Loading...
HomeMy WebLinkAboutConstruction Drawings_Part15 a o Q RIM ELEVATION S\ONAL F mN PER PLAN OC��'G'�GENSFO J O Q 3-2 26 �j a W GRADE RINGS AS REQUIRED O cS') � O v Q w (18" MAX.) SET RIM FLUSH �TFOF\OP Q o WITH FINISHED GRADE 'A/ENE M c~n U OBSERVATION WELL V z PER ACHD SD-627 20" BAFFLE WIDTH U in J J w BAFFLEELEVA "C"ION JW 12" INLET PIPE PER PLAN BAFFLE "B" ELEVATION o w 18" OUTLET PERF PIPE PER 1 D m > a a a a a a „ WRAP TOP AND SIDES OF TRENCH IN NON—WOVEN PLAN AND DETAIL 1 THIS •L � U 2 WASHED FILTER FABRIC GEOTEX 401 OR APPROVED EQUAL. SHEET cu � I�RAI ROCK GEOTEXTILES SHALL CONFORM TO THE REQUIREMENTS N � M 00 o a a a a a a d L/a a a a a a a OF ACHD POLICY MANUAL SECTION 8202.23. SEAMS � �,`� w SHALL OVERLAP A MINIMUM OF 1'. X in z 5')a a a a a a a a a a a a a a o a PROFILE VIEW O mw cf) � ^ c i� IN. a 4 4 i1� a i� � a - @) o g w O N w Ne 0- SAND AND GREASE TRAP (BOISE m fu 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0VAULT OR APPROVED EQUAL WITHfu z _ _ w BAFFLES) SIZE PER TABLE 24" DIA. TRAFFIC RATED FRAME AND 0) -Tw0 STANDARD MANHOLE COVER PER a a a a a a a a a a a a ISPWC SD-617. , 18 ADS, HDPE OR a PVC PERFORATED a a a a a a a a a a cn N PIPE. PERFORATIONS m' IN TOP HALF ONLY. a a a a a 12" INLET PIPE PER PLAN w a a a a a a a a a a a a a a o a a a a a a a a a a a a a a W R o SAND AND GREASE TRAP z_ = D I (ACHD BMP #01). SEE ASTM C33 : C/) DETAIL 2 THIS SHEET. FILTER SAND 0 o z c� w o j \ \ \ U \/� EXCAVATE TO NATIVE MATERIAL (SEE /r /r rr FREE\DRAINING/ / / / / 18" OUTLET PERF PIPE PER ~ VERB Y FACILITY Y NFILTRATIONHRATE NA VERIFY / SHEET PLAN AND DETAIL 1 THIS J o AFTER FACILITY IS FULLY EXCAVATED. � � PLAN VIEW o 0 z ESTIMATED HIGH a Li PROFILE VIEW GROUNDWATER o NOT ENCOUNTERED Lu N z PORTION OF OBSERVATION WELL LYING SAND AND GREASE TRAP TABLE w IN DRAINAGE SAND MUST BE WRAPPED > WITH TYPE I DRAINAGE GEOTEXTILE PER a - Ln Q _ :2w STRUCTURE NAME SIZE RIM ELEV. INV. ELEV. IN BAFFLE "B" ELEV. BAFFLE "C" ELEV. INV. ELEV. OUT z � ISPWC SECTION 2050. J O X p ~ uj w Q ACHD SG TRAP #1-1 1000 GALLON 2691.93' 2688.10' 2688.00' 2687.50' 2687.25' z � z 0 0 O D ACHD SG TRAP #1-2 1000 GALLON 2694.75' 2688.10' 2688.00' 2687.50' 2687.25' ti SAND AND GREASE TRAP LENGTH PER TABLE a z L_ (ACHD BMP #01). SEE cwn J ACHD SG TRAP #2-1 1000 GALLON 2712.22' 2708.35' 2708.25' 2707.75' 2707.50' w o DETAIL 2 THIS SHEET. z z O � o cn DESIGNED: C. GRAHAM po w 5' SAND AND GREASE TRAP DETAIL (ACHD BMP #01 )Ld 2 DRAWN: L. HAASE J MIN. SCALE: NOT TO SCALE C9,1 CHECKED: C. GRAHAM 18" PERFORATED PIPE WITH PERFORATIONS TOP HALF ONLY Li APPROVED: C. GRAHAM