Loading...
HomeMy WebLinkAboutZ - Final Plat Approval COMMUNITY DEVELOPMENT WE PIDIAN --- DEPARTMENT REPORT HEARING 4/7/2026 Legend DATE: C3 Project Location TO: Mayor& City Council Area of Impact �= City Limits FROM: Linda Ritter,Associate Planner O Analysis 208-884-5533 lritter@meridiancity.org APPLICANT: Laren Bailey, Conger Group I—] SUBJECT: FP-2026-0003 Newkirk No. 2 -FP 4 LOCATION: Located at the corner of N. San Marco i Way and N. Zimmerman Way in the SE '/4 of the SW '/4 of Section 10 Township 3N,Range I W,Parcel: S 1210346850 I. PROJECT OVERVIEW A. Summary Final Plat consisting of 104 lots(95 building lots, 9 common lots) on 10.43 acres of land in the TN-R zoning district for Newkirk No. 2 Subdivision. B. Issues/Waivers None C. Recommendation Staff recommends approval of the proposed final plat with the conditions of approval in Section IV of this staff report. D. Decision City of Meridian I Department Report I. Project Overview II. COMMUNITY METRICS Table 1: Land Use Description Details Map Ref. Existing Land Use(s) Single Family Residential - Proposed Land Use(s) Single Family Residential Existing Zoning I Traditional Neighborhood—Residential(TN-R) VLA.2 Proposed Zoning Traditional Neighborhood—Residential (TN-R) Adopted FLUM Designation Medium High Density Residential VLA.3 Proposed FLUM Designation Medium High Density Residential Note: See City/Agency Comments and Conditions Section and public record for all department/agency comments received.Newkirk No. 2 FP-2026-0003 (copy this link into a separate browser). III. STAFF ANALYSIS Staff has reviewed the proposed final plat for substantial compliance with the approved preliminary plat(H-2024-0043) as required by UDC 11-6B-3C.2. The submitted final plat is for construction of the approved preliminary plat;therefore,the proposed plat is in substantial compliance with the approved preliminary plat as required. City of Meridian I Department Report II. Community Metrics IV. CITY/AGENCY COMMENTS &CONDITIONS A. Meridian Planning Division 1. The applicant shall comply with all previous conditions of approval for this development H- 2022-0088 (AZ,PP); DA Inst. #2023-051358 and#2025-062110,A-2023-0135 and H-2024- 0043 (PP and MDA). 2. The final plat shown in Section VI.E,prepared by Sawtooth Land Surveying,LLC, stamped on 2/16/2026 by Jeff Beagley,PLS, shall be revised prior to signature on the final plat by the City Engineer, as follows: a. Note#14: Include the instrument number for the ACHD sidewalk easement. b. Note#15: Include the instrument number for the City of Meridian water main easement. c. Note#16: Include the instrument number for the City of Meridian water main and emergency access easement. 4. The noncontiguous parcel (Parcel# S 1210346890)bisected by the Kennedy Lateral is unbuildable and shall be maintained by the deed owner(either Nampa&Meridian Irrigation District,Homeowners Association, or the current owner). Written documentation shall be provided to the City prior to the City Engineer' s signature on the final plat. 5. The landscape plan prepared by Jensenbelts Associates on 3/9/2026 by Kimberly C. Slegenthaler is approved as submitted. 6. All fencing shall be installed in accordance with UDC 11-3A-7. 7. The fencing along the Kennedy Lateral shall be a six(6)foot open vision fence per UDC I I- 3A-6C.3. 8. Off-street parking is required to be provided in accord with the standards listed in UDC Table 11-3C-6 for single-family dwellings based on the number of bedrooms per unit. 9. Provide a pressurized irrigation system consistent with the standards as set forth in UDC I I- 3A-15,UDC 11-313-6 and MCC 9-1-28. 10. Upon completion of the landscape installation, a written Certificate of Completion shall be submitted to the Planning Division verifying all landscape improvements are in substantial compliance with the approved landscape plan as set forth in UDC 11-313-14. 