Loading...
HomeMy WebLinkAbout2026-03-30 Boise Project Board of ControlRICHARD DURRANT CHAIRMAN OF THE BOARD WILLIAM PATTERSON VICE CHAIRMAN OF THE BOARD ROBERT D. CARTER PROJECT MANAGER THOMAS RITTHALER ASSISTANT PROJECT MANAGER APRYL GARDNER SECRETARY -TREASURER MARY SUE CHASE ASSISTANT SECRETARY - TREASURER City Clerk's Office 33 E Broadway Avenue Meridian ID, 83642 BOISE PROJECT BOARD OF CONTROL (FORMERLY BOISE U.S. RECLAMATION PROJECT) 2465 OVERLAND ROAD BOISE, IDAHO 83705-3155 26 March 2026 RE: Apex Cadence Sub No 1 FP-2026-0001 6575 Locust Grove Rd, Meridian Boise-Kuna Irrigation District BK- 145 C Rawson Canal 206+50 Sec. 06, T2N, R1E, BM. Sonya Allen, Planner: OPERATING AGENCY FOR 167,000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT TEL: (208) 344-1141 FAX:(208)344-1437 CITY �1T(CLERKS OFFICE The United States' Rawson Canal lies within the boundary of the above -mentioned location. The easement for this canal and lateral is held in the name of the United States through the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 3910 43 U.S.C. 945) if approved. The Boise Project Board of Control is contracted to operate and maintain this canal. We assert this Federal easement of 40 feet both directions of the Rawson Canal centerline. Whereas this area is for the operation and maintenance of our facility, no activity should hinder our ability to do so. If the original landscape is planned to be excavated more than 10 feet 1,2004 or 11.3 degrees) within 50 feet of the above quoted federal easement, Boise Project will require that the canal/lateral to be piped/concrete lined by the landowner or developer to include all required box structures and deliveries within the project boundaries. Piped canals/laterals could get a reduced easement if agreed upon by Boise Project and the landowner/developer. The Boise Project does not approve landscaping (gravel only) within its easements, as this will certainly increase the cost of maintenance. The easement must remain a flat drivable surface. All public roadways must be outside of this easement. Easement must remain a flat drivable surface. No variances will be granted. Fencing, gates, pathways and pressurized irrigation lines (as may be required) must be constructed just off the lateral easement, to ensure public safety and prevent encroachments. No variances will be granted. The construction of any roadway crossings must be conducted only during the non -irrigation season when the lateral is dewatered. In any case no work shall take place within the easement before the proper crossing agreements have been secured through the Bureau of Reclamation and the Boise Project Board of Control. Project facilities and/or easements that parallel and are within and/or intended to be within road right -of --ways due to any development of this property must be relocated outside of road right-of- ways. Utilities planning to cross any project facility must do so in accordance with the master policies now held between the Bureau of Reclamation and most of the utilities. In any case no work shall take place within the easement before proper crossing agreements have been secured through both the Bureau of Reclamation and the Boise Project Board of Control. Crossing agreements must be secured and signed by all parties prior to March 1st of each year. A time schedule for the construction to be done during the non -irrigation season must be approved by Boise Project prior to any activity within Project easements. No construction will be allowed within the easement boundaries of the Boise Project Board of Control facilities after March lst of each year. However, on a case -by -case basis, overhead utilities and utilities boring underneath a Project facility may be allowed after March lst if reviewed and approved by the Boise Project. Storm Drainage and/or Street Runoff must be retained on site. NO DISCHARGE into the live irri atg_ion system is permitted. Per Idaho Statutes, Title 42, local irrigation/drainage ditches that cross this property, to serve neighboring properties, must remain unobstructed and protected by an appropriate easement by the landowner, developer and contractors. Landowner/developer must do their due diligence to contact all owners of neighboring properties on this matter. This development is subject to Idaho Code 31-3 805, in accordance, this office is requiring a hard copy of the irrigation and drainage plans be delivered to the Boise Project office. e be built to specific specifications as set by the District /Project. as to tivho will otivn and operate the irrigation system. the district is to 0 E. set as possible to discuss t di Inc. tct Wording on the preliminary and final recorded plat needs to state that any proposed and/or future usage of the Boise Project Board of Control facilities are subject to Idaho Statutes, Title 42-1209. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the right to require changes when our easements and/or facilities are affected by unknown factors even during the approved construction phase. If you have any further questions or comments contact me at (208) 344-1141. Assistant Project Manager, BPBC regarding this matter, please do not hesitate to for/tr cc: Kevin Reeves Watermaster, Div. 2 BPBC Alicia Flavel Secretary — Treasurer, BKID File (D .a W T N C rtt i M 0 CD.N T O v O O q J T (n C/) 4- O v o. <u N 2 d Y � J �w = 4- O L(n o Z N C 1 ,0 T V W a T O O O r CO N O N am LL LL 0 ra a) w to O O V CL c a E .> Om a) o n N U Q)) a � m Ln M M <<U o w �rro �Ln3: M N J M p Q vmEi Lr)o Ln p rV rt' +"t rl �9 it Qa X '� r0 L v m o Immo U O _aL no UP) Qj O M - Ln 0 N O 00 U � !E v O O D a to 0 _ c fu CIE � N Q = CD i O N Q) _ RE Q � o r6 o �(,r)o �E U C C .� '% fu rn O (1) Q U m i z yltr� ?] �I%• `' W A