Loading...
HomeMy WebLinkAbout2026-04-09 ACHD Miranda Gold,President Alexis Pickering,Vice-President Kent Goldthorpe,Commissioner CHDDave McKinney,Commissioner Patricia Nilsson,Commissioner STAFF REPORT Development Services April 9, 2026 To: Linda Ritter - Associate Planner, City of Meridian Emily Muller-Owyhee Holdings From: Mindy Wallace, AICP- Planning Review Supervisor Subject: The Fields MAS26-0001 Annexation and Comprehensive Plan Amendment Introduction The applicant, Owyhee Holdings, LLC, is requesting annexation, rezoning and a comprehensive plan amendment approval of a 480-acre mixed use master planned community, referred to as The Fields. The Fields is located west of Owyhee Storm Avenue and south of McMillan Road extending to Can Ada Road. Vicinity Map 7. yin l� a� ,3 Y connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID-83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org The Fields is located within the City of Meridian's Fields Subarea Plan adopted by the Meridian City Council in December of 2021. The Fields Subarea planning area is approximately four-square miles and is bound by Ustick Road, McDermott Road, Chinden Boulevard and Can-Ada Road in northwest Meridian. The Fields Subarea Plan is intended to build upon the vision and intent of the 2019 City of Meridian Comprehensive Plan; continue to grow the employment base; and integrate high-quality neighborhoods, parks and pathways, and schools with a mixed-use activity center to serve as a hub for surrounding neighborhoods, and integrate neighborhood-scale retail and services, office, civic, and park space. Concept Plan _.. 14 13 _ 12 DAD NII s - IL 7 FIEL PLANNING AREAS The intent of this memo is to establish standards and guidelines for future preliminary plat phases within The Fields master planned community. As individual preliminary plats are submitted within the area, the Ada County Highway District (ACHD) will provide detailed analysis of street layout, street design and construction, and will be a signatory on the plat. For the current application, ACHD is a recommending body to the City of Meridian. connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID-83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org ACHD Comments/Recommendations 1. The Fields Description The 480-acre site is anticipated to be fully built out by 2040 (depending on market conditions) and is proposed to consist of the following: • 2,367 residential units • 890 single-family homes • 405 townhomes • 1,072 multi-family dwelling units • 329,000 square feet of mixed-use commercial land uses • 48 acres of industrial uses • 41 acre city park In 2040, at full build out, the traffic impact study estimates that the site will generate 37,571 trips per day with 3,145 trips in the PM peak hour. The traffic impact study estimates that at build out approximately, 3.6% of the daily trips would be captured within the development due to the proposed mix of uses. 2. ACHD Planned Improvements Due to the site's proximity to ITD's SH-16 extension project and ACHD's acceleration of widening and intersection projects in the vicinity of the site, some of the site's frontages are currently under construction or will be improved within the next few years consistent with ACHD's FYP and CIP. Most notable is the 2026 widening of Ustick Road to 5-lanes along the site's frontage, Phyllis Canal to Owyhee Storm and the widening and signalization of the Ustick Road/Owyhee Storm Avenue intersection scheduled for 2028. A complete list of programmed improvements in the vicinity of the site and maps is included as appendix d. 3. Traffic Impact Study The purpose of the study was to provide a planning level roadway and intersection analysis for the full build out of The Fields and to highlight roadway and intersection improvements due to site generated traffic of the master plan at full build out. The traffic impact study area for The Fields master plan includes adjacent roadways and intersections and was extended to beyond those to allow for analysis of all the traffic impacts. The study area included 8 intersections and 8 roadway segments as shown below. connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID-83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org Traffjc impact study The Fields SabdMskn October 2025 Meridian:,Idaho Figure 1.4-Study Area Roadways and Intersections Gall mcjNrYRE MLL v , taYrilr __-.