11. The applicant shall obtain the City Engineer's signature on the final plat within two(2)years of the date of approval of the preliminary plat(expiration date: March 18, 2027), in accord with UDC 11-6B-7, in order for the preliminary plat to remain valid; or, a time extension may be requested. 12. A Design Review application shall be submitted for all single-family attached,townhouse and multi-family structures within the development. Compliance with the design standards listed in the Architectural Standards Manual and any applicable guidelines in the TMISAP is required. The single-family attached and townhome structures are not required to incorporate porches along 30%of the front facades, and front-loaded 2-car garages do not have to be 20 feet behind the primary facade or designed with two(2) separate garage doors. 13. The Applicant shall comply with all conditions of ACHD. 14. Staffs failure to cite all relevant UDC requirements does not relieve the applicant from compliance. B. Meridian Public Works 1. Sanitary sewer service to this development is available via extension of existing mains adjacent to the development. The applicant shall install mains to and through this subdivision;applicant City of Meridian I Department Report IV. City/Agency Comments &Conditions shall coordinate main size and routing with the Public Works Department,and execute standard forms of easements for any mains that are required to provide service. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub-grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. 2. Water service to this site is available via extension of existing mains adjacent to the development. The applicant shall be responsible to install water mains to and through this development, coordinate main size and routing with Public Works. 3. All improvements related to public life,safety and health shall be completed prior to occupancy of the structures. Where approved by the City Engineer, an owner may post a performance surety for such improvements in order to obtain City Engineer signature on the final plat as set forth in UDC 11-5C-3B. 4. Upon installation of the landscaping and prior to inspection by Planning Department staff,the applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A. 5. A letter of credit or cash surety in the amount of 110% will be required for all incomplete fencing,landscaping,amenities,pressurized irrigation,prior to signature on the final plat. 6. The City of Meridian requires that the owner post with the City a performance surety in the amount of 125% of the total construction cost for all incomplete sewer, water infrastructure prior to final plat signature. This surety will be verified by a line item cost estimate provided by the owner to the City. The applicant shall be required to enter into a Development Surety Agreement with the City of Meridian. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. 7. The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20% of the total construction cost for all completed sewer, and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing provided by the owner to the City.The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. 8. In the event that an applicant and/or owner cannot complete non-life,non-safety and non-health improvements,prior to City Engineer signature on the final plat and/or prior to occupancy, a surety agreement may be approved as set forth in UDC 11-5C-3C. 9. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to the issuance of a plan approval letter. 10. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 11. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 12. Developer shall coordinate mailbox locations with the Meridian Post Office. 13. All grading of the site shall be performed in conformance with MCC 11-1-4B. 14. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill,where footing would sit atop fill material. City of Meridian I Department Report IV. City/Agency Comments &Conditions 15. The engineer shall be required to certify that the street centerline elevations are set a minimum of 3-feet above the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1-foot above. 