Loading...
HomeMy WebLinkAboutConstruction Drawings_Part6 a o Q u R R C-5S\oNAL F m N FGo/ o �\GENSF� N Q� 0 > a m �600� I a �w 1 w 50.00' 16970 3-2-26 � anv Iv i(ol OF ENE M.G� U w /0'j 0 25 50 100 150 J I Jill (n \ w I w I SCALE: 1" = 50' i I TYPICAL LOT GRADING DETAIL A MIDPOIGRADE NT OF LOT BELLY AT J i Li SCALE: NOT TO SCALE C3.0 W o \ PROVIDE KNOCKOUT ' D a O a� I 00 DRAIN FOR FUTURE EXTENSION o L I w Q w ABBREVIATIONS u_ W 1 ►�'� 'U N (Jul Ln o M = � 0 o I I I 0) FC' \ I CL CENTERLINE co , J II N N �� I EX EXISTING GROUND X zp I 0' FUTURE PHASE FFE FINISHED FLOOR ELEVATION O cf) Iw `"I w I� I �0°' I F�- FG FINISHED GRADE m U) U 00 SG TRAP 1-2 ,�2�sr a O # ACHD SEEPAGE BED #1 c 7 O . I O FL FLOW LINE �``� GRVL EDGE OF GRAVEL co E I 14'Wx101'Lx8'D G �L fu w , o' 100-YR VOL=5,556 CF F ` n HP HIGH POINT � z a I I I \\ o SEE DETAIL 1 SHEET C9.0 CB #2A B'0' �`1O 1 q INV INVERT L LLJC, . ME MATCH EXISTING U Io w 1 III ®• r �O� Uw��QNPSE Q25=1.06 CFS F 731 , �� " \\ \I �� , TRC TOP BACK OF ROLLED CURB Q100=1.48 CFS 2> � ` � RIM RIM ELEVATION a �00 F �O ^ C \cf) \ M \ \ 12 \ 2), \ ���. TVC TOP BACK OF VERTICAL CURB , N III 00 2�O „� \ \N \ \ Fc `383. ��� < TOC TOP OF CONCRTOA TOP OF ETE � w w ICIII �69 F�' FO �O �C 1G• c� 2713 s \ \ \ R� X U J r 9 of BLOCK 10 \ - \ \ \ 2� � 0 w 1 �I �. , ?� 00N o,`O 8.0. ^00 SG TRAP #1-1 / 0 60 F F F pp 00' _V 27 \ ;`phNO -2699- - •�L 0� �� G' 87, 0 03 \ S3, \ \ \ t3` \ w t 17 LF 12" PVC ® 2.70% " EX a - - 2) ASS,_ t36 LF 12 PVC ® 2.17% \� \ �\ \ 2> � I ' BLOCK 9 00 \ HIV \ \ Q \� \ \\ 1 1 \ Fc 13 3� 2724.18' c� E` z ® H100=2.36 B #1B r , ®® - -V1I.ROVTEgURNOR O \\ \\ \ \\ STRUCTURE TABLE N � I 25=1.69 CFS v �� \ \ \ zo I CFS �� �o �> 10 \ \ `� \ \ \ 2j>3 \ \\ STRUCTURE NAME: DETAILS: TO O� 2� 2 CzG TRAP #2-1 \ \ \ \ \\ z I� I I CB #1A W. ROUTEBURN DRIVE c �� `9�' \ \ - �, \ \ \ ` EX RIM=2691.11 g =49 LF 12" PVC ® 0.50% Q25=0.50 CFS �--- �• >p , Q100=0.69 CFS �6 O� �s,��O 2704 ` \\ \ ��`L v \ \ 2723.63' CB #1 A 12" INV OUT=2688.80(N) CD _ FG \ 2712.70' o a 111 BLOCK 8 ' \ \ o \ ��G \ \ 2713.31' \ \\ 10 FG \ RIM=2691.25 z o z p a d III p tl ^ co a, 3 p /� \ �. \ \ .� \ CB #1B 12" INV IN=2688.56(S) oOf w w r_ 2693 �s O� 1 �o O� °' A u, O� �> N 4? FG \ f52 LF 18" PVC ® 0.00% \ `V \� 12" INV OUT=2688.56 N a 0 w I I rn T° 9> 'y < .� co co o ? O ,c, 1 \ "\\ r'> / EX ( ) / s Zo <i A y N �, N .,'� o p s.o 0 0 2 \ \ \ \ ° BLOCK 6 u 11 T 9j N �• 0 1 0 0,• sr 2713.03 ' \ \ \ 0 2723.80' 1 2697 - 0°'� �o°'- - ro°' - 0°' N �O �' \ \ 18\ \ 2713.21 \ CB 2A RIM=2711.63 w uj F_ �cf) G I/ � FG ��` �' �' �' 00' 2698.77' \� \ \ \ FG \ \ \ 2712.80'� # 12" INV OUT=2709.13(S) 0 0 z I (� 2694.41' 60tx �09 2s9 �s9 °' O `l� FG r'� \ \ \ \ \ \ \ \ FG w w ) I ti G u'R G' �S c sr> c ,� 06 �,� �o 'o \ �� \ ACHD SEEPAGE BED #2 \ \ \ RIM=2691.93 60 O 15'Wx43'Lx6'D \ \ \ \ / FG SG TRAP #1-1 12" INV IN=2688.10(S) w `L G o r'> 100-YR VOL=1,987 CF \ \\� \ 2j>2 \ 18" INV OUT=2687.25(N) Q SEE DETAIL 1 SHEET C9.0 \ \ %\ \ FG \ \ \ z NF \ \ \ \2712.87' \ `�>� 2712.70' \ \ \ RIM=2694.75bi I O \ FG \ \ \ \ SG TRAP #1-2 12 INV IN=2688.10(E) zo a 1 w I I I 2698.25' 2713.20' \ \ \ \ O \ \\ \ _ �a 18" INV OUT=2687.25(S) I_" I I sE \ \ \ \ / z o I e\A FG \ \ \ \ .r \ \ \ \ o v III FVw�E ACHD TEMP SWALE #3 \ \ \ \ \ �j> \ \�' '�yG\ \\ \\ \ / RIM=2712.22 LL. �s I FG 2 TOP DIMS=16'Wx48'L BLOCK 5 \ \ p \ O,P \ \ \I SG TRAP #2-1 12" INV IN=2708.35(N) w o I T° 9s, Off` .�G,696, �O BOTTOM DIMS=4'Wx36'L \ \ \ \ 2712.52 9� \ FG 18" INV OUT=2707.50(SW) a a I III �• o�V' 6'p, �rO DEPTH=1.50' \ \ \ FG �� \ 2712.16' �w w O O \ \ 1 DESIGNED: C. GRAHAM 0 100-YR VOL=670 CIF \ \ \ c•o \ O. 0 I 0) rn SEE DETAIL 3 SHEET C9.1 2698.42 � FG \ �6 \ \ \\ \ \O� DRAWN: L. HAASE LiJ N N FG '\ \ \ 2 \ \ \ \ cn I I 2712.85 \ \ \ ��2 \ 2712.13'\ J�� CHECKED: C. GRAHAM w I w O�`96, �'� >0 \ \ \\ \ \FG �J� APPROVED: C. GRAHAM 8• 00"� \ \\ \ \ \ \ 0ya o = I 2698.06' \45 FG °F` FG; \ \\\� PREPARED FOR: �u w I T269 FG 2`12.50'\\ \\ \ \ w I I °� sow ��� \ \ \ F 1 1 1 LLC PO BOX 593 EAGLE, ID 83616 z I I I I FG o Q II w I GRADING NOTES 1�pp S \ / FG ' J °T�s9S �G1 \ 2712.14' J I i �G 1. CONTRACTOR SHALL OBTAIN ALL NECESSARY EROSION AND SEDIMENT CONTROL AND EPA NPDES PERMITS PRIOR TO STARTING WORK. 2697.33' / a o I 111 2. CLEARING AND GRUBBING SHALL CONFORM TO ISPWC SECTION 201 AND THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. FG 0 o '/ Z 0 , BLOCK 8 1 w I 3. EXCAVATION AND EMBANKMENT SHALL CONFORM TO ISPWC SECTION 202 WITH CLASS B COMPACTION AND FOLLOW THE RECOMMENDATIONS OF O Li I I A �O FG THE GEOTECHNICAL REPORT. 60 4. NO GRADING IS PERMITTED ON ADJACENT PROPERTY. MATCH INTO EXISTING GRADE 2' FROM PROPERTY BOUNDARY. NO DRAINAGE SHALL BE V j 0' ALLOWED TO PASS FROM THE PROJECT SITE ONTO ADJACENT PROPERTY. / Q c> I °¢ w I / d J I o III I w 5. ANY UNCONTROLLED FILL ENCOUNTERED BENEATH PROPOSED BUILDING PADS AND DRIVE AISLES SHALL BE EXCAVATED TO SUFFICIENT DEPTHS Z w I • �s �C. TO EXPOSE COMPETENT NATIVE SOILS, REPLACED, AND RECOMPACTED. W III I z 9So�' 00��0 8. PRIOR TO PLACEMENT OF ANY GENERAL FILL, THE SITE SUBGRADE SHALL BE PREPPED IN ACCORDANCE WITH THE GEOTECHNICAL REPORT. THE R Z tA Z z V � Ol�w vi n N ;• N N `L PREPPED SUBGRADE SHALL BE OBSERVED AND APPROVED BY THE PROJECT GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT OF FILL MATERIALS. 