• ;; 1 If Mc�fllLae Rmd ..- — : a 6 ` k 1�iri�izab L - Ap s.aYra �' ., . R r :. k _ ZANY) = ,1, � . ._ ..5 ti� 1 _w•t .i _��+*arf C ek - �r J ' RKigtNrtH 1--kilnRrd (•g'. 30 r FLmpu I ,Hampd'+ kiuneip5l �- I t tl - Le taid: Collector Street Minor Arterial x�Cc�� ------- SR16ExNnsion As noted above, the study evaluated the developments impact on the study area intersections and roadways for the build out year 2040. The traffic impact study also provided an evaluation of what improvements may be needed beyond those planned in ACHD's CIP. The tables below include the intersection and roadway segments in the traffic impact study and note existing travel lanes and intersection configurations,what improvements are planned in the CIP and MSM, and what improvements would be needed beyond those in the CIP/MSM to mitigate the total traffic impacts of The Fields in 2040. connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID•83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org Fields Subdivision-Roadway Segments(2040 Total ThafKc) Lane Configuration Roadway Location Existing CIP/MSM TIS Needs 1 Can Ada Rd to Star Rd 2 3 2 2 *McMillan Rd Star Rd to Owyhee Storm Ave 2 3/3 5 3 Owyhee Storm Ave to McDermott Rd 2 3/3 3 4 US 20/26 to McMillan Rd 2 3/5 5 5 McMillan Rd to Collector St A 2 3/5 3 Star Rd 6 Collector St A to Ustick Rd 2 3/5 3 7 Ustick Rd to Cherry Ln 2 N/A 5/NA (Canyon County) 8 Owyhee Storm McMillan Rd to Ustick Rd 2 N/A 5 Ave I *McMillan Road is show as a future 3 lane roadway on the MSM, however ACHD is preserving 100-feet of right-of- way(5-lane)along the McMillan Road corridor. connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID-83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org Fields Subdivision—Intersections(2040 Total Traffic) Build-Out Total (Minimum needed Existing for ACHD Intersection Configuration CIP Configuration Thresholds) lO Can Ada Rd/US 20/26 3 x 2 TWSC No CIP Improvements 8 x 4 Signal O2 Star Rd/US 20/26 7 x 4 Signal 8/9 x 7 Signal 9/9 x 7 Signal SH 16 SB-Ramp/US 20/26 6/7 x 4 Signal No CIP Improvements 8/9 x 4 Signal O (Under Construction) SH 16 NB-Ramp/US 20/26 6/7 x 4 Signal No CIP Improvements 7/8 x 4 Signal (Under Construction) O4 Star Rd/McMillan Rd 3 x 3 Signal 2 x 2 RAB 3/5 x 6/5 Signal O Owyhee Storm Ave/ 2/3 x 3 Signal No CIP Improvements 3/3 x 3 Signal McMillan Rd O6 Black Cat Rd/McMillan Rd 2 x 2 Signal 2 x 1 RAB 3/4 x 5 Signal 2x2RAB Ustick Rd/SH 16 SB-Ramp 7/8 x 3 Signal No CIP Improvements 7/8 x 4 Signal 0 (Under Construction) Ustick Rd/SH 16 NB-Ramp 8/7 x 3 Signal No CIP Improvements 8/7 x 4 Signal (Under Construction) 08 Franklin Rd/SH 16 7 x 4 Signal No CIP Improvements 7 x 4 Signal (Under Construction) Based on the information provided in the tables, ACHD's planned improvements are generally consistent with the recommendations of the traffic impact study. However, additional improvements may be needed at SH-16 interchange ramps (intersections 3 & 7) and are not currently scheduled for improvements by ACHD. ACHD currently has no plans to widen any of the study area intersections or roadways beyond the planned improvements in the CIP or the lane configurations identified in the MSM. This is consistent with ACHD policy 2106.7.2 Arterial Roadways Constrained by the Master Street Map, which states that no mitigation is required on roadway segments built to the lane configuration identified in the Master Street Map (MSM) Planned Lanes for Preservation. Roadway segments built to the identified maximum lane configuration in the MSM are not considered for widening. connecting you to more Ada County Highway District•5800 N Meeker Avenue- Boise,ID-83713-PH 2O8-387-6100• FX 345-7650-www.achdidaho.org 4. Phasing Plan/Future Traffic Impact Studies a. The phasing plan provided as part of this application shows that The Fields is planned to be constructed in 18 phases over the next 14+ years, depending on market conditions. The first preliminary plat within the development is planned to be 200 acres and includes phases 