Loading...
HomeMy WebLinkAboutApex Zenith FP-2026-0006 Order BEFORE THE MERIDIAN CITY COUNCIL HEARING DATE: APRIL 14, 2026 ORDER APPROVAL DATE: APRIL 21, 2026 IN THE MATTER OF THE ) REQUEST FOR FINAL PLAT ) CONSISTING OF 7 BUILDING ) CASE NO. FP-2026-0006 LOTS AND 0 COMMON LOTS ON ) 11.065 ACRES OF LAND IN THE C- ) ORDER OF CONDITIONAL G ZONING DISTRICT FOR APEX ) APPROVAL OF FINAL PLAT ZENITH SUBDIVISION NO.1. ) BY: AMANDA MCNUTT ) APPLICANT ) This matter coming before the City Council on April 141h, 2026 for final plat approval pursuant to Unified Development Code (UDC) 11-6B-3 and the Council finding that the Administrative Review is complete by the Planning and Development Services Divisions of the Community Development Department, to the Mayor and Council, and the Council having considered the requirements of the preliminary plat, the Council takes the following action: IT IS HEREBY ORDERED THAT: 1. The Final Plat of"PLAT SHOWING APEX ZENITH SUBDIVISION NO.1, LOCATED IN GOVERNMENT LOT 4 OF SECTION 6, TOWNSHIP 2 NORTH, RANGE 1 EAST, BOISE MERIDIAN, MERIDIAN, ADA COUNTY, IDAHO, 2026, HANDWRITTEN DATE: MARCH 23rd, 2026, by AARON L> ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.1 —FP-2026-0006) Page 1 of 15 BALLARD, PLS, SHEET 1 OF 4," is conditionally approved subject to those conditions of Staff as set forth in the staff report to the Mayor and City Council from the Planning and Development Services divisions of the Community Development Department dated April 141h, 2026, a true and correct copy of which is attached hereto marked"Exhibit A" and by this reference incorporated herein. 2. The final plat upon which there is contained the certification and signature of the City Clerk and the City Engineer verifying that the plat meets the City's requirements shall be signed only at such time as: 2.1 The plat dimensions are approved by the City Engineer; and 2.2 The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash surety has been issued guaranteeing the completion of off-site and required on-site improvements. NOTICE OF FINAL ACTION AND RIGHT TO REGULATORY TAKINGS ANALYSIS The Applicant is hereby notified that pursuant to Idaho Code § 67-8003, the Owner may request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. Please take notice that this is a final action of the governing body of the City of Meridian, pursuant to Idaho Code § 67-6521. An affected person being a person who has an ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.1 —FP-2026-0006) Page 2 of 15 interest in real property which may be adversely affected by this decision may, within twenty- eight (28) days after the date of this decision and order, seek a judicial review pursuant to Idaho Code§ 67-52. By action of the City Council at its regular meeting held on the 21 st day of April, 2026. By: John Overton, Council President, City of Meridian 4-21-2026 Attest: Chris Johnson 4-21-2026 City Clerk Copy served upon the Applicant,Planning and Development Services Divisions of the Community Development Department and