w z O = U PREPARED FOR: o INLET PIPE PER PLAN F 1 1 1 LLC Q� (9 1 PO BOX 593 Li EAGLE, ID 83616 z 50' MIN. PLAN VIEW 5' MIN. Q OBSERVATION WELL ELECTRONIC MARKERS PLACED ON CORNER PER ACHD SD-627 OF FACILITY. COORDINATE WITH ACHD c� INSPECTION STAFF FOR PLACEMENT OF in J M INSTALL 20 MIL HDPE LINER ALONG MARKERS DURING CONSTRUCTION PRIOR Of a WESTERN SIDE AND ENDS OF TO BACKFILLING. o Y SEEPAGE BED #2 FOR REDUCED m wbi Z of SEPARATION TO WATER MAIN 100—YEAR WATER SURFACE ELEVATION 0 OBSERVATION WELL Li PER ACHD SD-627 TEMP SWALE #3=2699.50' 100—YEAR VOLUME=670 CF , co NOTES //\\ \\ \ \\ \ V N //\//\i c� 1. ACCORDING TO THE PROJECT GEOTECHNICAL REPORT PREPARED BY CMT ENGINEERING LABORATORIES d w DATED SEPTEMBER 12, 2019, GROUNDWATER WAS NOT ENCOUNTERED DURING GEOTECHNICAL /\\//\ \ \//\//� O EXPLORATION. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF GROUNDWATER IS Z J ENCOUNTERED WITHIN 3—FEET OF THE BOTTOM DESIGN ELEVATION FROM ANY INFILTRATION FACILITY //\//\ V) AND/OR IF IT IS HIGHER THAN ANTICIPATED. \/�\/\\/ `W S,/�F j Q Li /\/�\\/ / Z Q 2. REFER TO ACHD BMP 20 FOR ADDITIONAL INFORMATION REGARDING SEEPAGE BED CONSTRUCTION. �jj\/\ \�Op w w N �` �r /\// O J w 3. ACHD STAFF MUST VERIFY FACILITY INFILTRATION RATE AFTER FACILITY IS FULLY EXCAVATED. \\%j\//� BOTTOM ELEV //// /\\/ N 0 4. IF ROCK IS ENCOUNTERED DURING FACILITY EXCAVATION, CONTRACTOR TO HAVE TEST PERFORMED BY TEMP SWALE #3=2698.00 / \\ \\/� > z Z SOILS ENGINEER AFTER SEEPAGE TRENCH IS FULLY EXCAVATED. IF THE PERCOLATION TEST IS LESS /\ \\ \ \ \ \ \ \ \ \ \ \ \/\\�\\ THAN SPECIFIED BY THE SOILS REPORT AND ENGINEER, CONTRACTOR MAY NEED TO BLAST OR BORE TO W/ // ////////////r/j// //j/////j///// /' O 0 Q z CREATE CONDUIT FOR DRAINAGE TO OCCUR OR REDESIGN THE SYSTEM TO ACHIEVE THE REQUIRED \.\/\.\\.\\.\\.\\.\\.\/\.\\.\\.\\.\\ ' LL m w INFILTRATION. LJJ LLI z TEMPORARY SWALE SUMMARY �, SEEPAGE BED TABLE SWALE TOP SWALE BOTTOM 0 SWALE N0. AVERAGE DEPTH (FT) DIMENSIONS (WxL) DIMENSIONS (WxL) O Ci SEEPAGE BED NO. SEEPAGE BED DIMS TOP OF ROCK ELEV. BOTTOM OF ROCK ELEV. BOTTOM OF SAND ELEV. PERF. PIPE INVERT PERF. PIPE DIAMETER 100—YEAR VOLUME DESIGN INFILTRATION RATE a Q w TEMP BASIN #3 1.50 16'x48' 4'x36' a Q N ACHD SEEPAGE BED #1 14'Wx101'Lx8'D 2691.00' 2683.00' 2681.50' 2687.25' (1) 18" 5,556 CF 8 IN/HR Z ACHD SEEPAGE BED #2 15'Wx43'Lx6'D 2710.00' 2704.00' 2702.50' 2707.50' (1) 18" 1,987 CF 8 IN/HR TEMPORARY SWALE CROSS SECTION 3 0 SCALE: NOT TO SCALE Z J U SEEPAGE BED DETAIL (ACHD BMP #20) 1 W N SCALE: NOT TO SCALE C 9.1 O LA N CSW PROJECT NO. 24005 DRAWING DATE 03/02/2026 C� 0 W C9 , 1