2,3,4,6,7, and 8 on the concept plan, consisting of 901 residential lots and 43 acres of open space. A traffic impact study with specific findings and recommendations for the first preliminary plat was submitted to ACHD for review and approval. I _ 1 I 14 13 � ; 10 10�� �C _._ . ;� ' P LLL f IEL PLANNING 8RF6S f *First preliminary plat = red District policy 7106.7.2 states that for large scale developments, like planned communities or specific area plans, ACHD will require that a phasing analysis be submitted with the initial TIS or with the first preliminary plat submittal. This phasing analysis shall include the size and type of the proposed land uses within each phase and the anticipated mitigation measures necessary with each phase. b. Comments/Recommendations: Consistent with District policy, the applicant should be required to provide an updated traffic impact study with each phase of the development. In addition, a TIS should be required with all development applications that include a change to The Fields master plan planning area that may alter traffic connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID-83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org impact projections, at the sole discretion of ACHD. All TIS submittals, including updates to the TIS must meet ACHD policy requirements at the time of submittal. TIS Update Requirements: An update to the TIS should include the following items: • Updated traffic counts for the impacted roadway segments and intersections listed in the previous TIS; • Information from the built development to date, including actual traffic counts and actual measured trip capture; • Projected trip generation, trip distribution and assignment, and anticipated trip capture for the current phase under consideration (preliminary plat application), based on development of the applicable land uses; • Necessary mitigation measures for the current phase; • Updates to all analysis, conclusions and recommendations found to be out of date or in need of correction based on the updated information; • Meet all ACHD policy requirements for a TIS at the time of submittal. 5. Star/McMillan Center— Fields Subarea Plan The City of Meridan's Fields Subarea Plan identifies a portion of the site along McMillan Road that extends from Owyhee Storm to Star Road as the Star/McMillan Center. The plan notes that this area is envisioned to be a vibrant neighborhood center with destination retail and place making uses. It goes on to discuss main street style mixed-use buildings and focuses on pedestrian-oriented streetscapes with large sidewalks, bike facilities, and pathways. The plan identified a new east/west roadway extending between Owyhee Storm Avenue and Star Road, 2 entry roundabouts, and north/south roadways to intersect McMillan Road to provide access to the site. connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID-83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org 3 Mchll�u�H Roar p athway alo�sg�e:pa�e. Greenway i Mixed llsr Urban Housing(e g. Parking apartments,condos,lofts) Anchor Parking Commercial MAIN-5 REET MI%ED USE ID O rf Urban Housing(e g. Parking apartments,condos,lofts) Oeiway-Orented �- Potential �. Ene Site (e.gerecreationl,�� "a'r- :arc :ee;r •; cammunity�censer,lihrar'y) Higher Density, yi her Density, Higher Density, Greenway-Oriented g Ty' Greenway-Oriented Housing Greenway-Oriented Housing Housing The applicant's concept plan includes a north/south roadway cross section (red)extending from McMillan Road south to the east/west main street style roadway (blue). •a `# * 10 The cross section includes pedestrian zones, separate two-way bike lanes, 2 travel lanes, on-street parking, a mix of landscaping medians, strips, and buffers, and an offset intersection with bulb-outs. connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID-83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org STREET SECTION A SEATING CROSS PLACEMAKINGI SHOPFRONT CLEAR NODES CONNECTIONS PARKING CLEAR ACCESS WALKING I- - - - - -I 3� WALKING ZONE ZONE i I DRIVE-THROUGH PLANT PEDESTRIAN m BIKE m TRAVEL MEDIAN TRAVEL FLEX TREE PEDESTRIAN LANE BUFFER ZONE LANES LANE LANE ZONE PLANTER ZONE 23' 11' 16' 10' 12' 12' 