City Attorney. By: Dated: 4-21-2026 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.1 —FP-2026-0006) Page 3 of 15 EXHIBIT A STAFF REPORT E COMMUNITY DEVELOPMENT DEVELOPMENT DEPARTMENT HEARING 04/14/2026 Legend �. DATE' —' Project Location TO: Mayor&City Council Area of Impact m a= City Limits 1 FROM: Nick Napoli,Associate Planner O Analysis nnapoli@meridiancity.org SUBJECT: Apex Zenith FP-2026-0006 / _ �- r-. , L.. LOCATION: Located at the southeast corner of ; s Meridian Road and Lake Hazel Road in a --I -- portion of Lot 4 of Section 6, T.2N., , R.1 E. -"J ' I. PROJECT DESCRIPTION Final plat consisting of seven(7)building lots on 11.065 acres of land in the C-G zoning district for the Apex Zenith. II. APPLICANT INFORMATION A. Applicant: Amanda McNutt,Brighton Corporation—2929 W.Navigator Drive, Suite 400,Meridian ID 83642 B. Owner: Brighton Development Inc.—2929 W.Navigator Drive, Suite 400,Meridian ID 83642 C. Representative: Same as Applicant III. STAFF ANALYSIS Staff has reviewed the proposed final plat for substantial compliance with the approved preliminary plat Apex Zenith(H-2025-0041)in accord with the requirements listed in UDC 11-6B-3C.2. This plat ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.1 —FP-2026-0006) Page 4 of 15 incorporates seven(7)building lots. The final plat is consistent with the approved preliminary plat and recorded development agreement. In order for the proposed final plat to be deemed in substantial compliance with the approved preliminary plat as set forth in UDC 11-6B-3C.2,the number of buildable lots cannot increase, and the amount of common area cannot decrease. Since the number of buildable lots stayed the same and there is no open space required, Staff deems the proposed final plat to be in substantial compliance with the approved preliminary plat as required. IV. DECISION Staff recommends approval of the proposed final plat with the conditions noted in Section VI of this report. V. EXHIBITS A. Preliminary Plat Apex Zenith(dated: 10/06/25) ZENITH SUBDIVISION PRELIMINARY PLAT A PANCEL Of LAND BEING A PORI ION Of LO1 J Of SEC IION 6, TOWNSHIP 2 NORTH,RANGE 1 EAST,BOISE MERIDIAN,CITY OF MERIDIAN, ® ADA COUNTY,IDAHO II o o E O IM o O I 0 I III III z 2ENrtN SUBDRttStpN I MERIDIAN,Ip S z ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.I —FP-2026-0006) Page 5 of 15 B. Final Plat(dated: 02/20/26) PL"of Book Pass Zenith Subdivision No.1 •• aawrrtrw.r.rlr,ro.erlr.rtr..♦ A x *..r+ryorrlw�J�Auar trtr..a rrnula lldwa Jrll. �...,.�, ICJo•l Jr.ur•1 Y .,t,b � ran-I r��Irt r A C I � x � :.rlaz.war .... 1 I (� ' '�� i� � • �rc v v.wm n.a.. ,y7 --1------ 11 ------------ 1 I II y r�.i�' �' .1 M I IYew r0 W rM•rO I II ___ 1 ■1' )yI �mn 11 !E�1 ■ ��� d'� I I r Ftl I I' {(■35 i r .•av r rw. �•..ri.om s nY m./r,rr _________ II 1 II . II � }ar I ,wr,/► • �� I /� --______________________ r rr�Jnw wrT u.rwS rx .. r -r____-_____ rr o,�r�` LPL+y:� fwrltrwoe ____t_____ �� � . . I M•.w,•«r rwe•+r a.wa,r rw«.w r.s �Trr � 'r __�T_______. I � ro.:emrSa r,mta am w,•.ax fwn s[rp.r 1 M. �"���.'