16. The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 17. At the completion of the project, the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. 18. Street light plan requirements are listed in section 6-7 of the Improvement Standards for Street Lighting (http://www.meridiancity.org/public_works.aspx?id=272). All street lights shall be installed at developer's expense. Final design shall be submitted as part of the development plan set for approval, which must include the location of any existing street lights. The contractor's work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. Contact the City of Meridian Transportation and Utility Coordinator at 898-5500 for information on the locations of existing street lighting. 19. The applicant shall provide easement(s)for all public water/sewer mains outside of public right of way(include all water services and hydrants). The easement widths shall be 20-feet wide for a single utility, or 30-feet wide for two. The easements shall not be dedicated via the plat, but rather dedicated outside the plat process using the City of Meridian's standard forms. The easement shall be graphically depicted on the plat for reference purposes. Submit an executed easement(on the form available from Public Works),a legal description prepared by an Idaho Licensed Professional Land Surveyor, which must include the area of the easement (marked EXHIBIT A) and an 81/2"x I I" map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. All easements must be submitted,reviewed, and approved prior to signature of the final plat by the City Engineer. 20. Applicant shall be responsible for application and compliance with and NPDES permitting that may be required by the Environmental Protection Agency. 21. Any wells that will not continue to be used must be properly abandoned according to Idaho Well Construction Standards Rules administered by the Idaho Department of Water Resources (IDWR). The Developer, Owner, or project Engineer, shall provide a statement addressing whether there are any existing wells in the development, and if so, how they will continue to be used,or provide record of their abandonment.If wells are to be abandoned,the project owner or their representative must contact the IDWR Groundwater Protection Section(Aaron Skinner, Hydrogeologist 208-287-4972) BEFORE any work is done to decommission an existing well (even if it is believed that the well is less than 18 ft deep).Proof of communication with IDWR must be submitted to the City prior to any work being done to decommission the well. Failure to communicate with IDWR may result in additional work and expense to decommission the well. 22. Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9 4 8. Contact the Central District Health Department for abandonment procedures and inspections. 23. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water(UDC 11-313-6.). The applicant should be required to use any existing surface City of Meridian I Department Report IV. City/Agency Comments &Conditions or well water for the primary source. If a surface or well source is not available,a single-point connection to the culinary water system shall be required. If a single-point connection is utilized,the developer will be responsible for the payment of assessments for the common areas prior to development plan approval. 