12' 8.5' 10' 13.5 CONCEPTUAL-SUBIECTTO CHANGE Staff is generally supportive of the proposed cross section for this segment of roadway. However, there are safety concerns specific to the transitions of the separated two-way bike lanes to the adjacent bike facilities and the width of the planter strips/buffers proposed. The applicant and the city may want to consider a wider pedestrian zone to include bike facilities, and all planter strips/buffers will need to be a minimum width of 8-feet and landscape medians will need to be minimum width of 12-feet if street trees are desired. To be effective for traffic calming, bulb-outs will need to be designed to align at the intersection and provide a minimum pavement width of 24-feet, measured from back of curb to back of curb. If the roundabouts shown in The Fields subarea plan are desired by the City of Meridan, then they should be designed and constructed as single lane roundabouts meeting ACHD policy standards. The east/west mains street roadway (blue) should be constructed as a local commercial street with 10-foot wide MUP or concrete sidewalks. ACHD will coordinate the street section and amenities desired by the applicant and the city as part of the review of the preliminary plat for that phase of the development. 6. Owyhee Center The applicant has proposed a mixed-use commercial center located at the northwest corner of Owyhee Storm Avenue and Ustick Road. This area is identified as a Mixed-Use Center in the city's Fields Subarea Plan. The plan does not provide a detailed description for this area but does note that the land uses should not complete with those in the Star/McMillan Center. The concept plan shows a driveway onto Ustick Road and a local street network that will provide access to commercial development. Ustick Road is classified as a principal arterial roadway and will provide direct access to SH-16. ACHD policy prohibits direct lot access to ACHD if a site has frontage on a lesser classified roadway. In this case the site will have frontage on Owyhee Storm Avenue, a collector roadway, and a new public street, Echo Ridge Street. Because the site will have access to 2 lesser classified roadways, connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID-83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org ACHD does not recommend approval of the driveway onto Ustick Road for the Owyhee Center. 90VVAV%N6' THE FIELDS OWYHEE CENTER VF f INTEGRATIVE 4' •� -. a.rn rr.ir.r. L r� }-� PATHWAY AXISJ J J JJ _ MTEGIIATIYE Ps" _ _ ,� PAINWAY 4 - — --R is cz +� PILALA oPTH.xIR � . PATHYulrs _ nRluu 40 _ 7- P — PLkz.k PATHWAYS Wyk.. �.,� L " T ■tIKLA R IHIINiIM�A�I{TM1 The city should ensure that parking lot drive aisles are designed and constructed to provide adequate site access and circulation within the Owyhee Center. The concept plan for the Owyhee Center identifies an intersection on Echo Ridge Street as a central axis point connecting the residential and commercial uses in this area. This intersection is offset and would not meet ACHD policy. The intersection in the central axis area should align centerline to centerline or offset by a minimum of 330-feet. connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID-83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org • s• s r s• • r i•s.......s s. ■ ... ... .... .. . ............ •s• CENTRAL AXIS [QFiFF[T7pN Fpfi . 311CLE EANIILY LIVING i ExrLNbM WD0R COMECTOON T6 N.OWYHEE STORM AVE. FAKMIN61N6 NODES ...••mLucrtrxic I� - EFk{NSN,7FhG � OGiNECTFBX TO Accp—MLLS v E.l7kIME11[LiL ARFA f[1Ff F-rlMl cIlPF4t rP{ 7. Arterial Roads — Ustick Road, McMillan Road, Star Road, and Can-Ada Road a. Policy: Street Section and Right-of Way Width Policy: District Policy 7205.2.1 states that the standard 3-lane street section shall be 46-feet (back-of-curb to back-of- curb) within 70 feet of right-of-way. This width typically accommodates a single travel lane in each direction, a continuous center left-turn lane, and bike lanes. Street Section and Right-of-Way Width Policy: District Policy 7205.2.1 states that the standard 5-lane street section shall be 72-feet (back-of-curb to back-of-curb) within 96-feet of right-of-way. This width typically accommodates two travel lanes in each direction, a continuous center left-turn lane, and bike lanes on a minor arterial and a safety shoulder on a principal arterial. ACHD Master Street Map: ACHD Policy Section 3111.3.