24„ O O Q Q 0 co co w II I , 9. FILL PLACED TO DEVELOP BUILDING PADS SHALL MEET THE REQUIREMENTS FOR GENERAL FILL. GENERAL FILL USED FOR SITE GRADING MAY BE V �7i z OBTAINED FROM ON-SITE EXCAVATIONS OR APPROVED BORROW SOURCES. GENERAL FILL MATERIAL SHALL HAVE A MAXIMUM PARTICLE SIZE LESS THAN 6 INCHES AND SHALL BE FREE OF EXCESS MOISTURE, ORGANIC MATTER AND DEBRIS. REFER TO THE GEOTECHNICAL REPORT FOR 2" CAP UNIT > z Ce O 0 LLJ 0 1 w A �9- �60�'`' ADDITIONAL REQUIREMENTS. z I I 1 10. ALL AREAS OF CONSTRUCTION SHALL BE STRIPPED. STRIPPING SHALL CONSIST OF REMOVING THE TOPSOIL HUMUS. STRIPPED MATERIALS SHALL �- / 1/4" m G II BE PLACED OR STOCKPILED BY THE CONTRACTOR ON THE SITE AS SHOWN ON THE PLANS AND PER INSTRUCTION BY THE OWNER/DEVELOPER, LJJ (D O OR HAULED OFF SITE TO AN APPROVED LOCATION. \ 12" W (/� > Z z Iw w I I �s 11. THE CONTRACTOR SHALL CLEAN ALL SPILLED DIRT, GRAVEL OR OTHER FOREIGN MATERIALS CAUSED BY THE CONSTRUCTION OPERATIONS FROM \ 8" BASALITE GEOWALL PRO > �C ALL STREETS AND ROADS AT THE CONCLUSION OF EACH DAY OR OPERATION. CLEANING SHALL BE BY GRADER AND FRONT-END LOADER, w 3/4 CRUSHED BLOCKS. COLOR BY OWNER. O O V i >>,c SUPPLEMENTED BY POWER BRUSHING AND HAND LABOR UNLESS OTHERWISE APPROVED BY THE CITY. THE CONTRACTOR SHALL FOLLOW CITY a AGGREGATE INSTALL PER MANUFACTURER'S Z i� AND DEQ EROSION CONTROL PROCEDURES. RECOMMENDATIONS. ce C3 I I I 00 FILTER FABRIC. EXTEND a 0 J �w a. I N 12. AS SOON AS PRACTICAL AFTER COMPLETION OF ALL PAVING, THE CONTRACTOR SHALL REMOVE ALL DIRT, MUD, ROCK GRAVEL AND OTHER a 11 w C rn FOREIGN MATERIALS FROM THE PAVED SURFACE AND STORM DRAINAGE SYSTEM. AND STAKE FROM 24 Z (n N cv 30 ABOVE FINISHED GRADE ft�Y I I I� \ 4g,� 13. CONTRACTOR SHALL RETAIN AN INDEPENDENT TESTING LABORATORY FOR FIELD QUALITY CONTROL OF ALL BACKFILL AND ASPHALT. FIELD TO BOTTOM OF WALL o V 0 I I \\ I X X QUALITY CONTROL SHALL BE IN ACCORDANCE WITH ISPWC SECTION 204.3.4 AND SECTION 810.3.13. COPIES OF ALL TEST RESULTS SHALL BE �- Ipw w I \\\ �s PROVIDED TO THE CITY OF BOISE FOR REVIEW. 1 I _9?2' 14. ALL UNSUITABLE MATERIAL SUCH AS SOILS, TRASH, AND VEGETATION SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND PROPERLY J A_ DISPOSED OF OFF SITE. �\ 6" MIN. OF 3/4" R N 15. THE CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL SOILS REPORT PREPARED BY CMT ENGINEERING LABORATORIES DATED CRUSHED GRAVEL W "� LEVELING COURSE co �w w SEPTEMBER 12, 2019, CMT PROJECT NO. 13175. 0 LA N w 16. ABANDONED BUILDINGS, TEST PITS OR WATERWAYS LOCATED WITHIN CURRENT OR FUTURE RIGHT-OF-WAY SHALL BE RE-EXCAVATED TO NATIVE CSW PROJECT NO. 24005 SOIL AND BACKFILLED WITH STRUCTURAL FILL PER ISPWC SPECIFICATIONS. PROVIDE SOILS DATA TO VERIFY NATIVE MATERIAL MEETS THE G EOWALL PRO RETAINING WALL DETAIL 1 ~ DRAWING DATE 3/2/2026 REQUIREMENTS FOR ENGINEERED FILL PER ISPWC SPECIFICATIONS AND A COPY OF THE COMPACTION TESTS. SCALE: NOT TO SCALE C3°� w o W CIO