HomeMy WebLinkAbout2026-03-27 Boise Project Board of ControlRICHARD DURRANT
CHAIRMAN OF THE BOARD
WILLIAM PATTERSON
VICE CHAIRMAN OF THE BOARD
ROBERT D. CARTER
PROJECT MANAGER
THOMAS RITTHALER
ASSISTANT PROJECT MANAGER
APRYL GARDNER
SECRETARY -TREASURER
MARY SUE CHASE
ASSISTANT SECRETARY -
TREASURER
City Clerk's Office
33 E Broadway Avenue
Meridian ID, 83642
OPERATING AGENCY FOR 167,000
BOISE PROJECT BOARD OF CONTROL ACRES FOR THE FOLLOWING
IRRIGATION DISTRICTS
(FORMERLY BOISE U.S. RECLAMATION PROJECT)
2465 OVERLAND ROAD
BOISE, IDAHO 83705-3155 R
NAMPA-MERIDIAN DISTRICT
DISTRICT
ECEIVE� NOWILDERKDDTRICT
MAR n I 2026 BIG BEND DISTRICT
25 March 2026
RE: Apex Zenith
E Lake Hazel and South Meridian Rd, Meridian
Boise-Kuna Irrigation District
Rawson Canal 259+90
Sec. 06, T2N, R1E, BM,
Nick Napoli:
CITY OF Cif sNt=/
CITY CLERKS OFFICE
PP-2026-0006
TEL:(208)344-1141
FAX:(208)344-1437
There are no Boise Project or Boise-Kuna Irrigation District facilities located on the mentioned property, property, however it does in fact possess a valid water right.
Per Idaho Statutes, Title 42, local irrigation drainage ditches that cross this property, to serve neighboring
properties, must remain unobstructed and protected by an appropriate easement by the landowner,
developer and contractors. Landowner/developer must do their due diligence to contact all owners of
neighboring properties on this matter
Storm Drainage and/or Street Runoff must be retained on site.
NO DISCHARGE into the live irri atg_ion system is permitted.
Whereas this property lies tivithin the Boise-Kuna IrrigatiV. on. District it is important that
rresentatives of this development contact their o ff ce as soon as possible to discuss the pressure
system prior to anv costly desijzn work. Ifavolicable, the irrigation system will have to be built to
specific specifications as set by the District/Project.
Written confirmation from the Boise-Kuna Irrigation District and the City ofMeridian is renuired
as to who will own and operate the irri ate sy tem.
If the district is to own and operate this pressurized irrigation system, Boise Proiect Board of
Control will require a set of plans be sent to Jim Money, Civil Stu•vey Constdtctnts, Inc. cd 1400
E. Watertower Street, Meridian, Idaho 83642-3513 for his review, comments and approval.
This development is subject to Idaho Code 31-3805, in accordance, this office is requesting afull-
size hard copy of the irrigation and drainage plans.
Whereas this development is in its preliminary stages, Boise Project Board of Control reserves
the right to require changes when our easements and/or facilities are affected by unknown factors
even during the approved construction phase.
If you have any further questions or comments regarding this matter, please do not hesitate to
contact me at (208) 344-1141.
Assistant Project Manager, BPBC
for/tr
cc: Kevin Reeves Watermaster, Div. 2 BPBC
Alicia Flavel Secretary — Treasurer, BKID
W c
otf mo
� .00MIN
Oft � m
cv
vai
's- 0 vi
Sai nt low
0) U
G '
N o0
ca4a
nO u
L ++ NUNN
'L
r E H G
Cl) ME
L' CNINE 'O O
C)O jf0Main
A f0
N d m o+
W o E 'L
M m (D
G� N � m _
N 0) N
ULEE
� O IME U
SEEM
a
O� 3tm0
.«; '- m
a`
N z 1. _
r L z 3 a
� a �
a W a
FEW
= W
lid as Q
J � m
r � o
�U
C
Ql �
� N N
d E
N J E
Q. U
g
a z o
MEW U)
�Ln
EI
o 00
1 CDAl z � N CD
a z _
w
O o En
'
2LU
N � �a
flow O �o
o- g = � m
�, o Z
m V z
0 0as
Los z Y CA o
m au