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway features required through development. Ustick Road, McMillan Road, Star Road, and Can-Ada Road are identified as future 5-lane Residential Arterials on the MSM. b. Comments/Recommendations: Consistent with District policy, the applicant should be required to dedicate 50-feet of right-of-way from the centerline of Ustick Road, McMillan Road, Star Road, and Can-Ada Roads abutting the site. Additional right-of- way dedication may be needed to accommodate the construction of turn lanes on the arterial roadways as recommended in future traffic impact studies. In addition to the right-of-way dedication, additional frontage improvements will be required as part of future preliminary plat applications, which will include, but are not limited to: • Pavement widening • Turn lane(s) • Construction of pedestrian improvements connecting you to more Ada County Highway District•5800 N Meeker Avenue- Boise,ID-83713-PH 2O8-387-6100• FX 345-7650-www.achdidaho.org • Traffic impact study recommended improvements 8. Collector Roadways — Owyhee Storm Avenue, North/South, and East/West Collector Roadways a. Policy: Street Section and Right-of Way Width Policy: The MSM identifies an existing collector, Owyhee Storm Avenue, abutting the site's east property line and 2 new mid-mile collectors extending north/south between McMillan and Ustick Road and east/west between Owyhee Storm Avenue and the north/south collector. i G a_ CG �7 - usTicK so *Blue=MSM Collectors Red =Applicant's Proposal Orange=ACHD Recommendation Consistent with the MSM, the applicant will be required to construct the new collector roadways adjacent to or through the site. The applicant has proposed relocating the north/south mid-mile collector shown on the MSM west approximately 1,750-feet (shown in red). Staff is supportive of this proposal as it will move the north/south collector off of the Phyllis Canal (the road is currently shown on top of the canal), will reduce the number and size of bridge crossings over the Phyllis Canal and Five Mile Creek and it will provide access to a regional city park. It is recommended that the east/west mid-mile collector be moved south at its intersection with Star Road (shown in orange). This will allow for a complete street to be constructed within The Fields between Owyhee Storm Avenue and Star Road. This enables future extension of the roadway on the west side of Star Road across from the site without an offset in the intersection alignment, as the Bureau of Reclamation owns the property directly at the mid-mile which would make extending the road infeasible in the future. connecting you to more Ada County Highway District•5800 N Meeker Avenue- Boise,ID-83713-PH 2O8-387-6100• FX 345-7650-www.achdidaho.org The exact alignment and design of the collector roadways will be determined with future preliminary plat applications. The traffic impact study notes that Owyhee Storm Avenue between Ustick Road and McMillan Road will need to be a 5-lane collector roadway to accommodate total traffic conditions in 2040. Consistent with this finding additional right-of-way will be required along Owyhee Storm Avenue abutting the site. 9. Bridges for Canal Crossings Phyllis Canal, Five Mile Creek, McFadden Drain, Settlers Canal, Safford Sublateral, and Eight Mile Lateral are all located within the site and require the construction of bridge crossings. The applicant should look for ways to reduce bridge crossings throughout the development due to long term maintenance and replacement costs. The District will require that ACHD have approved plans for the all of the bridge crossing within The Fields master plan planning area prior to the pre-construction meeting and final plat approval. Note: Timing of project plan submittals should take into account review times, lead time for precast members and potential roadway closures. To ensure construction prior to irrigation season, approval of the project plans must be attained by January 15th. The