 Page 10 H. Standard Conditions of Approval 1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non- compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA), Public Right-of-Way Accessibility Guidelines (PROWAG), ISPWC, or ACHD requirements. The applicant's engineer should provide documentation of compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number)for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled)are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property, which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. I. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. 21 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007 Request for Appeal of Staff Decision To request an appeal of a staff level decision, see District policy 7101.6.7 at https://www.achdidaho.org/home/showpublisheddocument/452/638243231708370000 Request for Reconsideration of Commission Action To request reconsideration of a Commission Action, see District policy 1006.11 at https://www.achdidaho.org/home/showpublisheddocument/452/638243231708370000 22 DRAFT Ustick Commercial/ MPP25-0028/ H-2025-0059/ H-2026-0007