�.rlY11Y r _ _____ _-.. ___ _________- �•�� satyr ,awr w..r,rx >.Iron 11�59 � w• _r.Yv . r/• km 1 x W.vY rl rwrtlw w rtw ww — 1- tl'It'► — ethtott CorpOfdS n ~_ a'K rrl•..ra. t ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.1 —FP-2026-0006) Page 6 of 15 moo a, of ® . .,�—�' — p� � Zenith SubdivisionNo.1 -�`>mow:. .� - F— F 05 . t tv + • , n�t% ` yr '�.� 'nxLj`�riv..SlKd r}y�'` �+ :Vi 1 • w• ..r ' 9 wrw�es w t -------------- k3m r s • 1 4 —-_ - &i"..Corporation •- —__ ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.1 —FP-2026-0006) Page 7 of 15 K"cf Beak—Prue Zen lth Subdivision No.1 [W IFw M-0rnr. Ifii u�xaR Y ti Y®arO[ri ate�x�l.i.'Jn lower[ i.�r aau. •w My.a[srr[a o.�a ar xa a..R��+w r a[rJ'+.Yw1 M•�QK[.1Yay!�[nl� wl.>r.vl�R r.r.•rx.•�.rrr r r�a wr rw�w wwwn rw r.�....,,r,>n m�.•.ra...,��r.r.J�. [n-.n•r�.[�[[�aoun.r[r�wr r w�. lal[[YraC.[JeRI �Ir_ww ae�•ava a.-.�ew�N.�.��.aseFx.R..s. maw. �ulF nft rela��ld R:Fr.nw Y.��wrr�i�aA[��n Yw w� rr..•�.�a'y��zaeA-wJr ftr�it lwa .a - � •eM�tI SR[.�W a•C`J . Yr •.x wn[a.nclrnfl..r ora w.yaL.i 1�RJl.y.•jnn j.N wi Mb�..�i+V..V4[li.+[[i�41a�1i�1 �•J)"...a��rm�a...ar.s`u aoa�e.a rt a+r ae'w¢a xwa r ar ea N r w II.Yaa�.•��ww a•r.�w..�i.��.�w�,~ww.�w..w�Tri Fi�!ealo •t� ��a¢rsa�r.yy.�-.a.. _ wM•t wwnFM.��iK#f.l yl...af+[ �•awa4�h�.1��•rua�n wu+E�4R arR • i�[.eysii uw YliiYFad qY ' nnr w.c MYw V. •4w.w alwl �..�.r IM•wl.+• nl i��NI�.w�..[r�uRil�SFr N.[!4[Wa �r:+v y r..rt nI*r•f�erw a Ral+r+la r+m n�nn rr.a as ruai Y tia 1RIV�qi i.ra. �aK+R YRn•m'olvl�rTP .4Yf•rY[x.wo.a[a�vns r„��4m~-+^[.Pw..r.•a•Nrrrrw aM II •e e�r W r•as NI 1 a.fl a Apra .,..x naM.r..ap[.l.rr-� •.ice Ir nl�� w.wl�la b r[IY�.al y r✓.iay M N'iaa IiM nl M[YlYw11 I+y..r 141TN Hi�IJe Ph J.•a— [i vlw X[.S[ 11111i w•IG1[Y[ •r4 r 4YRf�L�.�[1'��F 4RRPa�x fwa rlli�ii` i Y f• �.•w.w�r r n�w�•r�t m�ti.�%P�n r�Y.i YY V%aµwOluaS.wh�a r u..as u•�z�iuiadrox�}•Y �� Lrd�Ln —� y-%l�l' FWF'X i�T9 k3nn &[ghtwi EmporaLmrl W,.i_-.w ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.1 —FP-2026-0006) Page 8 of 15 r41oi Book Zenith Subdivision No.1 M�'!xP�FdwrFFFFFw FFrF[T aar�Prw 4lFrIn IFG4lF ,"W'^.:"'a w.w..br..xr...............r... M.OYY a Ml.lFlrrm e1GMrM km M.r.a..a r,c. a xao�.0.a. w.0 dIAGVt P WVR.TFERPFIIr • Iw Mr.Iwr .�.Fw.. IYw r1Ys.•..rp•• � �MPF�wrcm ""'rr•'� u..aw m.-..... ....a w......mow�m. GF�1[M d WIN�r4lMN.0. Li+•�x•�r•+s�i•r .n wa xr 1ie�M�f�.tic lK NY111 rRA H •-- 8nghton Corpo aeon ware ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.1 —FP-2026-0006) Page 9 of 15 C. Landscape Plan(dated: 02/20/2026) - _ ��e_ ssen can cucuu ors — SLIM !zTT:n- /]1LIINDS-PE PLAN — m:a�� u° � ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.1 —FP-2026-0006) Page 10 of 15 u�=�`t�3 � ^'?.ix ,a•ir r:�.i•'s`•',.a -sn'_ =ra. -.K•c=. .w =_>~=---__• 13• •v. _.r OR ^' yL"'�•^ Li:9�.�.'..: IS.^'S�.ZC^T' -=:-i�oR'zss:r- a���-szrr.' •er.ras---..-^- -'4.,J3ri.'.x•Lu=Z•� '�r,�•�.:z'sc+c-'.r—n MR�..�. ..3'. •a'1^.S �'�.13sa.'ilG77'�. ..'''fff���ff •�'^'.