District retains the right to modify road closure approvals on any project based on the needs of the District. Construction of projects approved after January 15th may be postponed until after irrigation season is over in October. It is recommended that bridge submittals be submitted before the end of the current irrigation season to ensure the best time frame for construction is attained. Submittals will need to include the street section extending over the bridge to ensure the requirements of the roadway are met. 10.Summary As part of future development applications within The Fields, ACHD will require a traffic impact study (if warranted), provide a detailed review of the proposal, and provide a staff report with detailed information and site specific conditions of approval. No waivers of ACHD Policy are approved in this report. Requests for waivers will be addressed as part of future development applications. Attachments: a. Vicinity Map b. Concept Plan c. Traffic Impact Study Summary d. ACHD Planned Improvements List and maps connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID-83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org a. Vicinity Map qJ Cn Ustick • {I+ Road connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID.83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org b. Concept Plan 12 I! i ., •..s �.� �'�` is r-1 I � 18 • --- � 15 �i - - - - — •� 9 Jf 8 r& FIEL F7 PL4NNINGAREAS 10 IL LIP connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID•83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org c. Traffic Study Summary 7.0 2040 Build-Out Year Planning-Level Analysis 7-1 Under 2040 background traffic conditions,eight study area intersections are anticipated to exceed minimum operational thresholds and need improvements. The intersections and needed improvements are: R Can Ada Road and US 20126 intersection • Traffic signal • Widen and reconstruct the intersection with the following lanes: o Northbound:one left-turn,one through,and one right-turn lane o Southbound:one left-turn,one through,and one right-turn lane o Eastbound:one left-turn lane,three through lanes,and one right-turn lane o Westbound:one left-turn lane,three through lanes,and one right turn lane ■ Star Road and US 20126 intersection • Widen and reconstruct the intersection with the following lanes: o Northbound: two left-turn lanes,Lwo through lanes,and one right-turn lane o Southbound: two left-turn lanes,nvo through lanes,and one right-turn lane o Eastbound-two left-turn lanes,three through lanes,and one right-turn lane o Westbound:two left•tum lanes,three through lanes,and one right-turn lane ■ Signal modifications FiYGATi�FR&G,ZW S Traffic Impact steady The Fields Sr,bdivision October 2025 Meridian,Idaho ■ SH 16 SB-Ramp and US 20126 intersertion • Construct one additional through lane on the US 20l26 approaches • Signal modifications If Star Road and McMillan Road intersection • Westbound right-turn lane • One additional southbound left-turn lane • Signal modifications Owyhee Sturm Avenue and McMillan Road intersection • Eastbound right-turn lane • Signal modifications connecting you to more Ada County Highway District•5800 N Meeker Avenue- Boise,ID-83713•PH 2O8-387-6100- FX 345-7650-www.achdidaho.org 9 Black Cat Road and McMillan Road intersection(2 options) • Option 1—Signal modifications and widen the intersection with the following lanes: o Eastbound and westbound approaches: one lefbturn and one shared throughlright-turn lane o Northbound and soulhbound approaches: one left-turn, one through, and one shared through/right-turn lane • Option 2—Dual-lane roundabout with two entering and exiting lanes on all approaches ■ Ustick Road and SH 1 fi interchange • Construct one additional right-turn lane on the southbound off-ramp approach • Construct one additional right turn lane on the northbound 14.ramp approach • Signal modifications 7.2 Under 2040 background traffic conditions, five study area roadway segments are anticipated to exceed ACHD's LOS planning threshold. The roadway segments and needed improverneuts are: N McMillan Road between Star Road and Owyhee Sturm Averse • Widen to five lanes ■ McMillan Read between Owyhee Storm Avenue and