24. All irrigation ditches, canals, laterals, or drains, exclusive of natural waterways, intersecting, crossing or laying adjacent and contiguous to the area being subdivided shall be addressed per UDC 11-3A-6. In performing such work,the applicant shall comply with Idaho Code 42-1207 and any other applicable law or regulation. C. Idaho Department of Environmental Quality(DEQ) https:llweblink.meridiancity.or zlWebLink/Browse.aspx?id=434675&dbid=0&repo=MeridianCit Y D. Idaho Transportation Department(ITD) https:llweblink.meridiancity.or lWebLink/Browse.aspx?id=434675&dbid=0&repo=MeridianCit Y City of Meridian I Department Report IV. City/Agency Comments &Conditions V. ACTION A. Staff: Staff recommend approval of the proposed final plat with the conditions of approval in Section IV of this staff report. B. City Council: Pending City of Meridian I Department Report V.Action ' r � ct Location -• of •• �i Analysis s-�_ : PINE T FRANKL=INS OOOP ct Location R-4 0 rea of Impact Analysis V Y — m i.00i iiiGi: i��G�i i��:�i►� i�i:: - - :i~Q�iiiii:::.■ I�r=,f���►��� Ii�����►�� iiiniiii i'■■'►� r m •���iuu:►mmu. s c - ■► ►•up on nub PINE uu����ua_n�rhun r Hann �7Q �IJ 1111111 FRANKL=INS 9— nuNWPr, - ow, mwmi.nIN pm J z Legend NNW nw a.� ■ �n w AnalysisProject Location Area of Impact m �1�iin�■ - • - • IN, ii ttt�ttt�ttttt�r — a_ �� EZ- milli - �► -- �.■.i�:1 PINE ew GY Legend Project Location MiN Area of Impact .Ex City Limits Planned Parcels i�♦_ �C�.. i■. ♦� ♦ ♦I♦� ♦• •♦�t■:::=Oluu.0 .■■.■■►:pm►'t �1 ern` • . • • n Is Analysis p► 1■rlo'11^nT=V yr �unlogalu► ifi7mn�'I`uilqunu --� PINE 1 ±�' 111111711 I���I -.'Uttt=_°—C = �Q G� G-►„ • 3,�� , a nn. r .,•.�inu: --- — uun %nuu►�C 41111111111� IIII IIIIIIIIIIIIIU— _ =-- LIB__�_—__ •- �... S�! —=WR'ANKL=INS I I ;ununu.O •i. _ III I � __- ,,♦�♦�___ ,' W ` � Y'lllllrnnrynr`r„ U _ nunrrurr= �.o tun ■ �Im111 Illrlllllllll";;p��+_ �'' �• 5. Map Notes Nearby Recent Preliminary Plats(within last 5-years) H-2018-0110 H-2019-0076 H-2019-0089 H-2020-0010 H-2020-0099 H-2020-0113 H-2021-0035 H-2021-0063 H-2021-0081 H-2018-0125 H-2021-0096 H-2022-0079 H-2023-0020 H-2023-0018 H-2023-0054 H-2024-0006 H-2024-0010 H-2024-0011 H-2024-0018 H-2024-0030 H-2024-0026 H-2024-0051 H-2025-0026 Nearby Recent Conditional Use Permits(within last 5-years) H-2019-0066 H-2019-0120 H-2020-0039 H-2020-0060 H-2020-0074 H-2020-0099 H-2020-0113 H-2020-0120 H-2021-0063 H-2021-0081 H-2018-0125 H-2021-0096 H-2022-0004 H-2022-0001 H-2022-0088 H-2022-0084 H-2022-0079 H-2023-0045 H-2023-0053 H-2023-0049 H-2024-0010 H-2023-0071 H-2024-0029 H-2025-0024 H-2025-0006 City of Meridian I Department Report VI. Exhibits B. Service Accessibility Report PARCEL S1210346850 SERVICE ACCESSIBILITY Overall Score: 35 79th Percentile Criteria Description Indicator Location In City Limits Extension Sewer Trunkshed mains ¢ 500 ft. from parcel Floodplain Either not within the 100 yr floodplain or > 2 acres Emergency Services Fire Response time 5-9 min. YELLOW Emergency Services Police Reporting District meets response time goals most of the time Pathways Within 114 mile of current pathways Transit Within 114 mile of current transit route Arterial Road Buildaut Status Ultimate configuration (# of lanes in master streets plan) matches existing (#of lanes) School Walking Proximity Within 112 mile walking Either a High School or College within 2 miles OR a School ❑rivability Middle or Elementary School within 1 mile driving (existing or future) Either a Regional Park within 1 mile OR a Community Park Walkability Park within 112 mile OR a Neighborhood Park within 114 mile walking Report generated on 02-19-2026 by MERIDIAN\h1er City of Meridian I Department Report VI. Exhibits C. Preliminary Plat(date: 1/1/2026) si,err worr PREU INARYSUBDIVISION PLAT SIGN OR NEWKIRK SUBDIVISION PHASE 2 eow.sem.nonx,x„xee i ueeNo zoz• c r ;�. -- ___1_______ i N � xvam li z PP1.4 w� � 7 x 5�� 1 _ Ems j - --- - - --•;iL TTT PP1.1 City of Meridian Department Report VL Exhibits Y �Y[ >Fp In PP2.0 f... � " Y �Y[ 1 IN, s s i! SEWEA ONE'C PRELIMINARY FROFIU Y„ r Sr+l Ns0 eo,x.w 1 SEWERLINE'AMAUMIN YFRORU S sr � EEE r _ SEWER UNFF MWMI"RY PAORLE ry srw/+solo�c.my2Fg � N G g - --- - ----- - --- ---- ----- s N � Y xY Y z SEWER LINE'O'PRELIMINARY PRORLE PP2.1 City of Meridian Department Report VI. Exhibits NEWIQHK SUBLPA45ION NO,2 SDOKJ PAS' tl�1574 �,.,,m,Q H'�M r.��aw.a,� 20305.WAFIING7pN AYE. EMP}E"I'1;to 83617 {108)3988109 ,._nm..r8- uvrw-rmn.rwa,c.xz. raewmrcwoe r ory FAX(206)398-8105 ter.„.....u.w�ro.