�^s 7ti��'YS•�•y"e�T.S�Y9Lr:S�.7' 03 p.8`' - ...... S'�REQLJR9LNIAI4lL�h .Fm' .�...e,..m.......,.... _ _ _ ._ 01*,RERroarnDNaNE MI. 02 Deciwoui+.eERwn www s�Na D1 04!rvRg _ min - •- - .._..._:....� 'I � —.......�....� _ mow-- •�^Y.� km 051to-v,Wq%A+E rRFA1N1[Mi(RQSEEEEI!Op!YRiI 06w.t NtR:WIMPS WffiflkUVN 0 7..R6.E DII.OlHNDOQf11[CIgN Y l30 VI. CITY/AGENCY COMMENTS &CONDITIONS A. Planning Division 1. Applicant shall meet all terms of the approved annexation(H-2024-0052,H-2025-0041 (Apex Zenith); Development Agreement Inst. #2025-010344; applications approved for this site. 2. The applicant shall obtain the City Engineer's signature on the final plat within two(2)years of City Council's approval of Apex Zenith on January 6',2026 in accord with UDC 11-613-7, in order for the preliminary plat to remain valid; or,a time extension may be requested. 3. Prior to submittal for the City Engineer's signature,have the Certificate of Owners and the accompanying acknowledgement signed and notarized. 4. The final plat prepared by KM Engineering, dated: 02/20/2026, included in Section V.B shall be revised as follows: a. Provide the license agreement from ACHD and ITD for landscaping within the transportation authority's right of way. b. Add a plat note or reference the CCR instrument number for cross-access and maintenance of the private streets. ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.I —FP-2026-0006) Page 11 of 15 c. Revise the plat and landscape plans to include the dimensions of the pathways. A copy of the revised plat shall be submitted with the final plat for City Engineer signature. 5. The landscape plan prepared by KM Engineering, dated 02/20/2026,included in Section V.C, shall be revised as follows: a. Depict landscaping within required street buffers in accord with standards listed in UDC 11-3B-7C; all required landscape buffers along streets shall be designed and planted with a variety of trees, shrubs, lawn, or other vegetative ground cover. Plant materials in conjunction with site design shall elicit design principles including rhythm,repetition, balance,and focal elements. b. Revise the plat and landscape plans to include the dimensions of the pathways. c. A tree is required every 35 feet along all street landscape buffers. This includes along the 10 foot landscape buffer along private streets. This shall be depicted with the submittal of the FPS record. 6. Comply with all ACHD's staff report conditions of approval. 7. The subject properties shall be subdivided and phase two (2) of the Apex Zenith project shall be approved prior to the issuance of any building permits within the subdivision. 8. Provide a detailed maintenance agreement for the private streets and how the Costco property will work with the subdivision for maintenance of those roads with the Final Signature Plat application. 9. Each lot within the subdivision shall submit a certificate of zoning compliance and design review application prior to submittal of a building permit. 