McDermott Road • Widen to three lanes ■ Star Road between US 2MG and McMillan Road • Widen to five lanes ■I Star Road between Ustick Road and Cherry Lane • Widen to three lanes ■ Owyhee Storm Avenue between McMillan Road and Ustick Road • Widen to five lanes 7.3 Under 2040 total traffic conditions, three intersections are anticipated to need improvements beyond the mitigation improvements needed under the 2040 background traffic. The intersections and additional improvements are: ■1 SH 16 NB-Ramp and US 20126 intersection • Construct one additional eastbound through lane • Signal modifications ■ Black Cat Road and McMillan Road intersection • Traffic signal option—Additional westbound right-turn lane Traffic Impact Study The Fefds Subdivisior; October 2025 Meridian,ida}ro 01 Ustick Roadand SH 1G interchange • Restripe the outside eastbound through lane t❑a shared thraughhighl-turn lane at the snuthbound off-ramp intersection • Signal modifications 7_4 Under 2040 total traffic conditions,two additional roadway segments are anticipated to need improvements beyond the mitigation improvements needed under the 2040 background traffic_ The additional roadway segments and improvements are: ■ Star Road between McMillan Road and Cullectur Street A • Widen to three lanes B Siar Road between Culle€tur Street A and Ustick.Road • Widen to three lanes connecting you to more Ada County Highway District.5800 N MeekerAvenue- Boise,ID-83713.PH 2O8-387-6100- FX 345-7650-www.achdidaho.org d. Capital Improvement Plan (CIP)/ Five Year Plan (FYP) The following improvements are scheduled in ACHD's FYP or listed in the CIP. • Ustick Road is scheduled in the FYP to be widened to 5-lanes from the Phyllis Canal to Owyhee Storm Avenue in 2026. • Star Road (Phase 1) is scheduled in the FYP to be widened to 5-lanes from Chinden Boulevard (US 20/US 26) to State Street (SH 44) in 2029. • Star Road (Phase 2) is scheduled in the FYP to be widened to 5-lanes from Chinden Boulevard (US 20/US 26) to State Street (SH 44) in 2030/2031. • Ustick Road is scheduled in the FYP to be widened to 5-lanes from McDermott Road to Black Cat Road in 2027. • The intersection of Ustick Road and Can Ada Road is scheduled in the FYP to be widened to 5-lanes on the north leg, 5-lanes on the south, 6-lanes east and 6-lanes on the west leg and signalized in 2028. • The intersection of Ustick Road and Owyhee Storm Avenue is scheduled in the FYP to be widened to 3-lanes on the north leg, 3-lanes on the south, 6-lanes east and 6-lanes on the west leg and re-signalized in 2026. • The intersection of McMillan Road and McDermott Road is scheduled in the FYP to be improved as part of the Safe Sidewalk Program in 2026. • The intersection of Ustick Road and McDermott Road is scheduled in the FYP to be widened on all legs and improved with pedestrian facilities in 2027. • The intersection of McMillan Road and Black Cat Road is scheduled in the FYP to be reconstructed as a multi-lane roundabout with 2-lanes on the north leg, 2-lanes on the south, 1-lane east and 1-lane on the west leg in 2028. • Bridge #1092 over the Middle Tap Sublateral on Star Road is scheduled in the FYP to be replaced in 2030. • Bridge #1008 over the Canyon Canal on Star Road is scheduled in the FYP to be replaced in 2029. • Bridge #2030 over the Boise River on Star Road is scheduled in the FYP to be replaced in 2030/2031. • Bridge #1632 over the Ten Mile Creek on McDermott Road is scheduled in the FYP to be replaced with a construction year yet to be determined. • Ustick Road is listed in the CIP to be widened to 5-lanes from Can Ada Road to Star Road between 2026 and 2030 (Project#1330). • Ustick Road is listed in the CIP to be widened to 5-lanes from Star Road to McDermott Road between 2026 and 2030 (Project#1340). connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID-83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org • Ustick Road is listed in the CIP to be widened to 5-lanes from McDermott Road to Black Cat Road between 2026 and 2030 (Project#1350). • Ustick Road is listed in the CIP to be widened to 5-lanes from Ten Mile Road to Linder Road between 2026 and 2030 (Project#1370). • Star Road is listed in the CIP to be widened to 3-lanes