>� ��_ L.�.,,��,c�,�;[L/G/www.s4wrooTNs.com NEWKIRK SUBDIVISON NO.2 NEa<9H cfrsrrrrurl Rafwovu of cmcaiNcn- arrr��,m.�,.A.or�.a>�ar.�H�nr....a.�xr.,� rrnrmraar afcamrtr.vFverae �amEn�i�os'®s`ur°.�m°'H'"sEnvun�ern11M1Omxv�°AwrmfOPinrAS°in�xiam��Nu�mn�rs"iuru"n.�ve�s RMNWW.OFAVA OWN)1'kIGHWRY06rFlCr mPIIFI!T£OF[dPIIYTFEl91RER cawrv,manwvmnxr ogre Ervrt vmrpm7rto,aaary rs-A,*.rrnpa1orcq m:-m+rr cMna,anniwn,omrneneMa[rrc+ns or so-ixy aagxEerfmmr mr.wvawwaawrtAvnaamiWUMrwruT'rM'Es nw wFwttun �njm�s amx,��o4Mrcv+s+q'wK RfY+MMlM N.1 mn'RnVIw.Rv6 Wuortv'ra NFYl nllury RPRiWAL OF QiY fNOHffA LYINMYFfCOlt0EF5 CEFTfmCATE 5urmam�vn.mvErvr,�rtHD,x.xo roaramvff x®,wy.rumwrtr,,u%mvtrtmv mmmrd•�J$rws Hfr YrEx[,AkSf OrSnWKAYNLw65AVF,+nS u[.Al_ „ ii574 za3os.waswNv7nivave, . � EMMFTT,10 R3617 (208)398-8104 /-�FAX(2W)396-8I05 ✓%✓-7 LaxlSun�cyir�!-LG www.sawreonrcsceM City of Meridian Department Report VI. Exhibits A Final Plat(date: 2/01/2026) NEWKIRK SUBDIVISION NO.2 LOCATED IN THEE112 OF THE SWI/4 OFSEMON 10,T 3 N.,R.I W.,B.M., CITY OF MERIDIAN,AM COUNTY,IDAHO 2026 ------------------- 0 lee '. +\ \?•` T I d dk7 (209) S.WASHIffirM AVE. EMMETT,ID 83617 398-8104 1074S OO��FAX 208 398-0105 �.�. - o• ., Aawfi LoidSrmryiiy LLG wAw.sawraoTH�s.caH NEWKIRK SUBDIVISION N0.2 8" E"— 3)®� / �`,.�..:.� 77-�, m� � kr.: =.a tilt m$ # � rr 9EE5 --_—_— �,w! 97 i sl A���•�PI,Q,�I a �I 90�� :""� m ; 11574 g ■ ® 2030 S.WASHING70NA- EMMFTT,ID 83617 (208)398-8109 m ��,T� FAX(2aS)398-8105 ®_ �L-ord 5urvcyi[q.LLLL/I^.�WAM1v 54WroonlLimR ® . l— 7— City of Meridian I Department Report VL Exhibits NEWKIRK SUBDIVISION NO.2 B" PAGE L,�a..Sao smarm nesrwwcn.rumravum��r, / �o�u Mac unrserm rnesxmwr mare wavnrrreuwu 2030 EMW ,Id(BM 7 mivmmM nsaary�mmriaa rimo�iwr rre iwm emxe FMMtTT,IDB A y (296)398-8109 �����: vmawrcwnvxw.nxw.rou ,dA FAX(708)398-8105 NEWKIRK SUBDIVISION NO.2 soacJ vaGE ,ag��,m�a<�v,�r<,n.Po..a.ox,�r.�uo•,a�r�m.mar,wrE axrmure os ax5m�rxFanxse amaovx oFrnvc�Nsw mumr ucmu�rzs�r�urE 11574 $ 2030 S.WASWN67ON AVF. AM —E]T,ID 83617 (208)398-8104 H 5V FAX(209)398-81 Q5 L�mYI[JSuru/ryi�j LL�G�wwwsowroo*res-caa City of Meridian Department Report VL Exhibits E. Landscape Plan(date: 3/9/2026) ETCH E l____�___MAJill TCH E N W m i 1\y NOTE5 > 4 0 d J= \ _ 4,R \\ LAIOBGAPE r 1 PLAN ' L1 KEY MAP �"�" \;•�''•'"' PLANT SCHEDULE __--_____, N r IL r ; r — 90 c e NOTES G ---------- a.b. IL ul r : _ r s MATCH-L. T HNNE L1 MATCNIJNE LI LAM8CAPE PLI1N L�AO �r x.ms.r ry17�� KEY MAP LG City of Meridian Department Report VI. Exhibits a" PLANT 5CHEDULE r .,. ♦,we.�wiro.,u•..w.art<..•aph ro.,we+..�c m ® VINYL PRIVPLY FEIJLE r ev" _ w ,.,ewe�.s nmar.em,s,e�.m Mt •—�•uL�mv O TREE PLAHTI TA— Q a ,�..ao ......,..�.,. V O WX .,....«.,.�.,..� ��1� �.... NOTES G c 5= 7 ao O SHRUO RANTING __ ® IRON FEiwE __� dEL Lu LANDSCAPE CALCULATIONS •� .aww, ��� Z 0 R_ANiEN cur seo Erie •�•`"��,� �,�' "°•�' e..Ineswn.e..ew�..,..�K..w�.m...nw.�, ,ne. �ETAILB ADUALS L3 �_._ ..-._._.. aF- 00 Lu �.r.��.-..��•�.._ �__.-tea_ �..�4-- _s�..ems v_�� .._.._....._... -- �e w. ��- � � - L4 City of Meridian Department Report VI. Exhibits F. Qualified Open Space Exhibit(date: 8/27/2024) - n y I � I I , I I yJ I I $ � z O o Z 0 Zrn m N n O a Z p 7C \ m > Z z a m y, F � W M ran*+ y m yr S FF O 2 0 `\ > 00 Z `I--,_ D \ D n D n rn 8 S � m � N a ?� City of Meridian Department Report VL Exhibits G. Site Amenities Newkirk 2 A. Quarter Acre Dog Park (Block 3, Lot 6) (11,880 sq ft) f • Fenced area t , • Waste Station r • Sitting Benches is ANA- 4� City of Meridian I Department Report VI. Exhibits The Newkirk and Newkirk 2 Neighborhood residents have access to all amenities in both developments. Newkirk (approved in 2023) A. Large One-Acre Play Park —The Newkirk Neighborhood Park will contain the following recreation facilities: • Play Structure • Swings • Seating Benches 1 r • Shade Structure x • Climbing Rocks c, • Climbing Dome SS • Large Grass play area i`, 1; • Attractive Landscaping • Playground fencing for safety