10. Depict bike racks and pedestrian connections on the plans submitted with the future CZC and Design Review application in accordance with UDC 11-3C-5C. 11. Comply with all of the private street standards listed in UDC 11-3F. 12. Upon completion of the landscape installation, a written Certificate of Completion shall be submitted to the Planning Division verifying all landscape improvements are in substantial compliance with the approved landscape plan as set forth in UDC 11-313-14. 13. The preliminary plat approval shall become null and void if the applicant fails to either: 1) obtain the City Engineer's signature on a final plat within two years of the date of the approved findings; or 2)obtain approval of a time extension as set forth in UDC 11- 6 B-7. 14. Staff s failure to cite specific ordinance provisions or conditions from the preliminary plat and/or development agreement does not relieve the Applicant of responsibility for compliance. ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.1 —FP-2026-0006) Page 12 of 15 B. Public Works snr. t:13r431110NN: ikl:H FILPL_(:SH41)M MS: 1. SLwud}• ki zvkLUhle wa eliNdlm ad ffmmm*nimi—.d,alum La Me dwelop w!)L iih upplu:ua shell m dr bads to and trough dhIs suLdl4e{KiI..W pI—a>hdI eaardJobte main• -i.ld f.:u[.lip'w.rh the F-9.Iw Wade;IIcp ern:.and:ti tie sr u.da.d I.xl.s. ad cia riu Kv ere}� Iha plc J.qu.ced io pra„iac is i4 MIII....ud.L.4U t Y:f y of ImLfo IS duw ker,N WNtI 1foni lup 09 JjW 1h wb-gRdC 6 L—a zriL ihitLc Intl Inin afLYlluk' asd Lruk skal be'aa In KMinmkKe 4t i.yy of Mendran PL"k Wurkr IkL•pomca Jns Sainllanl Kpeld—lump 2- W112-I>!`—t Mttn%SLIM MWYar11IIL WIN t3X-d%mrl d4t)ILUagi"M a�pdemtmUre d['eelJprucnL lht ap lhl-xJn shall be resp'.lrrrble ak msmtr mmwr mures m and cbradgb tm demelnm.'a; c"dIIIa4 main si5 and r.�.Bg lYdil Fuh11e Woe" 3_ All onprevesena refund tr[ratllk Mitt`,safely ynJ[Ilea=shall tx mniplmcd pnor w arvupkM) at ix shr[Ers.W hem bpEdmx d by the illy Englnou,an owner may prd[a pkrtt+[osmLt eurary lo[and mrrpeove rNmb r order sa dlrhNN[:rty flirt c[ m thu anal plu err set Kwrh Is dp U"iebitlillm at me landsxaping Nod poor 14 mspdevoa by PkanLy8 I1epaRnra autt,ehc ap96ea3i shaltpn".de IIuTNdeo�inc al arripiml Ns sc[dodh mUL7t t i-llt-l4L S. Ar Lather ad uedn 4a erA mwct• In she unlmer A i IU%w111 M raphrotl tar as u[delplate h5muM•1kbsk;capol&, pn W slgastam oadeIlad pldL a_ Mlle Liep nr Marrdrsm eerpsucs t6u the wmaer p0it WJth the❑dy L petbneanee curet} In be amowd al L25%of ibe-fatal arduhlydhan coo Itd all Liloomp6w maw,Metier Inhumuelure ldwd m fk d p6d zi@ Thin uL"niir be verllled by a Ire Iteea ecdl ortrmme pravld3d by me area mire L*. lie mKiwN shall be regaLred m eaNee iiiiiiiia a Lk—jupmeot%,Le ngreeucn[ w+h dkr Litt of -'---.eta`safety{ill rrt pad"Ie lie mm or m u Lw4 ble woier orSMILIL aRM mar.