from Ustick Road to McMillan Road between 2041 and 2045 (Project#1190). • Star Road is listed in the CIP to be widened to 3-lanes from McMillan Road to Chinden Boulevard (US 20/US 26) between 2041 and 2045 (Project#1200). • Star Road is listed in the CIP to be widened to 5-lanes from Chinden Boulevard (US 20/US 26) to State Street (SH 44) between 2031 and 2035 (Project#1210). • Black Cat Road is listed in the CIP to be widened to 3-lanes from Cherry Lane to Ustick Road between 2041 and 2045 (Project#0190). • Black Cat Road is listed in the CIP to be widened to 3-lanes from Ustick Road to McMillan Road between 2041 and 2045 (Project#0200). • Black Cat Road is listed in the CIP to be widened to 3-lanes from McMillan Road to Chinden Boulevard (US 20/US 26) between 2041 and 2045 (Project#0210). • McMillan Road is listed in the CIP to be widened to 3-lanes from Star Road to McDermott Road between 2041 and 2045 (Project#0950). • McMillan Road is listed in the CIP to be widened to 3-lanes from McDermott Road to Black Cat Road between 2041 and 2045 (Project#0960). • McMillan Road is listed in the CIP to be widened to 3-lanes from Black Cat Road to Ten Mile Road between 2041 and 2045 (project#0970). • The intersection of Black Cat Road and Chinden Boulevard (US 20/US 26) is listed in the CIP to be widened to 3-lanes on the north leg, 3-lanes on the south, 9-lanes east, and 9-lanes on the west leg between 2041 and 2045 (Project#0220). • The intersection of Star Road and Chinden Boulevard (US 20/US 26) is listed in the CIP to be widened to 7-lanes on the north leg, 7-lanes on the south, 9-lanes east and 8-lanes on the west leg between 2031 and 2035 (Project#0260). • The intersection of Black Cat Road and McMillan Road is listed in the CIP to be reconstructed as a roundabout with 2-lanes on the north leg, 2-lanes on the south, 2-lanes east, and 2-lanes on the west leg between 2026 and 2030 (Project#0690). • The intersection of Star Road and McMillan Road is listed in the CIP to be reconstructed as a roundabout with 2-lanes on the north leg, 2-lanes on the south, 2-lanes east, and 2-lanes on the west leg between 2041 and 2045 (Project#0700). connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID.83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org • The intersection of Star Road and State Street (SH 44) is listed in the CIP to be widened to 6-lanes on the north leg, 7-lanes on the south, 6-lanes east, and 6- lanes on the west leg 2036 and 2040 (Project#0830). • The intersection of Can Ada Road and State Street (SH 44) is listed in the CIP to be widened to 2-lanes on the north leg, 5-lanes on the east, and 5-lanes on the west leg, and signalized between 2036 and 2040 (Project#0835). • The intersection of Star Road and Ustick Road is listed in the CIP to be widened to 3-lanes on the north leg, 3-lanes on the south, 5-lanes east, and 5-lanes on the west leg, and signalized between 2026 and 2030 (Project#0860). • The intersection of Can Ada Road and Ustick Road is listed in the CIP to be widened to 3-lanes on the north leg, 3-lanes on the south, 5-lanes east, and 5- lanes on the west leg, and signalized between 2026 and 2030 (Project#0865). CIP Project Map - Roadways I 1 0070 0090 0100 0110 0120 0130 1070 Be I N Ln I 0510 0520 r 05411 0550 o p560 0570 Floating F * • N a CO EAG I STAR r CO w ux State St I n I r I � � I CO r G I a � I � � Chinden Blv in 25 CD 0 0 o o a ep o a al r 0950 0960 0 0970 0980 0990 r 1000 2 W o McMillan Rd 00 c4 a en 0 4= CDU I r o LO a I 1330 1340 1350 o stick Rd 1370 o a o f f °J I rn m o m r M O connecting you to more Ada County Highway District•5800 N Meeker Avenue- Boise,ID-83713-PH 2O8-387-6100• FX 345-7650-www.achdidaho.org CIP Project Map — Intersections I I ,x I o170� � � � � � 015o D14DD1BD 011 wo0710 0130 c 0435 0430 0418 �0400D38 i 042040 D39D 0410 C 0835 S TAR o828 C r � 082fiG .,x J State St 0830 i a f � � I c`4 a c I � � � �0260 02� �0222 �0 I � a a I 0700 �Ufi90 1010 �1020�10 Q 0 c m1 CJ a � 0865 0860 Ustick Rd a 08 I 1w In CC: Bill Parsons— City of Meridian Stephanie Hopkins— KM Engineering connecting you to more Ada County Highway District•5800 N Meeker Avenue• Boise,ID-83713•PH 2O8-387-6100• FX 345-7650•www.achdidaho.org