trm) s .L« t / i B,.H lhW� OF 9) (71'� , i �� L i 1 ■ City of Meridian Department Report VI. Exhibits B. Pathways—The Newkirk Neighborhood will include the following pedestrian pathways: • 5'Wide Separated Pedestrian Pathway on Both sides of N.San Marco Way—2,770 LF Pedestrian pathways within the Newkirk F� Neighborhood will total over one half mile in length. — 5' PATH HAY C. Pathway Park-The Newkirk (TYP) Neighborhood Park will contain a small pedestrian ei Ra + park including: • Shade Structure • Additional Pathway • Seating Areas • Attractive Landscaping 5HADE 5TRUGTU2E (TYP) City of Meridian Department Report VI. Exhibits H. Building Elevations ABRED 6�t,0'CDRGCL WOOD Bi89r0NC WJ Im ROOFNG X YR. -=I Single-Family +Xi-GATT,,.I6"O C F.4ALT slwCiES Attached F 561ap-SILE D ROOFNO 9TANDE G P SMAR 9WE 8'FASC FA5:.1.�. METAL r� �J r - •worn a' rTAGF L Av L —COWL L XNEE GRACE LP 9MAR—I'Fb-GORnER DOOR�Vi R6 TRII✓i�1"[: 96VArygE 1.1D1•T11 ON FUGF-.f.1DFR L No COLOR NRNE COLOR NO. DARK SWAN LETAL WA 1 3 3 _ e 2 GR eEDATE 9W61e6 NT ■ ■ ■ ■ ■ 3 ELLECTUAL EY GW1w A 'HARM STONETOWE 9Wr031 � 5 CkAAcoAL GLACX N'A Deal 33 6 NNRE VINYL WOO FRAAE N'A .r.r...... Alley Loaded Three-plex swnt50t rxq'rascu' xu nO rinG smNory wcF lw 3D rn uurmnlG UReaLc wa saver wneen ,Ile'SH1 11 bU. "'..G.L•A+LLL RJT SHWli SrIRCiL_ J[I1t'NN'eV4➢OVt-GYC JM i'.\'It1U0I:TRY'Po+-4 m Lc„c I¢.eeR rnl U',3'COO BLG SIDnlL'H I"•:3'EaTTS AT•fi•O� - 'J:.F'�r.f - '.�F .TRUW'GOD4 L.p c LING e LY SMARi�IUE :::L LPV NlX:C"�::F•'i _ 1 z No. COLOR NAME COLOR No, s o■ ■ ■ + CL.SSIC FREN[N-RIF, SNDDT • FEIILaNO 5'NTSiA 3 5ECATE GREY 5•N6169 MMFRNF,I1W1E V.tee STAIN.CPESTIVT S'N1". b G e DrRX MEMO GRD'WI,c,r Wf T CPMCOAL BLACK e e1ACXVMLwsa.rRYt N'A 2 De O,= •••••••••- City of Meridian Department Report VL Exhibits I. Emergency Access Exhibit vt Pit 1 �7 .vth74L•YiFia' .�avd. ...+� _ ..j..... j.... -i.. ..1:a.'_ = • ...-... �{ice'�_ q YJit City of Meridian Department Report VI. Exhibits VII. ADDITIONAL NOTES &DETAILS FOR STAFF REPORT MAPS,TABLES,AND CHARTS (link to Community Metrics) A. One-Mile Radius Existing Condition Notes This data is automatically derived from enterprise application and GIS databases, and exported dynamically. Date retrieved notes generally reflect data acquired or processed within the last 30- days. Analysis is based on a one-mile radius from the centroid of the identified parcel. Parcel based data excludes certain properties and represents land as it exists now. Properties considered are only those with a total assessed value greater than 0(i.e. excludes most HOA area,transitional development, government, and quasi government facilities). The following values also constrain included property acreage to reduce outliers and non-conforming instances from distorting averages: R-2< 5.0; R-4<2.0; R-8 < 1.0; R-15 <0.5;R-40<0.25. Conditional Use Permits and Preliminary plat data likely include duplicate project submittals as they may be for the same project, approved at different times through multiple application types. Consider each independently or review prior application approvals. Some approved entitlements, and particularly older ones,may be constructed. Decennial population counts and household counts are based on the most recent Decennial Census. Current population and current household values are COMPASS estimates,usually for the year previous, and are based on traffic analysis zone boundaries(TAZ's). B. Mixed Use Analysis Notes This data is derived from enterprise application and GIS databases,and exported dynamically. Data considered for analysis are only those areas overlapping the overall Mixed Use boundary area. Mixed Use areas across arterial roadways are distinct, separate, and not considered as they do not meet the mixed use principles in the Comprehensive Plan(e.g.pedestrian safety, transportation efficiency,etc.). Mixed Use parcel areas may be greater or smaller than the future land use area designation boundary due parcel size,configuration,right-of-way, and