--. Applw a[mlm Mlle a appllLmdr tos swrEy,whth Lan he Mend oa de LGMs=st-j Llhtdepmeti 11'ea Lo[atitrraic. rJeare�[Land Ueveklpmerd lenrde Ikrr ran laraemM&M rt W-M I I 7_ The LkKy of rY.mdm rhpmn Vlyd me owner pace m The 1:9y a tranarny surer}In rtrt sma u err 2M ai'ie 111b0 MUbUCLIM Ludt h3J Al C mplowd w-*er,mW vami Ialragbucame tkY a durwho* Milieu}leaser MAh wren•wwdn[w111 he 4ahtktit by a Ilse der hnit Lrd[m4a4,nmg provided by die aaa3r m the Chy.'rte sUN-L)e. he pf Ld.L mt warm n1 as InevoaaAe iener u•t arnhr4 Lrh elcposn ar Loon.ApplN3aed fti` hkr an applL.alluo dur surerY,,arum Lae to 7aund as ee {Claw—My Lle-fiopme•e L54.uvl 1�wtile ar. Fkase a�[I-And Llte MLkpr W Sen Me Dame and or .a at 7a I-2211. M. in the cyto duz Nn appr[ann rsilar owns uAnii.w eompkde m n-klR,naeaulety and rim-beiddii Ymp� -pr10[m i.12TY llgki er nIkol a WI Ibu hnd p1u a Vur prnlr W Iw Cupaaer.a x.3reay ggreo niwy in appf.r W re.ere[tons. IIIX'13-el:-N:. 4. AptllNan[ahrll he e-julltd La LI.w FWIbc Wwics dcs 4bpnlam plan ee3rins. LW unn3dllYedla msrdc ikti.—JualI oi Ju[Ing Irm plan i-s p[az`ss,prior 1.5 irr Ilivah[r of a plan ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.1 —FP-2026-0006) Page 13 of 15 approval horn. I V.tt Ahal br V.e rcpumdliWy M 16e gnMCAllt ua crnbLc miU all deYtlOpnldml deu.ns crnuµly w.dl WtAmenuurs viiih I.Walill6ii Am aed Ve Fa llnus.rnr A.L I L_hpplxlwat shrM he rempomubile Par gVKm io tr.d citDpliar.ce widi any edam 41M lr Yin mry to regruei by die Anny L'aaps at lik.�. Il_111ewrfi p S&Wl a wardjmdz mulhaa k+cailrns W)dh Inc MUWLit F.at l Ytllri= 13_Jul Sr"ofdir��&Wtrpertamad.ncMMrnvu> wnhMtX-Ir-L-ca Id.tlnn.parmo z s Lam shin W SJiniined m dw Mer.4rn Lla.Ld1nJL LklrvtneMtTW all baIWN pads Fa aivEg dnt3 cmd htkfal.wl Gd I.xxlnp,,Fuld sa swap till ennead. 15.'JM cgineee Shill he saqui-'d iu.erol}lhae wh.wR cdnmi lln.Jftdb a are id a in.iwii 11.u1 3-t�ra'huM�wh�l,lghaw dalabl.sheJ p.slr gruuodw.wrn�l�vitlnn Ihuwto-oasur An ih.s.Aarr. aleviwlwi al lre[nw'I Spaddi fie Mir.di 1i W}case I-KxA aM st•. I G 11 ipp.wiL Jel..g1. ellger.sr �Uii Iw r p.wiubk Kw imgn Aws of vl imiigkilwl .uWhsr abin.gr ll dilay wuhln 1h.a pmjar lh.a d..va Tall.W. 1hd 3u dwr n of as lelgaeaa Jdnrxr M AU 113.'17c ilm Vh [shah Pr .J utn.t,cwno whm Me 11c11rha Marc li. .r laIIW In. QccoWtocc wmh1hcappfi+.vd d=iKa plain..Illixtdrnnv.t.nn will k requ.md heKvu.rnialie ad maps ky is artvef toe say s7uvn.ld7.WiC..11 dnLL rWlyKL 17.Ai the a,n.pldme tJ Vic l.rgeeL.1W gpI`A u xha51 bL rexp:uc,ih4 m xuh.nn reemd.LrAwirW p.y d.r l:Ity al Mcr.Ju.n.huar{',1 I}xii.oduda. 3hrsu iLice"drawilio nWA tic rc,_+r,tkW oral appriivtd pelt!tort.r aiure._e hFidernii:muAl III.+..2 upin.v KraL.43 LLiurel,htv.Ill c!prl.laLr. IM.Mist bqn plan requlr"nv uu IisaJ iu 5iYzui.w f.-'f.it Crr LmpRiwiaeat irandai"I..r Suota I.Stwmg{Llrytlrvrwr.rotyw Jranvlty.urp,+In.l�I.. ,%wrr.agWeld ?f?l. All gnxLi Iighrs s3wL1 be '-„ad mJm-eWgws expanse. Einad design nu I he summiad is pul of the dewMpmad plan sut(or approval-whrh mils roclrdrllre h.Laemn odes}citkinp Mb lights. Ilea cave IlWs work and mudniaJU shall .vilk m m whd 1%'II 'L' and tar i:.rr a7 lvll t d Supply izj tipaNlaawlans to the LXI1WI_ UQMa c art• Cily ai McrWiae lrlrapdrutlaa .Ad llollry S'n.'rLM1tlrr J<7 55UP iar lnJLWilidlaa.0ll[l&1tid0NR:4YaKM kStfLKi lighl2na'. 19.lht applldaet shall pia idc lay Wl publr wner ,a a.,.a. lwt%..e.gbt or way frelarr all uvikr scraxes list hyidrurW. lira ciii rot t w.da4;....I rrt M-ten Rldd Mr a xlrrgle L1Mrty,ar 30.Fxt wide iac iwa The auemanm shall rkK be dada: od via The plot,but raLhiff=_ oLilsidc Iha pLu Feooex using dhe Oky of kletid}xL'a sei-k, fermi Lhe carmaeni stall he cuplk catty Jryxuted an de plan hw reJ&en.ti purpaacs.%Mniil art tLx&u" �i wan dL-lrrm Ata.Nh1a Ram Nulrlld WL%Ul.A kLpI dd uptll.n preparL,t bl.n Uffh L�easad FraltssrniF I-kW sunrya. wtxb num incba&lad a mt arc�w da ku d EginBdl'A�and m MI fit"x 3 1"neap with begin urri dodi &{evrw.md FJf 1 LL6d F 31)for revive.HoM rnMab.0 emd b{weskit,signed tad daahl by i Yxikl trmal UW iurvawar. 1313 NOT It1:IZ3R1}_ Add a awls to the put reletcocng mr dCeLtlh'aL All.tasenw Fu arwt W vtmwloaik reelataea�and gwgra.ai pear isS iaaLfd dY vie heal potby V.rlimyluwglrimr. ill.Appluant shill bd respdo;rrld 1Lx appplidulrw ae.l rnraplaladd wnb ae.L NFllF1S ptnwllwp,that maybe rblLhv"by intlin-Pu.ruLatiwuL Pmw:&oswa Agdoey. 2 L.Aay x Lb mm rill sow wld.aud a.W u.od False bd property atand4nad W-A"m IJzhd Well. Llr"Mmelme `larYseds U." LWm 1=L d by cW ldabd l}cparenxw nr wurr R� (lydWKk '11=Lkyelciper,Uvinci,l.r pm)eci Frguirtt. LkWL provide A ;aDm5 ni Addsmmg wMtlhrn 13xr.are Fay elnnalnK a,dlls W die ele.alupmrnS and if M..bane ills}wW e.amOtOae ID M Lucil,w pmvi&recrrd W der ahu.il.fl u L If wdrs arc m rrc awann�the pegeee owmer w rte.r rgxdserrtanvr r crmtadl the 11}WR lipf—rkd N Pooidcuw Beattie kharai rlci a. 11ydwtwp}Ja*,lm 2aM-2M'4W2i HE FORK aey wnrlr Is lone m dad Li;zi N m misting na fdvee nY rl a hchewad vial ma ,sere is lass wilt YM M dddpp.rto r ofcameoanaamao weft MMK �ra`sahmaaeE is OtCiry piiar m3&y vA3r3L trtlnFt Joao m decaewmraami the welt pFLkiee to eooimimuute waft II3W K reay resins La addLion.1 wkrk and Upeme m cleiammwuea trt wJL 22.Amy aMtsvng syrci:AS%mm}w0hio chic prajae ibaLF be rdmavad rtr.m wriest per S.iey llrmuu^^^ 2'mbom Y-1-4 aad Y 4 M. Liter she(;Meal Uiln w HaLkIi lkpubwot Ilor obuhUeriral ptoobUver ud iucpumoos. 23.lht CM of Mend,=impum&W p_&mwrd rngebm gzlcmt be ulwicd ty s year{aum anarce of winder(UM.31-311-&)L*Yr aWK L ni xhouhL to regpred to me s1FX rffird s w1kot ar weir uwu tar ih rAtiow"mmbe If a s...+L.e ar weM sauau er Fart aluYhle,s saihoe-poW dmnu.c..n IX-Th..Maier}W-A--sY.&M Shall be mquired I ra slrrglci.oint conaft3limv ukdh:e,; Me d en.ytir x.11 rrt respoaelibe{for Vc paymao a1'IreeBlrrraads err the comarr aaeAl Ploy m &eY L.pn-A planapp--L 24.All ongwlah LLbklkx,tanaiii. Uvy",r.r dr"r.s, !melauve or Lutttrvl wniksw.ay&1mbsrdebed, is r ieg rn Laying adlarrnt wW["a.pp.w.a,iW arcwfcmM r11LXbaniffiei rare tr addlerunf per lll]S:I L-SAA. 3n perkxn.ing su.l.wwxk.111.affpFr.rot shalt amply w16 lase U: k 42-121107 ■m u.y Mhud"hK6hIL law tar ul.a...I.. ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.1 —FP-2026-0006) Page 14 of 15 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR(APEX ZENITH SUBDIVISION NO.1 —FP-2026-0006) Page 15 of 15