other factors. Conditional Use Permits and Preliminary plat data likely include duplicate project submittals as they may be for the same project, approved at different times through multiple application types. Consider each independently or review prior application approvals. C. Service Assessment Notes This data represents existing conditions derived from our enterprise application and GIS database, exported through dynamic reporting. The system references the most recent available data from various sources, including sewer main lines, sewer trunksheds, floodplain, fire service areas and response times,police crime reporting,pathway information, existing and planned transit, roadway improvements, school and park proximity,and other resources. The tool provides context for project review,using multiple indicators consistently. Data from similar topics may vary based on different levels of review. The overall score is based on weighted criteria(not a ranked order), and the percentile score compares the parcel to others in the city(higher is better). This tool was developed as a City Council priority and outcome of the 2019 Comprehensive Plan. Scores,whether high or low, are just one data point and should not be the sole basis for decisions. City of Meridian I Department Report VII. Additional Notes&Details for Staff Report Maps, Tables, and Charts D. ACHD Roadway Infographic Notes The Ada County Highway District utilizes a number of planning and analysis tools to understand existing and future roadway conditions. • Existing Level of service(LOS).LOS indicator is a common metric to consider a driver's experience with a letter ranking from A to F.Letter A represents free flow conditions, and on the other end Level F represents forced flow with stop and go conditions. These conditions usually represent peak hour driver experience. ACHD considers Level D, stable flow,to be acceptable. The LOS does not represent conditions for bikes or pedestrians,nor indicate whether improvements: are possible; if there are acceptable tradeoffs; or if there is a reasonable cost-benefit. • Integrated Five Year Work Plan(IFYWP). The IFYWP marker(yes/no)indicates whether the specified roadway is listed in the next 5-years. This work may vary, from concept design to construction. • Capital Improvement Plan (CIP). The CIP marker(yes/no)indicates whether the specified roadway is programmed for improvement in the next 20-years. City of Meridian I Department Report VII. Additional Notes&Details for Staff Report Maps, Tables, and Charts Development Application Transmittal Link to Project Application: Newkirk Sub. No. 2 FP-2026-0003 Hearing Date: 4-7-2026 Assigned Planner: Linda Ritter To view the City of Meridian Public Records Repository, Click Here The above "Link to Project Application" will provide you with any further information on the project. The City of Meridian is requesting comments and recommendations on the application referenced above. To review the application and project information please click on the application link above. The City of Meridian values transparency and makes a variety of information available to the public online through our public records repository. We request that you submit your comments or recommendations prior to the hearing date specified above. When responding, please reference the file number of the project. If responding by email, please send comments to comment(a�meridian city.org. For additional information associated with this application please contact the City of Meridian Planner identified above at 208-884-5533. Thank you, City Clerk's Office 33 E. Broadway Ave., Meridian, Idaho 83642 Phone: 208.888.44331Email: cityclerk(a-meridiancity.org Built for Business, Designed for Living All e-mail messages sent to or received by City of Meridian e-mail accounts are subject to the Idaho law, in regards to both release and retention, and may be released upon reauest, unless exempt from disclosure by law.